Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.1 CrAdmitted-Finance NO 28 A SUNTHARA VINAYAGAR KOVIL STREET PALAYAPETTAI GANDHI NAGAR POST TIRUNELVELI 627 008 | TIRUNELVELI | TIRUNELVELI | TAMIL NADU | 627008 | L1 | Admitted-Finance | |
| 2 | L2₹7.1 Cr+₹65,372 (0.09%)Admitted-Finance NO 1 4 56 Y SRI BHARATHI NAGAR OPP PARVATHI THEATER CUMBUM ROAD THENKARAI PERIYAKULAM THENI DT 625 601 | PERIYAKULAM | THENI | TAMIL NADU | 625601 | L2 | Admitted-Finance | |
| 3 | L3₹8.2 Cr+₹1.1 Cr (15.9%)Admitted-Finance NO 6 I 24 AYYAKKARAN THOTTAM VAIGAI VADAKARAI MADURAI 625 002 | MADURAI | MADURAI | TAMIL NADU | 625002 | L3 | Admitted-Finance | |
| 4 | L4₹8.2 Cr+₹1.1 Cr (16.1%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | L5₹8.6 Cr+₹1.5 Cr (21.5%)Admitted-Finance NO 15B 17C PANAGAL 2ND ST MATHICHIYAM MADURAI 20 | MADURAI | MADURAI | TAMIL NADU | 20 | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | K.SARAVANAKUMAR L4 | Priyadharshini Construction L2 | Sp Constructions L1 | petchimuthu L3 | S KUMARA PANDIAN L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation in hard stiff clay, stiff black cotton, hadr red earth, shales, murrum, gravel, stoney earth mixed with small size boulders and hard gravelly soil with initial lead of 10 m and lift of 2 m | 335 | m3 | 132 ₹44,220 | 131 ₹43,885 | 131 ₹43,885 | 150 ₹50,250 | 120 ₹40,200 Lowest |
| 2.00 | Supplying and filling of M sand in foundation and basement with well watering and consolidation as per std.specn. including cost of all labour, lead, lift, etc, complete. | 18 | m3 | 2,300 ₹41,400 | 1,000 ₹18,000 Lowest | 1,000 ₹18,000 Lowest | 1,300 ₹23,400 | 1,800 ₹32,400 |
| 3.00 | PCC 1:3:6 mix using 40mm HBS machine crushed metal for foundation with out formwork including cost of all labour, materials, lead, lift, curing, etc., complete. | 35 | m3 | 5,880 ₹2,05,800 | 5,000 ₹1,75,000 Lowest | 5,000 ₹1,75,000 Lowest | 6,100 ₹2,13,500 | 5,600 ₹1,96,000 |
| 4.00 | RCC 1:1.5:3 using 12-20mm graded hard machine broken granite stone, including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement. For footing concrete. | 23 | m3 | 12,600 ₹2,89,800 | 10,000 ₹2,30,000 | 10,000 ₹2,30,000 | 8,900 ₹2,04,700 Lowest | 12,000 ₹2,76,000 |
| 5.00 | RCC 1:1.5:3 using 12-20mm graded hard machine broken granite stone, including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement. For column concrete. | 34.4 | m3 | 27,300 ₹9,39,120 | 23,000 ₹7,91,200 | 23,000 ₹7,91,200 | 16,000 ₹5,50,400 Lowest | 27,000 ₹9,28,800 |
| 6.00 | Refilling the foundation and basement with excavated earth including ramming as per specification , cost of all materials lead and lift etc. complete. | 225 | m3 | 100 ₹22,500 | 50 ₹11,250 Lowest | 50 ₹11,250 Lowest | 50 ₹11,250 Lowest | 200 ₹45,000 |
| 7.00 | RCC 1:1.5:3 using 12-20mm graded hard machine broken granite stone, including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement. For Grade beam concrete at Existing Ground level | 35 | m3 | 14,000 ₹4,90,000 | 13,100 ₹4,58,500 | 13,100 ₹4,58,500 | 11,000 ₹3,85,000 Lowest | 14,000 ₹4,90,000 |
| 8.00 | Supplying and filling of gravel above grade beam all cost of materials, lead, lift, labour etc., complete. | 345 | m3 | 500 ₹1,72,500 | 450 ₹1,55,250 | 450 ₹1,55,250 | 150 ₹51,750 Lowest | 550 ₹1,89,750 |
| 9.00 | RCC 1:1.5:3 mix using 12mm to 20mm HBS metal (machine crushed) for plinth beam with form work including cost of cement all labour, materials, lead, lift etc. complete. | 7 | m3 | 14,100 ₹98,700 | 13,100 ₹91,700 Lowest | 13,100 ₹91,700 Lowest | 14,000 ₹98,000 | 14,000 ₹98,000 |
| 10.00 | Providing PCC 1:3:6 using 40mm metal 100 mm thick graded hard machine broken granite stone, including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement. For Floor PCC. | 22 | m3 | 6,000 ₹1,32,000 | 5,000 ₹1,10,000 Lowest | 5,000 ₹1,10,000 Lowest | 6,100 ₹1,34,200 | 5,600 ₹1,23,200 |
Tender Value
Refer Docs
EMD Value
₹7.8 L
Closing Date
23 Mar 2026, 12:00 pmClosed
CE/TP SO/Madurai
CE/TP SO/Madurai
Civil and Electrical works for E.Kumaralingapuram
2026_EB_674064_1
CE/TP SO/MDU Specn.No.027/2025-26
Open Tender
Electrical Works
Works
180 days
Madurai
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹7.8 L
2 Jul 2026
13 Mar 2026
24 Mar 2026
13 Mar 2026
23 Mar 2026
13 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation in hard stiff clay, stiff black cotton, hadr red earth, shales, murrum, gravel, stoney earth mixed with small size boulders and hard gravelly soil with initial lead of 10 m and lift of 2 m | - | m3 | - | - |
| 2 | Supplying and filling of M sand in foundation and basement with well watering and consolidation as per std.specn. including cost of all labour, lead, lift, etc, complete. | - | m3 | - | - |
| 3 | PCC 1:3:6 mix using 40mm HBS machine crushed metal for foundation with out formwork including cost of all labour, materials, lead, lift, curing, etc., complete. | - | m3 | - | - |
| 4 | RCC 1:1.5:3 using 12-20mm graded hard machine broken granite stone, including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement. For footing concrete. | - | m3 | - | - |
| 5 | RCC 1:1.5:3 using 12-20mm graded hard machine broken granite stone, including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement. For column concrete. | 0.9 | m3 | - | - |
| 6 | Refilling the foundation and basement with excavated earth including ramming as per specification , cost of all materials lead and lift etc. complete. | - | m3 | - | - |
| 7 | RCC 1:1.5:3 using 12-20mm graded hard machine broken granite stone, including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement. For Grade beam concrete at Existing Ground level | - | m3 | - | - |
| 8 | Supplying and filling of gravel above grade beam all cost of materials, lead, lift, labour etc., complete. | - | m3 | - | - |
| 9 | RCC 1:1.5:3 mix using 12mm to 20mm HBS metal (machine crushed) for plinth beam with form work including cost of cement all labour, materials, lead, lift etc. complete. | - | m3 | - | - |
| 10 | Providing PCC 1:3:6 using 40mm metal 100 mm thick graded hard machine broken granite stone, including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement. For Floor PCC. | - | m3 | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
cancelled_1.pdf
pdf • 0.19 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.00 MB
BOQ_810196.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .