Tender Value
₹2.1 Cr
EMD Value
₹2.6 L
Closing Date
24 Aug 2026, 5:00 pmDue tomorrow
Staff Officer (Civil), SECL, Gevra Area
Office of the Staff Officer(Civil) , SECL, Gevra Area, PO Gevra Project, Distt.- Korba (CG)Contact No. 6232015388
Repair and Renovation of Budhwari Market Area Under Gevra Area.
2026_SECL_363254_1
SECL/GA/SO(C)/e-T/26-27/13 DT. 06.08.2026
Open Tender
Civil Works - Others
Percentage
240 days
GEVRA AREA
Please refer Tender documents.
5 documents required · 5 mandatory
₹2.6 L
8 Aug 2026
8 Aug 2026
26 Aug 2026
8 Aug 2026
24 Aug 2026
9 Aug 2026
8 Aug 2026 - 17 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1PART (A)Shed & Other works | |||||
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 431.82 | cum | 187.5 | ₹80,966.25 |
| 1.02 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm nominal size) | 177.3 | cum | 5,206.4 | ₹9,23,094.72 |
| 1.03 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) | 106.81 | cum | 6,660.3 | ₹7,11,386.64 |
| 1.04 | Centering and shuttering including strutting, propping etc. and removal of form for :Columns, Pillars, Piers, Abutments, Posts and Struts | 276.6 | sqm | 663.15 | ₹1,83,427.29 |
| 1.05 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Cold twisted bars | 7,476.7 | kg | 90.2 | ₹6,74,398.34 |
| 1.06 | Brick work in Cement mortor 1:6 ( 1 cement 6 coarse sand) with fly ash bricks of size 230 x 110 x 70 mm and having crushing strength of 75Kgs/Sqcm to 100 Kgs/Sqcm as per the specification in : Foundation & plinth | 87.98 | cum | 5,030.45 | ₹4,42,578.99 |
| 1.07 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 587.82 | cum | 122.95 | ₹72,272.47 |
| 1.08 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 511.85 | cum | 1,150.15 | ₹5,88,704.28 |
| 1.09 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 40,576.59 | kg | 104.15 | ₹42,26,051.85 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.00 MB
Tendernotice_2.pdf
PDF • 0.66 MB
Tendernotice_3.pdf
PDF • 1.45 MB
BOQ_376171.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].