Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical H NO 1100 SECTOR 3 124001 | ROHTAK | HARYANA | 124001 | Accepted-Technical document founds in order |
| 2 | Accepted-Technical HOUSE NO 2404 GROUND FLOOR SECTOR 13 HUDA BHIWANI TEHSIL AND DISTRICT BHIWANI 2025R24022 | BHIWANI | BHIWANI | HARYANA | Accepted-Technical document founds in order |
| 3 | Accepted-Technical HOUSE NO 953 SECTOR 23 HUDA BHIWANI TEHSIL AND DISTRICT BHIWANI | BHIWANI | BHIWANI | HARYANA | Accepted-Technical document founds in order |
| 4 | Accepted-Technical 81 ARYA NAGAR ASSANDH ROAD PANIPAT HARYANA 132103 | PANIPAT | HARYANA | 132103 | Accepted-Technical document founds in order |
| 5 | Accepted-Technical CHARKHI DADRI | CHARKI DADRI | HARYANA | 127022 | Accepted-Technical document founds in order |
Tender Value
₹6.1 Cr
EMD Value
₹12.2 L
Closing Date
1 Jul 2026, 4:00 pmClosed
SANJEEV KUMAR TYAGI
Hansi PHED
AUGMENTATION OF WATER SUPPLY SCHEME AND LAYING OF DISTRIBUTION SYSTEM IN VILLAGE DHARAM KHERI
2026_HRY_529978_1
2026CE666DF6 F1C7 49F6 A2F4 FD269BB06722567PUH
Open Tender
Civil Works
Works
450 days
DHARAM KHERI
5 documents required · 5 mandatory
₹20,000
₹12.2 L
Yes
15 Sept 2026
18 Jun 2026
1 Jul 2026
18 Jun 2026
1 Jul 2026
18 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.1 | Provision for electric fitting inside the pump chamber complete in all respect | 1 | each | - | - |
| 2.1 | Supplying, erection, testing and commissioning of horizontal motor pumping set for clear water having head 60.00 m as per the indicated requirements
of discharge in LPM and power capacity in BHP as per IS marked. (2300 LPM 60.00 BHP 70.00 Mtr Head) | 2 | each | - | - |
| 3.1 | WATER TREATMENT PLANT (WTP) Design, construction, testing and commissioning of 0.50 MLD capacity Water treatment plant including inlet channel, Alum dozing, Flash mixing, Clarifloculator, filter box, over head Reservoir for back wash, waste water tank including all civil work, pumping machineries and electric cabling, control panels, entire piping network of suitable size laying the DI pipe from raw water pump to inlet box of WTP, WTP to CWT and Suction Well for CW including DI specials, suitable size Sluice valves, Hodies, manhole covers, air scour equipment, chemical house including chlorination equipment and arrangement of flow measurement and sand bed complete in all respects as per NIT (Sluice valves of make IVCAWAG | 1 | each | - | - |
| 4.1 | `RAW WATER PUMP: Supplying, erection, testing and commissioning of Horizontal motor pumping set for Raw water having head as per the indicated requirements of discharge in LPM and power capacity in BHP as per IS marked ` 1300 LPM x 12.50 M Head | 2 | each | - | - |
| 5.1 | Supply, erection, testing and commissioning of wall mounted electrical L.T. Panel board, fabricated from 16 SWG CRCA sheet duly stouted with suitable angle iron frame work and completely powder coated of approximate size 1200 x 900 mm and 400 mm deep having following items. a) MCCB 100 amp. 1 No. (LandT Siemens, ABB) b) CT 100/3 = 3Nos. (AE/ KAPPA/ LandT) c) Digital Multi function meter = 2 No. d) SPP = 1 No. of approved make e) Motor starter, Star delta = 2500 LPM x65.00 BHP x 70.00 mtr Head (LandT Siemens, ABB) = 2 Nos. f) Capacitor KVAR as per site requirement = 1 No. g) Indicating Lamp = One Set h) Change over switch of suitable Amp = 1 No. (Each) | 2 | each | - | - |
| 6.1 | Less Credit of Old Bricks ( - ) | 1,05,804 | each | - | - |
| 7.1 | Credit of bricks bats 40 % | 89.05 | cum | - | - |
| 8.1 | Operation and Maintenance for complete scope of work of 0.50 MLD WTP mentioned in the DNIT in the village Disinfection material supplied by the PHED as per schedule-IV for a period of 5 years after 12 months during defect liability period and 3 months trial run period. (will be charged to the A/mtc estimate). complete in all respects as per approved NIT.
1) Operation and maintenance during defect liability period after 3 month trial run period ( operation only) | 1 | Job | - | - |
| 9.1 | (ii) Operation and Maintenance during 1st year after defect Liability period. | 1 | Job | - | - |
| 10.1 | (iii)Operation and Maintenance During 2nd year. | 1 | Job | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.85 MB
BOQ_609016.xls
BOQ • 0.26 MB
6G0BE7Z163870.pdf
Additional Documents • 0.77 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .