| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAdmitted-Finance | ₹1.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.8 Cr+₹11.1 L (6.73%)Admitted-Finance | ₹1.8 Cr+₹11.1 L (6.73%) | L2 | Admitted-Finance |
| 3 | L3₹1.9 Cr+₹21.1 L (12.8%)Admitted-Finance MIG 354 4TH CROSS STREET MOGAPPAIR ERI SCHEME CHENNAI 37 | CHENNAI | ₹1.9 Cr+₹21.1 L (12.8%) | L3 | Admitted-Finance |
| 4 | L4₹1.9 Cr+₹24.0 L (14.5%)Admitted-Finance | ₹1.9 Cr+₹24.0 L (14.5%) | L4 | Admitted-Finance |
| 5 | L5₹2.3 Cr+₹68.7 L (41.6%)Admitted-Finance NO 2 98 TRICHY MAIN ROAD PIDAGAM POST VILLPURAM TALUK 605401 | PIDAGAM | VILLUPURAM | TAMIL NADU | 605401 | ₹2.3 Cr+₹68.7 L (41.6%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Dillibabu L2 | M.ALAGUPANDIAN L4 | H.Venkateswaran L1 | ULTRAPOWER BUILDERS L3 | K DHINAKARAN L5 | Thulasingam L7 | C.GOVINDAN L6 | MSS CONTRACTORS L8 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Conducting check survey and Location pit marking for carrying out survey assesment tools and plants cutting of small trees whereever necessary as directed by Engineer | 43 | Loc | 500 ₹21,500 | 100 ₹4,300 Lowest | 1,500 ₹64,500 | 3,000 ₹1,29,000 | 1,500 ₹64,500 | 1,001 ₹43,043 | 1,500 ₹64,500 | 1,000 ₹43,000 |
| 2.00 | Earth work excavation including cost of all materials lead lift etc. complete. and as directed by the Engineer at site in all kind of soils.In hard stiff clay, stiff black cotton soil, hard red earth, shales, murram, gravel stoney earth and earth mixed with small size boulders.SS 20 B In Hard stiff clay, stiff black cotton, hard red earth,, shales, murram, stoney earth and earth mixed with small size boulders SS 20 B | 1,979.5 | M3 | 150 ₹2,96,925 | 150 ₹2,96,925 | 80 ₹1,58,360 Lowest | 150 ₹2,96,925 | 250 ₹4,94,875 | 151 ₹2,98,904.5 | 200 ₹3,95,900 | 150 ₹2,96,925 |
| 3.00 | Earth work excavation including cost of all materials lead lift etc. complete. and as directed by the Engineer at site in all kind of soils.In hard stiff clay, stiff black cotton soil, hard red earth, shales, murram, gravel stoney earth and earth mixed with small size boulders.SS 20 B Soft disintegrated rock not requirng blasting | 247.5 | M3 | 200 ₹49,500 | 150 ₹37,125 | 100 ₹24,750 | 1 ₹247.5 Lowest | 250 ₹61,875 | 201 ₹49,747.5 | 300 ₹74,250 | 200 ₹49,500 |
| 4.00 | Earth work excavation including cost of all materials lead lift etc. complete. and as directed by the Engineer at site in all kind of soils.In hard stiff clay, stiff black cotton soil, hard red earth, shales, murram, gravel stoney earth and earth mixed with small size boulders.SS 20 B In Medium rock and dense medium rock not requiring blasting | 124 | M3 | 200 ₹24,800 | 200 ₹24,800 | 200 ₹24,800 | 1 ₹124 Lowest | 250 ₹31,000 | 301 ₹37,324 | 300 ₹37,200 | 250 ₹31,000 |
| 5.00 | Earth work excavation including cost of all materials lead lift etc. complete. and as directed by the Engineer at site in all kind of soils.In hard stiff clay, stiff black cotton soil, hard red earth, shales, murram, gravel stoney earth and earth mixed with small size boulders.SS 20 B Removal of hard rock by wedging and chiselling and trimming to proper shape | 124 | M3 | 1,000 ₹1,24,000 | 200 ₹24,800 | 1,000 ₹1,24,000 | 1 ₹124 Lowest | 250 ₹31,000 | 1,001 ₹1,24,124 | 1 ₹124 Lowest | 250 ₹31,000 |
| 6.00 | Earth work excavation including cost of all materials lead lift etc. complete. and as directed by the Engineer at site in all kind of soils.In hard stiff clay, stiff black cotton soil, hard red earth, shales, murram, gravel stoney earth and earth mixed with small size boulders.SS 20 B In Hard stiff clay, stiff black cotton, hard red earth,, shales, murram, stoney earth and earth mixed with small size boulders SS 20 B in RF area | 222 | M3 | 200 ₹44,400 | 300 ₹66,600 | 100 ₹22,200 Lowest | 150 ₹33,300 | 250 ₹55,500 | 151 ₹33,522 | 200 ₹44,400 | 250 ₹55,500 |
| 7.00 | Earth work excavation including cost of all materials lead lift etc. complete. and as directed by the Engineer at site in all kind of soils.In hard stiff clay, stiff black cotton soil, hard red earth, shales, murram, gravel stoney earth and earth mixed with small size boulders.SS 20 B Soft disintegrated rock not requirng blasting in RF area | 89 | M3 | 200 ₹17,800 | 300 ₹26,700 | 150 ₹13,350 | 1 ₹89 Lowest | 250 ₹22,250 | 301 ₹26,789 | 300 ₹26,700 | 250 ₹22,250 |
| 8.00 | Earth work excavation including cost of all materials lead lift etc. complete. and as directed by the Engineer at site in all kind of soils.In hard stiff clay, stiff black cotton soil, hard red earth, shales, murram, gravel stoney earth and earth mixed with small size boulders.SS 20 B In Medium rock and dense medium rock not requiring blasting in RF area | 89 | M3 | 200 ₹17,800 | 400 ₹35,600 | 250 ₹22,250 | 1 ₹89 Lowest | 250 ₹22,250 | 501 ₹44,589 | 300 ₹26,700 | 250 ₹22,250 |
| 9.00 | Earth work excavation including cost of all materials lead lift etc. complete. and as directed by the Engineer at site in all kind of soils.In hard stiff clay, stiff black cotton soil, hard red earth, shales, murram, gravel stoney earth and earth mixed with small size boulders.SS 20 B Removal of hard rock by wedging and chiselling and trimming to proper shape in RF area | 44.5 | M3 | 1,000 ₹44,500 | 400 ₹17,800 | 1,500 ₹66,750 | 1 ₹44.5 Lowest | 250 ₹11,125 | 1,001 ₹44,544.5 | 1,000 ₹44,500 | 500 ₹22,250 |
| 10.00 | Sinking well rings in loose soils,black cotton soil,sandy loam and ordinary soil including the cost of materials, labour etc., complete 0-2 m First depth | 220 | M3 | 1 ₹220 Lowest | 10 ₹2,200 | 30 ₹6,600 | 1 ₹220 Lowest | 150 ₹33,000 | 201 ₹44,220 | 400 ₹88,000 | 3,000 ₹6,60,000 |
Tender Value
Refer Docs
EMD Value
₹2.9 L
Closing Date
16 Sept 2020, 2:00 pmClosed
CE/TP-I/CHN
A10,Guindy Ind Estate ,Guindy,Chennai
Stub setting Concreting Erection Stringing of ACSR Zebra Conductor and OPGW cable for Strengthening of the existing 230KV Neyveli TS I - Thiruvannamalai feeder LOC 189 to 232
2020_EB_176138_1
TP1-023/20-21
Open Tender
Civil Works
Works
120 days
Guindy
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹2.9 L
Yes
24 Nov 2020
19 Aug 2020
17 Sept 2020
19 Aug 2020
16 Sept 2020
19 Aug 2020
Amount
Conducting check survey and Location pit marking for carrying out survey assesment tools and plants cutting of small trees whereever necessary as directed by Engineer
Earth work excavation including cost of all materials lead lift etc. complete. and as directed by the Engineer at site in all kind of soils.In hard stiff clay, stiff black cotton soil, hard red earth, shales, murram, gravel stoney earth and earth mixed with small size boulders.SS 20 B In Hard stiff clay, stiff black cotton, hard red earth,, shales, murram, stoney earth and earth mixed with small size boulders SS 20 B
Earth work excavation including cost of all materials lead lift etc. complete. and as directed by the Engineer at site in all kind of soils.In hard stiff clay, stiff black cotton soil, hard red earth, shales, murram, gravel stoney earth and earth mixed with small size boulders.SS 20 B Soft disintegrated rock not requirng blasting
Earth work excavation including cost of all materials lead lift etc. complete. and as directed by the Engineer at site in all kind of soils.In hard stiff clay, stiff black cotton soil, hard red earth, shales, murram, gravel stoney earth and earth mixed with small size boulders.SS 20 B In Medium rock and dense medium rock not requiring blasting
Earth work excavation including cost of all materials lead lift etc. complete. and as directed by the Engineer at site in all kind of soils.In hard stiff clay, stiff black cotton soil, hard red earth, shales, murram, gravel stoney earth and earth mixed with small size boulders.SS 20 B Removal of hard rock by wedging and chiselling and trimming to proper shape
Earth work excavation including cost of all materials lead lift etc. complete. and as directed by the Engineer at site in all kind of soils.In hard stiff clay, stiff black cotton soil, hard red earth, shales, murram, gravel stoney earth and earth mixed with small size boulders.SS 20 B In Hard stiff clay, stiff black cotton, hard red earth,, shales, murram, stoney earth and earth mixed with small size boulders SS 20 B in RF area
Earth work excavation including cost of all materials lead lift etc. complete. and as directed by the Engineer at site in all kind of soils.In hard stiff clay, stiff black cotton soil, hard red earth, shales, murram, gravel stoney earth and earth mixed with small size boulders.SS 20 B Soft disintegrated rock not requirng blasting in RF area
Earth work excavation including cost of all materials lead lift etc. complete. and as directed by the Engineer at site in all kind of soils.In hard stiff clay, stiff black cotton soil, hard red earth, shales, murram, gravel stoney earth and earth mixed with small size boulders.SS 20 B In Medium rock and dense medium rock not requiring blasting in RF area
Earth work excavation including cost of all materials lead lift etc. complete. and as directed by the Engineer at site in all kind of soils.In hard stiff clay, stiff black cotton soil, hard red earth, shales, murram, gravel stoney earth and earth mixed with small size boulders.SS 20 B Removal of hard rock by wedging and chiselling and trimming to proper shape in RF area
Sinking well rings in loose soils,black cotton soil,sandy loam and ordinary soil including the cost of materials, labour etc., complete 0-2 m First depth
Sinking well rings in loose soils,black cotton soil,sandy loam and ordinary soil including the cost of materials, labour etc., complete 2-4 m Second depth
Providing Grout holes 40 mm dia, 900mm depth in hard rock wherever necessary including cost of all machineries, dewatering, labour, lead and lift, etc., complete.
Cement grouting for anchor rods, including all cost of materials, dewatering, labour charges using special tools and plants such as air compressor/pump etc., complete (excluding cost of rod )
Supplying and placing of Pre cast RCC well rings having inner dia 1.80 m, thickness 50mm and 0.30m depth including cost of 8mm RTS rods -3 nos longitudinally and 20cm c/c vertically including cost of all materials, dewatering, lead and lift, etc., complete.
Supplying and placing of Pre cast RCC well rings having inner dia 2.40 m, thickness 75mm and 0.30m depth including cost of 8mm RTS rods -3 nos longitudinally and 20cm c/c vertically including cost of all materials, dewatering , lead and lift, etc., complete.
Transporting the template and assembling including shifting stub and cleat, shifting template from location to location and reassambling including cost of lead, lift, etc., complete. GR Type
Transporting the template and assembling including shifting stub and cleat, shifting template from location to location and reassambling including cost of lead, lift, etc., complete. KSR Type
Transporting the template and assembling including shifting stub and cleat, shifting template from location to location and reassambling including cost of lead, lift, etc., complete. LSR Type
Transporting the template and assembling including shifting stub and cleat, shifting template from location to location and reassambling including cost of lead, lift, etc., complete. D Type
Transporting the template and assembling including shifting stub and cleat, shifting template from location to location and reassambling including cost of lead, lift, etc., complete. GR Type in RF area
Providing Shoring & Shuttering including cost of form work, all materials, labour charges, lead, lift etc., complete
Charges for Boating arrangement for Rough Sagging, Tensioning, Clipping including necessary jointing of 3nos of ACSR Panther conductor & 1no of GI Earthwire
Sand filling including cost of sand ,filling charges , labour for watering and consolidation leads and lift etc.complete.
Providing PCC 1:3:6 using 20 mm HBG metal for padding without form work including cost of all materials, labour, curing, mixture machine, lead, lift, etc., complete as per the direction of the Engineer at site. Without form box.
Providing PCC 1:3:6 using 20 mm HBG metal for padding without form work including cost of all materials, labour, curing, mixture machine, lead, lift, etc., complete as per the direction of the Engineer at site. Without form box. In RF Area
Providing PCC 1:2:4 using 20 mm HBG metal including cost of all materials, labour, curing,frustrum form box, mixture machine, lead, lift, etc., complete. Without form box.
Providing PCC 1:2:4 using 20 mm HBG metal including cost of all materials, labour, curing,frustrum form box, mixture machine, lead, lift, etc., complete. Without form box. In RF area
Providing PCC 1:2:4 using 20 mm HBG metal including cost of all materials, labour, curing,frustrum form box, mixture machine, lead, lift, etc., complete. With form box
Providing RCC 1:1.5:3 using 20 mm HBG metal including cost of all materials, labour, curing, mixture machine, lead, lift, etc., complete without form work for foundation raft
Providing RCC 1:1.5:3 using 20 mm HBG metal including cost of all materials, labour, curing, mixture machine, lead, lift, etc., complete with form work for foundation footing, Chiminey & Protection
Providing steel reinforcement and placing in position including cost of reinforcement, binding wire, including cost of all materials, labours, lead and lift, etc., complete.
Back filling of pits by the excavated earth including cost of all materials, labour charge, lead, lift, etc., complete.
Spreading fo surplus earth around the area including cost of allmaterials, labour charge, lead, lift, etc., complete.
Clearing juliflora jungle with uprooting including all cost of labour ,lead, lift etc., complete.
Labour Charges for cutting and removing small Palmira / Coconut stumps and other trees in all respects
Labour Charges for cutting and removing large Palmira / Coconut stumps and other trees in all respects
Arranging road block for stringing of power conductor and earth wire across major road/ Railway crossing including cost of sign boards and all incidental charges etc., complete.
Supply and fixing Anti climbing device by providng and tying Barbed wire alround tower with necessary angles etc, lead, lift etc complete as instructed by department engineer at site.
Providing special type earthing in Railway crossing tower with 2 Nos 50mm dia GI "C" class pipe as per standard specification, approved drawing and as directed by the Engineer incharge including lowering the earth wire from earth peak to the ground and connecting to the earth pipe, connecting the tower legs and earth pipes by 7/3.55 mm GI earth wire with suitable clamps and providing 2 Nos 150mm dia. bore for a depth of 3.6m for each tower location and placing of GI pipes 50mm dia C class 3m long into the bore, filling with Charcoal and salt in the annular space, providing 2 Nos RCC rings 60cm dia, 50mm tk for each earth pipe and anti climbing arrangements using GI barbed wire and evice including cost of all materials ,lead,lift etc., complete.
Providing pipe type earthing including cost of 40 mm GI earth pipe B class of length 3 m,earth strip, cutting of earth work to the required length and connecting to the earth pipe and stub including cost of all materials ,lead,lift etc., complete.
Bailing out of water by pumpset including cost of diesel pumpset 0.5HP cost of all materials labour lead and lift etc complete
Providing temporary bund around tower location by supply and filling up the empty polythene bags with sand stitchig them conveying the same to site and stacking, laying in position around tower location and disposing off from site after successfull completion of work including polythene bags, jute, thread, and all materials and labour charges for filling sand, alying and filling and bailing out of water etc., complete and as directed by the Engineer at site
PCC 1:2:4 using 12 to 20mm HBG metal for muffing and coping including cost of all materials labour, form work all lead lift etc., complete.
PCC 1:2:4 using 12 to 20mm HBG metal for muffing and coping including cost of all materials labour, form work all lead lift etc., complete. In RF Area
Providing plastering C:M 1 : 3 , 12 mm thick including cost of all materials labour lead, lift, etc., complete in all respect
Providing plastering C:M 1 : 3 , 12 mm thick including cost of all materials labour lead, lift, etc., complete in all respect. In RF area
Transporting & erection of tower parts including sorting out of tower parts at store and site, tightening, punching of bolts and nuts transport charges to each and every location, final checking, cost of T&Ps labour, lead, lift etc, complete., The defects pointed out during final checking for handing over and commissioning the line must be attended by the contractor without any extra cost to the board (Under LC Condition)
Transporting & erection of tower parts including sorting out of tower parts at store and site, tightening, punching of bolts and nuts transport charges to each and every location, final checking, cost of T&Ps labour, lead, lift etc, complete., The defects pointed out during final checking for handing over and commissioning the line must be attended by the contractor without any extra cost to the board (Under LC Condition) in RF area
Welding of exposed bolts and nuts 1 cm each at two places opposite to each other after tightening and punching of tower parts including cost of welding rods all T&P upto bottom cross arm including cost of all materials, labour lead lift etc., complete
Welding of exposed bolts and nuts 1 cm each at two places opposite to each other after tightening and punching of tower parts including cost of welding rods all T&P upto bottom cross arm including cost of all materials, labour lead lift etc., complete in RF area
Labour charges for paying out, Rough sagging, Tensioning of 6 Nos. Zebra conductor (2 circutes) with fittings including sorting out of conductor according to drum schedule and loading and unloading, at site providing trussels and rough sagging tensiioning, clipping cost of T&P lead and lift etc., complete. For Single Span
Labour charges for paying out, Rough sagging, Tensioning of 6 Nos. Zebra conductor (2 circutes) with fittings including sorting out of conductor according to drum schedule and loading and unloading, at site providing trussels and rough sagging tensiioning, clipping cost of T&P lead and lift etc., complete. For Continuous Span in RF area
Labour charges for paying out, Rough sagging, Tensioning of 3 Nos. Zebra conductor (2 circutes) with fittings including sorting out of conductor according to drum schedule and loading and unloading, at site providing trussels and rough sagging tensiioning, clipping cost of T&P lead and lift etc., complete. For Continuous Span
Labour charges for paying out, Rough sagging, Tensioning of 3 Nos. Zebra conductor (2 circutes) with fittings including sorting out of conductor according to drum schedule and loading and unloading, at site providing trussels and rough sagging tensiioning, clipping cost of T&P lead and lift etc., complete. For Single Span
Transporting & Hoisting of 14 Nos ordinary 120KN disc insulators with tension fittings including T&P all labour, lead, lifts etc., complete
Transporting & Hoisting of 2 x 14 Nos ordinary 120KN disc insulators with double tension fittings including T&P all labour, lead, lifts etc., complete
Transporting & Hoisting of 13 Nos ordinary 90KN disc insulators with tension fittings including T&P all labour, lead, lifts etc., complete
Transporting & Hoisting of 13 Nos ordinary 90KN disc insulators with tension fittings including T&P all labour, lead, lifts etc., complete. In RF Area
Paying out, jointing, rough sagging, tensioning of 1 No. OPGW including hoisting of fittings, providing jumpering in tension points and transport of all materials from stores to site, all labour, leads and lifts etc., complete. For Continuous Span
Paying out, jointing, rough sagging, tensioning of 1 No. OPGW including hoisting of fittings, providing jumpering in tension points and transport of all materials from stores to site, all labour, leads and lifts etc., complete. For Single Span
Paying out, jointing, rough sagging, tensioning of 1 No. OPGW including hoisting of fittings, providing jumpering in tension points and transport of all materials from stores to site, all labour, leads and lifts etc., complete. For Continuous Span in RF area
Providing temporary stay (3 Nos) during rough sagging and tensioning including necessary excavation for burying RSJ cut bits/ concrete block with pipe turn buckle/ concreting the anchor in slushy area fixing stay wire and turn buckle, refilling and removal of stays after tensioning including cost of all materials, labour, leads, lifts, etc., complete.
Arranging and availing shutdown on HT/LT, dismantling and restringing of HT/LT lines to the original position after stringing operation including all labour charges , T&Ps, etc., complete.
Providing bamboo/Casuarina trustles during conductor and earth wire stringing work wherever necessary and as directed by the Board Engineer for telecom lines roads, railway rorssingetc., including cost of all materials transport, T&Ps labour leads and lifts etc., completeand dismantling after completion of stringing works in the crossing as above. Special type Trustles for Highway Crossings
Providing bamboo/Casuarina trustles during conductor and earth wire stringing work wherever necessary and as directed by the Board Engineer for telecom lines roads, railway rorssingetc., including cost of all materials transport, T&Ps labour leads and lifts etc., completeand dismantling after completion of stringing works in the crossing as above. Bamboo/Casuarina Trustles
Supply and operating 15KVA Open Generator with 5 Flood lamps 500w foucing tension towers in the NH crossings and special type trussles scaffolded for NH crossing during LC work after sunset and before sunrise including lead, lift, transporting of D.G.set, diesel and required cable arrangements etc., complete as directed by the department Engineer at site.
Fixing of the following item including cost of all necessary tools, labour, lead and lift etc., complete. Number Plate 200mm x 200 mm
Phase Board containing 3 nos phase plates Fixing of the following item including cost of all necessary tools, labour, lead and lift etc., complete. with colour sequence
Fixing of the following item including cost of all necessary tools, labour, lead and lift etc., complete. Danger Board 500mm x 500mm
Fixing of the following item including cost of all necessary tools, labour, lead and lift etc., complete. Name Board 900mm x 450mm
Cleaning the tower legs and Painting tower leg using best quality anti corrosive paint-black color-1m above coping concrete including bracings including cost of paint labour, charges, lead and lift etc. complete.
Cleaning the tower legs and Painting tower leg using best quality anti corrosive paint-black color-1m above coping concrete including bracings including cost of paint labour, charges, lead and lift etc. complete. In RF area
Dismantelling the worn out old chimney concrete to the depth of 1m below GL, and dispossing of from the site including cost of all materials lead, lift etc complete
Labour charges for dismantling the existing 230 KV lines consisting of various types of towers including cost of loading and unloading with necessary tools and plants with safety norms . Dismantling Tower
Labour charges for lowering of ACSR Kundah including cost of all materials, labour, lead, lift, complete, etc., and as directed by the Dept. Engineer at site.
Labour charges for lowering of GI Earth wire including cost of all materials, labour, lead, lift, complete, etc., and as directed by the Dept. Engineer at site.
Labour charges for lowering of 120KN insulators including cost of all materials, labour, lead, lift, complete, etc., and as directed by the Dept. Engineer at site.
Labour charges for lowering of 90KN insulators including cost of all materials, labour, lead, lift, complete, etc., and as directed by the Dept. Engineer at site.
Less credit Taking the towers with bolt and nuts as is where is condition including cost of transport, lead, lift, etc., complete as directed by the department engineer at site
GST for bidders within TamilNadu
GST for bidders outside TamilNadu (IGST)
Dillibabu
ULTRAPOWER BUILDERS
M.ALAGUPANDIAN
K DHINAKARAN
C.GOVINDAN
Thulasingam
MSS CONTRACTORS
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .