| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC | ₹1.2 Cr | L1 | Accepted-AOC L1 bidder |
| 2 | L2₹1.2 Cr+₹1.7 L (1.41%)Rejected-Finance | ₹1.2 Cr+₹1.7 L (1.41%) | L2 | Rejected-Finance Highest rate |
Tender Value
₹1.2 Cr
EMD Value
₹1.2 L
Closing Date
8 May 2023, 11:00 amClosed
Project Director,DRDA, Virudhunagar
DRDA, Collectorate, Virudhunagar
Strengthening and 5 Years Routine Maintenance of M.Duraisamypuram to Kopanayakkanpatti link road in Package no. MGSMT-42-2022-23 at Vembakottai Block of Virudhunagar District under MGSMT-2022-23.
2023_RDTN_300713_45
DIPR/2018/Tender/2023
Open Tender
Civil Works - Roads
Works
180 days
Vembakottai Block
Two Cover System. Refer tender document
5 documents required · 5 mandatory
₹0
₹1.2 L
DRDA, Collectorate, Virudhunagar
8 Jun 2023
22 Apr 2023
8 May 2023
22 Apr 2023
8 May 2023
30 Apr 2023
30 Apr 2023
Amount
Part-1:- M.Duraisamypuram to Kopanayakkanpatti link road
Part-A:- Strengthening work
Labour Charges for Picking 5cm to 10cm old metalled Surface and Sectioning etc,… comlete
Providing laying and compacting red gravel in accordance with requirements of the specification materials shall be in one or more layers as necessary including watering, consolidating by the power roller rolling and all labour charges for soiling including hire charges for consolidation etc. complete. Km 0/0- 1/0
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
BITUMINOUS CONCRETE USING cmp (Grade-II) Providing and laying Bituminious concrete using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 include 8% plastic waste heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Providing and laying of hot applied Thermoplastic compound 2.5 mm thick including reflectoising glass beads @ 250 gms per Sqm area , Thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC :35 . The finished surface to be level , uniform and free streaks and holes etc complete as per MORT & H specification No.803 - Road Marking - Edge line
CD Works-1:- Construction of 1.5m culvert @ 380m
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Collection and supply of sand and filling in to the basement including cost and as per standard speecifications as per standard speecifications
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle-BGL
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle-AGL
Cement concrete 1:3:6 mix using 40 mm ISS HBG metal including all cost and conveyance of materials, labour charges such as compaction, curing, etc., complete as per standard specification.
Cement concrete 1:2:4 mix using 20 mm ISS HBG metal including all cost and conveyance of materials, labour charges such as compaction, curing, etc., complete as per standard specification.
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete.
Supply and Fabrication of High Yield Strength Deformed Bar with Grade Designation Fe-500, conforming to IS:1786-1985, steel required for all RCC items of works involved in the schedule cost of steel at site fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length wherever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc, complete,Fe-500 grade.
CD Works-2:- Construction of 1.5m culvert @ 1300m
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Collection and supply of sand and filling in to the basement including cost and as per standard speecifications as per standard speecifications
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle-BGL
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle-AGL
Cement concrete 1:3:6 mix using 40 mm ISS HBG metal including all cost and conveyance of materials, labour charges such as compaction, curing, etc., complete as per standard specification.
Cement concrete 1:2:4 mix using 20 mm ISS HBG metal including all cost and conveyance of materials, labour charges such as compaction, curing, etc., complete as per standard specification.
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete.
Supply and Fabrication of High Yield Strength Deformed Bar with Grade Designation Fe-500, conforming to IS:1786-1985, steel required for all RCC items of works involved in the schedule cost of steel at site fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length wherever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc, complete,Fe-500 grade.
Providing Hectametre stone of size
Providing kilometer stone of size
Proviosn for Maintenance and Name board
Providing Sign Board
Providing Road Marker Road / Stud with lens Reflector
Providing metal beam crash barrier Type-A double guard
Part-B:- Maintenance work
Maintenance Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost
For the First Year from the date of completion of work
For the Second Year from the date of cpmpletion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to the above Government Contract Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
G.A. MUTHULAKSHMI
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .