| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.5 LAccepted-AOC | ₹17.5 L | L1 | Accepted-AOC AWARD OF CONTRACT IS GIVEN TO THE CONTRACTOR |
| 2 | L2₹17.6 LRejected-Finance | ₹17.6 L | L2 | Rejected-Finance Rates of Bidder are below estimated rates and also higher among two. |
| Sl No | Description | Qty | Unit | M/S SUDHIR CHANDRA CONSTRUCTION AND SUPPLIER L1 | AKHILESH KUMAR GANGWAR L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work in foundation in wet soil including lift up to 1.50 m and lead up to 30 m and including back filling, watering and ramming of excavated earth into the trenches or into the space between the structure and the side of foundation trenches or into | 164.09 | cum | 80 ₹13,126.80 | 132 ₹21,659.22 |
| 2.00 | Centering and shuttering (steel shuttering) for C.C. work up to 3.0 m height including cost of all labour, material and T&P etc. required for proper completion of work. | 32.31 | sqm | 500 ₹16,153 | 500 ₹16,153 |
| 3.00 | Providing and Laying M-10 (C.C.1:3:6) cement concrete including cost of all materials, labour T & P, all lifts and leads etc. complete. | 34.35 | cum | 5,672.2 ₹1.9 L | 5,672.2 ₹1.9 L |
| 4.00 | Laying R.C.C. 1:1.5:3 Mix (M-20) cement, coarse sand & 20 mm down graded stone grit including cost of all material, labour and T&P etc. complete but excludiing cost of shuttering. | 29.95 | cum | 6,913.2 ₹2.1 L | 6,913.2 ₹2.1 L |
| 5.00 | Brick work in 1:4 cement mortar in Abutment, Wing wall & Parapet etc.up to 3 m lift and 60 M lead including cost of all material, labour and T&P required for proper completion of work. | 84.48 | cum | 5,250.2 ₹4.4 L | 5,250.2 ₹4.4 L |
| 6.00 | Cement pointing in 1:2 cement mortar (struck deep) on brick masonary including cost of all material, labour and T&P etc. required for proper completion of work. | 89.16 | sqm | 116.2 ₹10,359.93 | 116.2 ₹10,359.93 |
| 7.00 | Centering and shuttering (steel shuttering) for R.C.C. work up to 3.0 m height including cost of all labour, material and T&P etc. required for proper completion of work. | 54.93 | sqm | 822 ₹45,152.46 | 822 ₹45,152.46 |
| 8.00 | Reinforcement including cutting, bending & binding in position including cost of bindingwire and also including all cost of labour, material and T&P etc. required for proper completion of work. | 4.35 | M.T | 65,140.6 ₹2.8 L | 65,140.6 ₹2.8 L |
| 9.00 | Laying R.C.C. 1:1:2 Mix (M-25) with Cement, coarse sand & 20 mm down graded stone grit in wearing coat including cost of all material, labour and T&P etc. complete but excludiing cost of Centering, shuttering & Reinforcement. | 5.05 | cum | 7,742.4 ₹39,075.89 | 7,742.4 ₹39,075.89 |
| 10.00 | Providing and fixing Drainage Spouts (100 mm dia) complete including cost of all material, labour and T&P etc. required for proper completion of work. | 2.3 | R.M | 154 ₹354.20 | 154 ₹354.20 |
Tender Value
₹18.9 L
EMD Value
₹1.9 L
Closing Date
6 Apr 2026, 12:00 pmClosed
EXECUTIVE ENGINEER
O/O EXECUTIVE ENGINEER, MADHYA GANGA CANAL CONSTRUCTIO DIVISION-9, SABHAL
CONSTRUCTION OF V.R.B AT KM 4.600 OF KAILY DY.
2026_UPIDC_1128906_1
01/EE/2025-26
Open Tender
Civil Works - Canal
90 days
KAILY
PLEASE REFER TENDER DOCUMENT
3 documents required · 3 mandatory
₹766
₹1.9 L
SAMBHAL
19 May 2026
23 Mar 2026
6 Apr 2026
23 Mar 2026
6 Apr 2026
23 Mar 2026
24 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in foundation in wet soil including lift up to 1.50 m and lead up to 30 m and including back filling, watering and ramming of excavated earth into the trenches or into the space between the structure and the side of foundation trenches or into | |||||
| 2 | Centering and shuttering (steel shuttering) for C.C. work up to 3.0 m height including cost of all labour, material and T&P etc. required for proper completion of work. | 1 | sqm | - | - |
| 3 | Providing and Laying M-10 (C.C.1:3:6) cement concrete including cost of all materials, labour T & P, all lifts and leads etc. complete. | 1 | cum | - | - |
| 4Laying R.C.C. 1:1.5:3 Mix (M-20) cement, coarse sand & 20 mm down graded stone grit including cost of all material, labour and T&P etc. complete but excludiing cost of shuttering. | |||||
| 5 | Brick work in 1:4 cement mortar in Abutment, Wing wall & Parapet etc.up to 3 m lift and 60 M lead including cost of all material, labour and T&P required for proper completion of work. | 1 | cum | - | - |
| 6 | Cement pointing in 1:2 cement mortar (struck deep) on brick masonary including cost of all material, labour and T&P etc. required for proper completion of work. | 0.4 | sqm | - | - |
| 7 | Centering and shuttering (steel shuttering) for R.C.C. work up to 3.0 m height including cost of all labour, material and T&P etc. required for proper completion of work. | 1 | sqm | - | - |
| 8 | Reinforcement including cutting, bending & binding in position including cost of bindingwire and also including all cost of labour, material and T&P etc. required for proper completion of work. | 0.68 | M.T | - | - |
| 9 | Laying R.C.C. 1:1:2 Mix (M-25) with Cement, coarse sand & 20 mm down graded stone grit in wearing coat including cost of all material, labour and T&P etc. complete but excludiing cost of Centering, shuttering & Reinforcement. | 1 | cum | - | - |
| 10 | Providing and fixing Drainage Spouts (100 mm dia) complete including cost of all material, labour and T&P etc. required for proper completion of work. | 1 | R.M | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.69 MB
Tendernotice_2.pdf
PDF • 3.86 MB
BOQ_2105647.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid