Tender Value
Refer Docs
EMD Value
₹41,000
Closing Date
13 Jun 2024, 4:00 pmClosed
Executive Engineer ED-II JPDCL
Executive Engineer ED-II JPDCL
Supply, Installation, Testing, Commissioning of 1x250KVA, 11/0.415KV distribution substation along with HT Line for newly constructed building of Drug De-Addiction and Rehabilitation Centre (DDRC) at Thangar Channi Jammu
2024_PDD_249394_1
Enit 18 of 2024 Dated 06-06-2024
Open Tender
Electrical Works
Turn-key
30 days
ED-II JPDCL
As per Enit and SBD
8 documents required · 8 mandatory
₹1,000
Executive Engineer ED-II JPDCL
₹41,000
19 Jun 2024
6 Jun 2024
14 Jun 2024
6 Jun 2024
13 Jun 2024
6 Jun 2024
Amount
Creation of 11/0.433kV, 250KVA , 3-phase Distribution Substation
Supply, Installation & commissioning of 11/0.433 KV, 250 KVA 3-Phase Distribution Transformer with Bi-metallic terminal Connectors, Energy Level: 2, "BIS Marked" (Copper Wound) alongwith LV Cable Box having detachable Alumnium Gland plate including Transportation (As per latest IS)
Supply, Transportation, Erection of 9 Mtr Long ST Pole (ST-410 SP33) including excavation of pit and back filling of soil & consolidating by ramming, watering etc. Including painting with two coats of Red Oxide and Al. Paint for smooth surface.
Supply & Fixing of Gapless Surge Arrestor,9 kV ,10 kA ,LA with polymer housing, Stn. Type
Supply, Installation, Testing & Commissioning of 11kV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, Vertical Type
Supply, Installation, Testing & Commissioning of 11 kV Horn Gap Fuse Set 3 Phase 200A
Providing & Fixing of Single Phase PVC Cable 240 mm² ,1.1K V Grade, PVC Insulated Stranded Un-Armoured FRLS type alongwith Al. Thimbles for 240 mm² Cable termination with four colored PVC Tapings to distinguish the LT Phases and the Neutral. (2 Ckt)
11kV Polymeric composite Disc Insulator 12kV with Fitting, min failing load 45kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm
Supply, Transportation, Fabrication & Fixing of GI Channel Iron, GI Cross arms, GI Angle Iron Braces, GI Clamps etc duly fabricated including all necessary GI Nut & Bolts & Washers etc.
Providing of Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover.
Providing & Fixing of 11kV Polymeric composite Pin Insulator 12kV, 5kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm
Providing & Fixing of Pole mounted LT Distribution Box for 250 KVA DTR with 2 No. Triple Pole MCCB of 300 Amp with adjustable overload release of (80-100%) for incomer & & switch fuse unit for Out Going 2No Ckts. including Busbar arrangements for Phases & Neutral of EC Grade Aluminium,PVC Insulated Sleeved Busbar of required load handling capacity with colour code for Phases and Neutral differentiation, including Aluminium thimbles of required sizes for proper termination etc.
Providing & Fixing of Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GI stay rod & 7/3.15 mm dia GI stranded wire complete
Providing & Fixing of Wedge Connectors / PG Clamps
Providing & Fixing of Danger Plates with Clamps
Providing & Fixing of Anti Climbing device with Clamps
Providing of Cement bottoming 1:2:4 mix as per REC standards 0.5cum/pole
Laying of 0.25 Km of 11 KV HT Line on 120 mm² AB Cable using 8 Mtr ST Pole
Supply Erection, Testing and Commissioning of 8 Mtr Long ST Pole (ST-410 SP15) including excavation of pit and back filling of soil & consolidating by ramming, watering etc. Including painting with two coats of Red Oxide and Al. Paint for smooth surface.
Supply Erection, Testing and Commissioning of 11kV, Three core 120 mm2 Aluminium round wire Armoured XLPE Cable , FRLS, XLPE(11 kV, 3C + 70 mmsq Earth support wire)
Supply Erection, Testing and Commissioning of Heat Shrinkable Outdoor Cable Termination Kit
Providing and fixing of Suspension/Tension Clamp with eye hook including all necessary arrangements
Providing and Fixing of Galvinized Nuts and Bolts.
Providing and Fixing of Danger Plates
Providing and Fixing of Anti-Climbing Device with Clamps
Providing of Earthing Complete by GI Pipe 40 mm or GI Rod 20mm 2.5 mtr long through GI strip
Providing of Cement bottoming 1:2:4 mix as per REC standards .45cum/pole
Supply Erection, Testing and Commissioning of Mid Span Straight Throgh Jointing Kit for 11 kV ABC
Supply Erection, Testing and Commissioning of Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete
Installation of CT/PT Unit with Trivector Meter
Supply erection testing & commissioning of 11 KV CT/PT Metering Unit for 250 KVA S/stn including 3-Phase, 4 Wire Trivector Meter with Compatible Meter Box and PVC Copper Control Cable 10 Core of suitable Length (complete Unit) (Conforming ISI Standards) Including Fixing of MS Channel Iron, Cross arms, Angle Iron Braces, Clamps as per site requirement etc. duly fabricated, red oxide & aluminium paint coated including all necessary Nut & Bolts & Washers etc.
Particulars of works for erection & commissioning of Isolation point
Supply, Erection, Testing & Commissioning of 9 Mtr Long PCC Pole (WL-300Kg) including Transportation to erection site, excavation of pit and back filling of soil & consolidating by ramming, watering etc.
Supply ,Fabrication & Fixing of GI Channel Iron, GI Cross arms, GI Angle Iron Braces, GI Clamps etc duly fabricated including all necessary GI Nut & Bolts & Washers etc.
Supply, Laying & Stringing of ACSR Weasel Conductor on Cross arms through insulators including proper binding & twisting with soft Aluminium Wire
Providing & Fixing of PG Clamps for 30mm² ACSR Conductor
Supply, Installation, Testing & Commissioning of 11 KV GO AB Switch, 3-phase, 3-pole, 400 Amp.
Supply, Installation, Testing & Commissioning of Gapless Surge Arrestor,9 kV ,10 kA ,LA with polymer housing, Stn. Type
Providing & Fixing of 11kV Polymeric composite Pin Insulator 12kV, 10kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm
Providing & Fixing of 11kV Polymeric composite Disc Insulator 12kV,min failing load 45kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm
Supply & Fixing of Stay Set with 50 x 8 mm Stay Clamp, Guy Insulator (2 Nos), Anchoring Plate (200 x 200 x 6 mm), Nut & Bolts, 2 No Turn Buckle, 1.8m long, 16 mm diameter solid Stay Rod & 7/3.15 mm dia stranded wire complete
Supply & Fixing of Danger Plates with Clamps
Supply & Fixing of Anti Climbing device with Clamps
Providing of Earthing Complete by GI Pipe 40 mm or GI Rod 20 mm, 2.5 Mtr Long through GI Strip(2 nos for PCC poles & ino. For G O Switch/LA)
Providing of Stone Pad 300 mmx300mmx75mm
NEW ALLIED TRADERS
M/S VINAYAK ENGINEERS
Sharma Enterprises
VEENA CONSTRUCTION CO.
Fab Power Pvt. Ltd.
JASMEET SINGH
M/S NEW TRIKUTA TECHNOCRATES
SONI TECHNICAL SOLUTION
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .