| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1Accepted-Finance A 703 KOLDONGRI SOCIETY PARSIWADA SAHAR ROAD ANDHERI EAST MUMBAI 400099 | MUMBAI | MUMBAI SUBURBAN | MAHARASHTRA | 400099 | ₹1 | L1 | Accepted-Finance L1 |
| 2 | L2₹2+₹1 (100.0%)Rejected-Finance | ₹2+₹1 (100.0%) | L2 | Rejected-Finance L2 |
| 3 | Rejected-Technical 401 501 HARSH ANAND YEOLEKAR MALA COLLEGE ROAD NASHIK 422005 | NASHIK | NASHIK | MAHARASHTRA | 422005 | - | - | Rejected-Technical Disqualified |
| Sl No | Description | Qty | Unit | Mahendra And Co L1 | FALCON INFRTAECH L2 |
|---|---|---|---|---|---|
| 1.00 | Excavation for foundation in earth, soil of all types, sand gravel and so I mmrumn ,including removing Rupees Per One the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading Cubic Cubic as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, Metre L Metres watering including shoring and strutting etc. complete. | 1,839.26 | Per One Cubic Metres | 250 ₹4,59,815 Lowest | 255 ₹4,69,011.3 |
| 2.00 | Excavation for foundation in hard mr m including removing the excavated material upto a distance Rurpees Per One Cubic Cubic of 50 metres beyond the building area and stacking and spreading as directed. dewatering. preparing Metres the bed for the foundation and neoessary back filling ramming watering including shoring and Metre strutting etc. camplete. | 1,261.17 | Per One Cubic Metres | 430 ₹5,42,303.1 Lowest | 500 ₹6,30,585 |
| 3.00 | Excavation for foundation in Soft rock and old cement or lime masonry foundations including Rupees Per One Cubic Cubic removing the excavated material upto a distance of 50 metres beyond the buildin g area and stacking Metre Metres 2s direct including dewatering. preparing the bed for the foundation and necessary back flling with available earth'mrum, ramming ,watering including shoring and strutting etc. complete. | 821.51 | Per One Cubic Metres | 550 ₹4,51,830.5 Lowest | 551 ₹4,52,652.01 |
| 4.00 | Excavation for foundation in laterite rock (soft or hard) including trimming and leveling the bed for Rapees Per One the foundation, removing the excavated material up to a distance of 50 metres beyond the bulding Cubic Cubic Metre Metres aea, stadking as directed, dewatering and back filling with available murum, watering, ramming etc complete. | 256.13 | Per One Cubic Metres | 1,538 ₹3,93,927.94 Lowest | 1,540 ₹3,94,440.2 |
| 5.00 | Providing soling using 80 mm size trap metal in 15 cm layer including filling woids with Crushed Rarpees Per One Cubic sand/grit, ramming, watering etc. complete Cnbic Metres | 275.61 | Per One Cubic Metres | 2,400 ₹6,61,464 Lowest | 2,500 ₹6,89,025 |
| 6.00 | Dewatering oa BHP basis by using water pump including diversion of stream, providing cofferdams, earthern bunds etc. as may be necessary for foundation and other parts of the the works and out water during and after excavation as may be required by using 3.0 BHP pump etc. | 50 | Per One Hour | 187.95 ₹9,397.5 Lowest | 190 ₹9,500 |
| 7.00 | Providing and laying Cast in situ Ready Mixcement concrete in M20 of trap granite/quartzite/ gneiss Rupees Per One Cubic metal for steps including centering. formwor k, laying/pumping. compacting. roughening them if Cubic Metres soecial inish is to be provided, finishing uncven and honeycombed surface and curing etc. complete. Metre The Cement Mortar 1:3 plaster is considered for rendering uneven and honcycombed sur face, only. Newly laid toncrete shall be covered by gunny bag, plastic, tarpaulin etc. (Wooden centcring will not be allowed.), with fully automatic micro processor based PLC with SCADA enabled reversible A Drum Type mixer/ concete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VST Grade) | 184.75 | Per One Cubic Metres | 8,172.17 ₹15,09,808.41 Lowest | 8,180 ₹15,11,255 |
| 8.00 | Providing and laying Cast in situw/Ready Mix cement concrete in M15 of trap/ granite/quartzite/gneiss Rupees Per One Cubic metal for foundation and bedding steps including steel centering. formwe.t laying pumping. Cubic Metres compacting. roughening them if special finish is to be provided, finishing uneven and honcycombed Metre surface and curing etc. complete. The Cement Mortar 1:3 plaster is considered for rendering uneven and honcycombed surface, only. Newly laid concrete shall be covered by gunny bag, plastic, tarpaulin etc. (Wooden centering will not be allowed ), with fully automatic micr o processor based PLC with SCADA cnabled reversible Drum Type mixer/concrete Batch mix plant (Pan mixer) etc complete With fine aggsegate (Crushed sand VSI Grade) | 292.57 | Per One Cubic Metres | 7,819.81 ₹22,87,841.81 Lowest | 7,820 ₹22,87,897.4 |
| 9.00 | Flling in plinth and floors with approved excavated material in 15cm to 20cm layers including Rupees Per One Cubic watering and compacting etc. complete | 503.26 | Per One Cubic Metres | 126 ₹63,410.76 Lowest | 130 ₹65,423.8 |
| 10.00 | Providing preconstructional antitermite treatment as per 1 S, 6313 (Part-I1) by treating the bottom Rupees Per One Square surface and sides of excavation at the rate of 5 litres of emulsion concentrate of 1.0 percent of Square Metres chlorophyrifos per square meter of surface area cover ing 10 years guarantee on bond paper | 1,673.05 | Per One Square Metres | 112.35 ₹1,87,967.17 Lowest | 115 ₹1,92,400.75 |
Tender Value
₹23.5 Cr
EMD Value
₹11.7 L
Closing Date
26 Sept 2025, 6:50 pmClosed
Executive Engineer, North Mumbai (P.W.) Division,
Executive Engineer, North Mumbai (P.W.) Division, Andheri , Mumbai , Administrative Building , First floor , Near Bhavans Collage , Andheri 400058
Construction of District Women and Child Development Building Mahila Bal Vikas Bhavan Ahilyadevi Bhavan CTS No. 121 at Children Aid Society Agarwadi, Mankhurd Mumbai
2025_PWR_1220417_1
NIT_NO_32_FOR_2025_26
Open Tender
Civil Works
Item Rate
700 days
andheri
As Per Tender Documents
2 documents required · 2 mandatory
₹3,540
₹11.7 L
Chief Engineer, Mumbai, (P.W.) Region, Mumbai Band
15 Jul 2026
19 Sept 2025
29 Sept 2025
19 Sept 2025
26 Sept 2025
19 Sept 2025
19 Sept 2025 - 23 Sept 2025
23 Sept 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation for foundation in earth, soil of all types, sand gravel and so I mmrumn ,including removing Rupees Per One the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading Cubic Cubic as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, Metre L Metres watering including shoring and strutting etc. complete. | 1 | Per One Cubic Metres | 1 | ₹1 |
| 2 | Excavation for foundation in hard mr m including removing the excavated material upto a distance Rurpees Per One Cubic Cubic of 50 metres beyond the building area and stacking and spreading as directed. dewatering. preparing Metres the bed for the foundation and neoessary back filling ramming watering including shoring and Metre strutting etc. camplete. | - | Per One Cubic Metres | 1 | - |
| 3 | Excavation for foundation in Soft rock and old cement or lime masonry foundations including Rupees Per One Cubic Cubic removing the excavated material upto a distance of 50 metres beyond the buildin g area and stacking Metre Metres 2s direct including dewatering. preparing the bed for the foundation and necessary back flling with available earth'mrum, ramming ,watering including shoring and strutting etc. complete. | 1 | Per One Cubic Metres | 1 | ₹1 |
| 4 | Excavation for foundation in laterite rock (soft or hard) including trimming and leveling the bed for Rapees Per One the foundation, removing the excavated material up to a distance of 50 metres beyond the bulding Cubic Cubic Metre Metres aea, stadking as directed, dewatering and back filling with available murum, watering, ramming etc complete. | 1 | Per One Cubic Metres | 1 | ₹1 |
| 5 | Providing soling using 80 mm size trap metal in 15 cm layer including filling woids with Crushed Rarpees Per One Cubic sand/grit, ramming, watering etc. complete Cnbic Metres | - | Per One Cubic Metres | 1 | - |
| 6 | Dewatering oa BHP basis by using water pump including diversion of stream, providing cofferdams, earthern bunds etc. as may be necessary for foundation and other parts of the the works and out water during and after excavation as may be required by using 3.0 BHP pump etc. | - | Per One Hour | 1 | - |
| 7 | Providing and laying Cast in situ Ready Mixcement concrete in M20 of trap granite/quartzite/ gneiss Rupees Per One Cubic metal for steps including centering. formwor k, laying/pumping. compacting. roughening them if Cubic Metres soecial inish is to be provided, finishing uncven and honeycombed surface and curing etc. complete. Metre The Cement Mortar 1:3 plaster is considered for rendering uneven and honcycombed sur face, only. Newly laid toncrete shall be covered by gunny bag, plastic, tarpaulin etc. (Wooden centcring will not be allowed.), with fully automatic micro processor based PLC with SCADA enabled reversible A Drum Type mixer/ concete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VST Grade) | - | Per One Cubic Metres | 1 | - |
| 8 | Providing and laying Cast in situw/Ready Mix cement concrete in M15 of trap/ granite/quartzite/gneiss Rupees Per One Cubic metal for foundation and bedding steps including steel centering. formwe.t laying pumping. Cubic Metres compacting. roughening them if special finish is to be provided, finishing uneven and honcycombed Metre surface and curing etc. complete. The Cement Mortar 1:3 plaster is considered for rendering uneven and honcycombed surface, only. Newly laid concrete shall be covered by gunny bag, plastic, tarpaulin etc. (Wooden centering will not be allowed ), with fully automatic micr o processor based PLC with SCADA cnabled reversible Drum Type mixer/concrete Batch mix plant (Pan mixer) etc complete With fine aggsegate (Crushed sand VSI Grade) | 1 | Per One Cubic Metres | 1 | ₹1 |
| 9 | Flling in plinth and floors with approved excavated material in 15cm to 20cm layers including Rupees Per One Cubic watering and compacting etc. complete | 1 | Per One Cubic Metres | 1 | ₹1 |
| 10 | Providing preconstructional antitermite treatment as per 1 S, 6313 (Part-I1) by treating the bottom Rupees Per One Square surface and sides of excavation at the rate of 5 litres of emulsion concentrate of 1.0 percent of Square Metres chlorophyrifos per square meter of surface area cover ing 10 years guarantee on bond paper | 1 | Per One Square Metres | 1 | ₹1 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.20 MB
BOQ_2106951.xls
BOQ • 0.54 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .