Loading…
Loading…
Tender ID
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical 86 PURUSOTTAM ROY STREET KOLKATA 700007 | KOLKATA | WEST BENGAL | 700007 | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical 1 PARSWADA POST SHAHAGANJ VILLAGE | INDORE | INDORE | MADHYA PRADESH | Admitted-Fee/PreQual/Technical |
Tender Value
Refer Docs
EMD Value
₹10 L
Closing Date
6 Apr 2026, 2:00 pmClosed
DIRECTOR GENERAL ,WATER SUPPLY, KMC
Office of the D.G(WS),KMC, 5 S.N.Banerjee Road kol-700013
OPERATION AND MAINTENANCE OF 60 MGD CAPACITY WATER TREATMENT PLANT, PHASE- II ON ROUND THE CLOCK BASIS AT GARDEN REACH WATER WORKS (GRWW) FOR A PERIOD OF THREE YEARS.
2026_KMC_1016038_1
WS/GRWW/PH-II/05/2025-26/35
Open Tender
Miscellaneous Works
Item Rate
1096 days
WTP-II, GRWW
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹10 L
Office of the D.G(WS),KMC,5 S.N.Banerjee Road
18 Jun 2026
27 Feb 2026
8 Apr 2026
27 Feb 2026
6 Apr 2026
27 Feb 2026
9 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Operation & Maintenance of 60 MGD capacity Water Treatment Plant PH-II of Garden Reach Water Works, KMC. {Rates to be quoted considering expenses for all operation and maintenance activities and supply of Chemicals (Alum/PAC etc.), sweeping accessories, official stationeries, including laboratory reagents for successful O& M of the plant for the production of 60 MGD Drinking Water and other related works, as per direction of E.I.C., as mentioned in the scope of work in Tender Document. } In order to maintain the uninterrupted production of potable water from 60 MGD WTP. (For the period of first 12 months). | |||||
| 1.1 | Labour component (Approx. 22.12% of Total cost) : This monthly cost remains unaltered from the date of commencement of work till a new order (as per circular of mpl. Secretary as indicated in the Tender Document ) comes in effect. This also indicates the base cost upon which the first increment will be in effect. | - | - | - | - |
| 1.2 | Other than labour component (Approx. 77.88% of Total cost) : This monthly cost remains unaltered from the date of commencement of work till end of first twelve months. This also indicates the base cost upon which monthly cost of second year will be determined. | - | - | - | - |
| 2Operation & Maintenance of 60 MGD capacity Water Treatment Plant PH-II of Garden Reach Water Works, KMC. {Rates to be quoted considering expenses for all operation and maintenance activities and supply of Chemicals (Alum/PAC etc.), sweeping accessories, official stationeries, including laboratory reagents for successful O& M of the plant for the production of 60 MGD Drinking Water and other related works, as per direction of E.I.C., as mentioned in the scope of work in Tender Document. } In order to maintain the uninterrupted production of potable water from 60 MGD WTP. (For the period of 2ND 12 months). | |||||
| 2.1 | Labour component (Approx. 22.12% of Total cost) : This monthly cost remains unaltered from the commencement of just previous determined rate till a new order (as per circular of Mpl. Secretary as indicated in the Tender Document ) comes in effect. This also indicates the base cost upon which the next increment will be in effect. | - | - | - | - |
| 2.2 | Other than labour component (Approx. 77.88% of Total cost) : This monthly cost is increased at the rate of five percent on the monthly rate of previous year. This also indicates the base cost upon which monthly cost of subsequent year will be determined. | - | - | - | - |
| 3Operation & Maintenance of 60 MGD capacity Water Treatment Plant PH-II of Garden Reach Water Works, KMC. {Rates to be quoted considering expenses for all operation and maintenance activities and supply of Chemicals (Alum/PAC etc.), sweeping accessories, official stationeries, including laboratory reagents for successful O& M of the plant for the production of 60 MGD Drinking Water and other related works, as per direction of E.I.C., as mentioned in the scope of work in Tender Document. } In order to maintain the uninterrupted production of potable water from 60 MGD WTP. (For the period of 3RD 12 months).. | |||||
| 3.1 | Labour component (Approx. 22.12% of Total cost) : This monthly cost remains unaltered from the commencement of just previous determined rate till a new order (as per circular of Mpl. Secretary as indicated in the Tender Document ) comes in effect. This also indicates the base cost upon which the next increment will be in effect. | - | - | - | - |
| 3.2 | Other than labour component (Approx. 77.88% of Total cost) : This monthly cost is increased at the rate of five percent on the monthly rate of previous year. This also indicates the base cost upon which monthly cost of subsequent year will be determined. | - | - | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
cancelled_1.pdf
pdf • 0.04 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.86 MB
Techbid05of35.pdf
Tender Documents • 1.59 MB
BOQ_2496116.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .