| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.8 LAdmitted-Finance | ₹4.8 L | L1 | Admitted-Finance |
| 2 | L2₹4.8 LAdmitted-Finance CHENNAI | CHENNAI | TAMIL NADU | 600001 | ₹4.8 L | L2 | Admitted-Finance |
| 3 | Not Admitted-Finance 727 EAST KATTU KOTTAI NADUVALUR POST GANGAVALLI TK SALEM DT | - | - | Not Admitted-Finance Others-Tender withdrawn by contractor. |
| 4 | Not Admitted-Finance | - | - | Not Admitted-Finance Others-Tender withdrawn by contractor. |
| Sl No | Description | Qty | Unit | P.Jayabal L1 | Sudha L2 |
|---|---|---|---|---|---|
| 1.001.) Construction of Mini Sanitary Complex in PUE School at Nadumedu H/o Kamakkapalayam | |||||
| 2.00 | Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation. | 32.25 | cum | 260 ₹8,385 Lowest | 270 ₹8,707.5 |
| 3.00 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed for foundation | 5.85 | cum | 5,665 ₹33,140.25 Lowest | 5,670 ₹33,169.5 |
| 4.00 | Random Rubble Masonry in cement Mortar 1 : 5 for foundation and basement using New Stones including necessary provision for Bond stones with simultaneous flush pointing with the same mortar above ground level complying with standard specifications. | 18.79 | cum | 6,000 ₹1,12,740 Lowest | 6,015 ₹1,13,021.85 |
| 5.00 | Brickwork in CM 1:5 mix using country bicks including cost & conveyance of all materials to site and all labour charges for curing, compacting etc., complete. | 10.37 | cum | 6,250 ₹64,812.5 Lowest | 6,280 ₹65,123.6 |
| 6.00 | Supply & Fabrication of steel including all cost and conveyance of all materials to site and all labour charges for etc., complete. | 0.19 | MT | 91,858.5 ₹17,453.12 Lowest | 92,000 ₹17,480 |
| 7.00 | Supplying & Erecting centering for sides & soffiots including necessary supports for all Rcc works etc.complete (Below) | 16.13 | Sqm | 1,095 ₹17,662.35 Lowest | 1,095 ₹17,662.35 Lowest |
| 8.00 | Reinforced Cement Concrete 1:1.5:3 mix using 20 mm metal for all items including cost & conveyance and labour charges etc complete. | 2.05 | cum | 9,277.31 ₹19,018.49 Lowest | 9,277.31 ₹19,018.49 Lowest |
| 9.00 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty should be got approved by the Executive Engineer before use on work. (Based on SoR 2023-24) Wall putty Powder: (10 sqm/10x20 kg= 20Kg) | 6.41 | Sqm | 308.85 ₹1,979.73 Lowest | 308.85 ₹1,979.73 Lowest |
| 10.00Cost and supply of following provision are made in this estimate including all cost and conveyance of all materials to site and all labour charges for etc., complete. | |||||
Tender Value
₹5.0 L
EMD Value
₹5,000
Closing Date
5 Aug 2026, 3:00 pmClosed
Block Development officer
Union office , Thalaivasal
Construction of Mini Sanitary Complex in PUE School at Nadumedu H/o Kamakkapalayam
2026_RDTN_686632_1
Roc.738/2026/T-5
Open Tender
Civil Works
Item Wise
Items
Construction of Mini Sanitary Complex in PUE School at Nadumedu H/o Kamakkapalayam
3 documents required · 3 mandatory
₹0
₹5,000
11 Aug 2026
18 Jul 2026
5 Aug 2026
18 Jul 2026
5 Aug 2026
18 Jul 2026
18 Jul 2026 - 5 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 1.) Construction of Mini Sanitary Complex in PUE School at Nadumedu H/o Kamakkapalayam | - | - | - | - |
| 2 | Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation. | 32.25 | cum | - | - |
| 3 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed for foundation | 5.85 | cum | - | - |
| 4 | Random Rubble Masonry in cement Mortar 1 : 5 for foundation and basement using New Stones including necessary provision for Bond stones with simultaneous flush pointing with the same mortar above ground level complying with standard specifications. | 18.79 | cum | - | - |
| 5 | Brickwork in CM 1:5 mix using country bicks including cost & conveyance of all materials to site and all labour charges for curing, compacting etc., complete. | 10.37 | cum | - | - |
| 6 | Supply & Fabrication of steel including all cost and conveyance of all materials to site and all labour charges for etc., complete. | 1 | MT | - | - |
| 7 | Supplying & Erecting centering for sides & soffiots including necessary supports for all Rcc works etc.complete (Below) | 16.13 | Sqm | - | - |
| 8 | Reinforced Cement Concrete 1:1.5:3 mix using 20 mm metal for all items including cost & conveyance and labour charges etc complete. | 2.05 | cum | - | - |
| 9 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty should be got approved by the Executive Engineer before use on work. (Based on SoR 2023-24) Wall putty Powder: (10 sqm/10x20 kg= 20Kg) | 6.41 | Sqm | - | - |
| 10 | Cost and supply of following provision are made in this estimate including all cost and conveyance of all materials to site and all labour charges for etc., complete. | - | - | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.09 MB
04.pdf
Tender Documents • 0.49 MB
BOQ_825370.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].