| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 CrAccepted-AOC | ₹1.8 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.8 Cr+₹1.2 L (0.66%)Rejected-Finance 4 190 RAMANATHAPURAM MAIN ROAD C K MANGALAM THIRUVADANAI TK RAMANATHAPURAM 623402 | RAMANATHAPURAM | TAMIL NADU | 623402 | ₹1.8 Cr+₹1.2 L (0.66%) | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | G RAGUPATHY L1 | M.R AND CO L2 |
|---|---|---|---|---|---|
| 1.00Part I :Strengthening to the Road From Thiruvadanai - oriyur road to ettukudi road KM 0/0 - 1/786 R-22 | |||||
| 2.00 | Clearing the Light Jungle with out uprooting including all labour charges | 1,928.88 | Sqm | 5.9 ₹11,380.39 Lowest | 5.9 ₹11,380.39 Lowest |
| 3.00 | Picking the Existing B.T surface including all labour charges etc complete | 2,232.5 | Sqm | 21.8 ₹48,668.5 Lowest | 21.8 ₹48,668.5 Lowest |
| 4.00 | Earthwork in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation fo bunds, breaking clods, sectioning etc., compelte. | 853.1 | cum | 131 ₹1,11,756.1 Lowest | 131 ₹1,11,756.1 Lowest |
| 5.00Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete. | |||||
| 6.00 | Km 0/0 - 1/0 | 223.69 | cum | 805 ₹1,80,070.45 Lowest | 810 ₹1,81,188.9 |
| 7.00 | Km 1/0 - 1/786 | 176.2 | cum | 814.5 ₹1,43,514.9 Lowest | 820 ₹1,44,484 |
| 8.00Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | |||||
| 9.00 | Km 0/0 - 1/0 | 467.67 | cum | 2,840 ₹13,28,182.8 Lowest | 3,040 ₹14,21,716.8 |
| 10.00 | Km 1/0 - 1/786 | 368.2 | cum | 2,840 ₹10,45,688 Lowest | 3,040 ₹11,19,328 |
Tender Value
Refer Docs
EMD Value
₹1.9 L
Closing Date
2 Jul 2025, 3:00 pmClosed
The Additional Collector (Dev.)
DRDA, Ramanathapuram
Ramanathapuram District-NABARD XXXI 10/2025-26- Thiruvadanai Block
2025_RDTN_567784_11
DIPR/2866/Tender/2025
Open Tender
Civil Works - Roads
Item Rate
180 days
DRDA
As Per Tender Document
4 documents required · 4 mandatory
₹0
₹1.9 L
14 Aug 2025
12 Jun 2025
2 Jul 2025
12 Jun 2025
2 Jul 2025
12 Jun 2025
Amount
Part I :Strengthening to the Road From Thiruvadanai - oriyur road to ettukudi road KM 0/0 - 1/786 R-22
Clearing the Light Jungle with out uprooting including all labour charges
Picking the Existing B.T surface including all labour charges etc complete
Earthwork in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation fo bunds, breaking clods, sectioning etc., compelte.
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WBM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all
BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Provision for Road Marking with that Applied Thermo Plastic Compound etc
60cm Equilateral Triangle Cautionary Sign Board
60cm Circle (Mandatory sign)
Chevron Board 90 cm octagan
Reflector
Hecta metre stone
KM stone
Construction of Rcc Slab Culvert at 1.50m span at ch- 571m
Earth work excavation & Depositing on bank with initial lead of 10m and lift & 2m in hard stiiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth mixed with small size boulder and in hard gravelly
Concrete concrete with (1:4:8)using 40mm ISS HBG stone in open foundations complete as per drawings and technical specification clause 802,803,1202&1203
Centering, shuttering and strutting to the soffits of RCC slabs and beams including cost and conveyance of all materials to site etc., complete.(Below G.L)
Centering, shuttering and strutting to the soffits of RCC slabs and beams including cost and conveyance of all materials to site etc., complete.(Above G.L)
Cement concrete in 1:3:6 mix using 40mm metal including cost of conveyance all materials of all labour charges etc., complete.
Cement concrete in 1:2:4 mix using 20mm metal including cost of conveyance all materials of all labour charges etc., complete.
Reinforced Cement Concrete 1:11/2:3 mix using 20mm ISS size hard granite broken metal from appd.quarry including cost and conveyance of all materials to site for Deck Slab
Supplying and fabrication charges for steel including cost and conveyance of all materials and labour charges etc complete.
Providing and Fixing of Bitumen pad
Provision for Abutment PVS Seepage Pipes
Construction of Rcc Slab Culvert at 1.50m span at ch- 927m
Earth work excavation & Depositing on bank with initial lead of 10m and lift & 2m in hard stiiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth mixed with small size boulder and in hard gravelly
Concrete concrete with (1:4:8)using 40mm ISS HBG stone in open foundations complete as per drawings and technical specification clause 802,803,1202&1203
Centering, shuttering and strutting to the soffits of RCC slabs and beams including cost and conveyance of all materials to site etc., complete.(Below G.L)
Centering, shuttering and strutting to the soffits of RCC slabs and beams including cost and conveyance of all materials to site etc., complete.(Above G.L)
Cement concrete in 1:3:6 mix using 40mm metal including cost of conveyance all materials of all labour charges etc., complete.
Cement concrete in 1:2:4 mix using 20mm metal including cost of conveyance all materials of all labour charges etc., complete.
Reinforced Cement Concrete 1:11/2:3 mix using 20mm ISS size hard granite broken metal from appd.quarry including cost and conveyance of all materials to site for Deck Slab
Supplying and fabrication charges for steel including cost and conveyance of all materials and labour charges etc complete.
Providing and Fixing of Bitumen pad
Provision for Abutment PVS Seepage Pipes
Construction of Rcc Slab Culvert at 1.50m span at ch- 1389m
Earth work excavation & Depositing on bank with initial lead of 10m and lift & 2m in hard stiiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth mixed with small size boulder and in hard gravelly
Concrete concrete with (1:4:8)using 40mm ISS HBG stone in open foundations complete as per drawings and technical specification clause 802,803,1202&1203
Centering, shuttering and strutting to the soffits of RCC slabs and beams including cost and conveyance of all materials to site etc., complete.(Below G.L)
Centering, shuttering and strutting to the soffits of RCC slabs and beams including cost and conveyance of all materials to site etc., complete.(Above G.L)
Cement concrete in 1:3:6 mix using 40mm metal including cost of conveyance all materials of all labour charges etc., complete.
Cement concrete in 1:2:4 mix using 20mm metal including cost of conveyance all materials of all labour charges etc., complete.
Reinforced Cement Concrete 1:11/2:3 mix using 20mm ISS size hard granite broken metal from appd.quarry including cost and conveyance of all materials to site for Deck Slab
Supplying and fabrication charges for steel including cost and conveyance of all materials and labour charges etc complete.
Providing and Fixing of Bitumen pad
Provision for Abutment PVS Seepage Pipes
Part II - Strengthening to the Road From Pandukudi Kodipangu Road to Ettukudi Link Road Km 0/0 - 1/528 R243 VPR
Clearing the Light Jungle with out uprooting including all labour charges
Picking the Existing B.T surface including all labour charges etc complete
Earthwork in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation fo bunds, breaking clods, sectioning etc., compelte.
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WBM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all
BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Road marking with Hot Applied Thermopalstic compound with reflectorising Glass beads on Bituminous surface
60 cm Equilateral Traingle cautionary Sign board
60cm Circle (Mandatory sign)
Guard stone (precast )
Hecta metre stone
KM stone
Construction of Rcc Slab Culvert at 1.50m span at ch- 8 m
Earth work excavation & Depositing on bank with initial lead of 10m and lift & 2m in hard stiiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth mixed with small size boulder and in hard gravelly
Concrete concrete with (1:4:8)using 40mm ISS HBG stone in open foundations complete as per drawings and technical specification clause 802,803,1202&1203
Centering, shuttering and strutting to the soffits of RCC slabs and beams including cost and conveyance of all materials to site etc., complete.(Below G.L)
Centering, shuttering and strutting to the soffits of RCC slabs and beams including cost and conveyance of all materials to site etc., complete.(Above G.L)
Cement concrete in 1:3:6 mix using 40mm metal including cost of conveyance all materials of all labour charges etc., complete.
Cement concrete in 1:2:4 mix using 20mm metal including cost of conveyance all materials of all labour charges etc., complete.
Supplying and fabricating and placing inposition mild steel or Ribbed Tor steel for all reinforcedCement Concrete works as per the design given including cost of steel and binding wire in all floor etc., complete complying
Reinforced Cement Concrete 1:11/2:3 mix using 20mm ISS size hard granite broken metal from appd.quarry including cost and conveyance of all materials to site for Deck Slab
Providing and Fixing of Bitumen pad
Provision for Abutment PVS Seepage Pipes
Construction of Retaining wall at Ch - 119m - 126m
Earth work excavation & Depositing on bank with initial lead of 10m and lift & 2m in hard stiiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth mixed with small size boulder and in hard gravelly
Collection and filling of M.sand including cost and conveyance to site and all labour charges for filling water and ramming etc., complete for foundation.
Concrete concrete with (1:4:8)using 40mm ISS HBG stone in open foundations complete as per drawings and technical specification clause 802,803,1202&1203
Centering, shuttering and strutting to the soffits of RCC slabs and beams including cost and conveyance of all materials to site etc., complete.(Below G.L)
Concrete concrete with (1:3:6)using 40mm ISS HBG stone in open foundations complete as per drawings and technical specification clause 802,803,1202&1203
Construction of Toe wall at Ch - 709 - 734m
Earth work excavation & Depositing on bank with initial lead of 10m and lift & 2m in hard stiiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth mixed with small size boulder and in hard gravelly
Collection and filling of M.sand including cost and conveyance to site and all labour charges for filling water and ramming etc., complete for foundation.
Concrete concrete with (1:4:8)using 40mm ISS HBG stone in open foundations complete as per drawings and technical specification clause 802,803,1202&1203
Centering, shuttering and strutting to the soffits of RCC slabs and beams including cost and conveyance of all materials to site etc., complete.(Below G.L)
Concrete concrete with (1:3:6)using 40mm ISS HBG stone in open foundations complete as per drawings and technical specification clause 802,803,1202&1203
Construction of 900mm dia Pipe Culvert at Ch - 1127m
Earth work excavation & Depositing on bank with initial lead of 10m and lift & 2m in hard stiiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth mixed with small size boulder and in hard gravelly
Collection and filling of M.sand including cost and conveyance to site and all labour charges for filling water and ramming etc., complete for foundation.
Concrete concrete with (1:4:8)using 40mm ISS HBG stone in open foundations complete as per drawings and technical specification clause 802,803,1202&1203
Centering, shuttering and strutting to the soffits of RCC slabs and beams including cost and conveyance of all materials to site etc., complete.(Below G.L)
Concrete concrete with (1:3:6)using 40mm ISS HBG stone in open foundations complete as per drawings and technical specification clause 802,803,1202&1203
Provision for 900mm dia RCC Pipe NP3 Including all Labour Charges
Part I :Strengthening to the Road From Thiruvadanai - oriyur road to ettukudi road KM 0/0 - 1/786 R-22 Maintenance of the road
Towards the charges for routline maintenance of the road work executed under PMGSY including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
Part II :Strengthening to the Road From Pandukudi Kodipangu Road to Ettukudi Link Road Km 0/0 - 1/528 R243 VPR Maintenance of the road
Towards the charges for routline maintenance of the road work executed under PMGSY including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
M.R AND CO (BID ID -1374569)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .