Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹7.8 LAccepted-AOC MILLAT COLONY DORANDA HINOO RANCHI | RANCHI | JHARKHAND | 829205 | l1 | Accepted-AOC OK | |
| 2 | L2₹8.0 L+₹14,154.90 (1.81%)Rejected-Finance AT BACHRA PO BACHRA DISTT CHATRA JHARKHAND | NA | NA | 825103 | L2 | Rejected-Finance OK | |
| 3 | Rejected-Technical | - | Rejected-Technical Non Responsive |
Tender Value
₹8.0 L
EMD Value
₹16,100
Closing Date
5 May 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE RMC
RMC
Construction of RCC Drain at Pathar road Jodha Mandir gali from house of Niranjan Ghosh to house of Narendra Tiwari under ward No-49
2026_UDD_113390_2
268/eng 2026
Open Tender
Civil Works
Works
60 days
AS PER NIT
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
₹16,100
21 Nov 2026
28 Apr 2026
6 May 2026
28 Apr 2026
5 May 2026
28 Apr 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Labour for cleaning the work site before and after work etc. | |||||
| 1.01 | Earth work in excavation in foundation trenches in ordinary soil (vide classification of soil item-A) and disposal of excavated earth as obtained to a distance up to 50 M. including all lifts, levelling, ramming the foundation trenches removing roots of trees, shrubs all complete as per approved design, building specification and direction of E/I. Extra for earthwork in hard soil as per specification & direction of E/I.(vide classification of soil item-B) | 88.15 | m3 | 151.82 | ₹13,382.93 |
| 2 | Providing,supplying & spreding of stone dust in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150 mm thick with all leads and lifts including cost of materials, labour,royality and taxes all complete as per specification and direction of E/I ( Mode of measurment compacted volume.) | 5.72 | m3 | 347.85 | ₹1,989.7 |
| 3 | Supplying and laying (properly as per design and drawing ) rip-rap with good quality of boulders duty packed including the cost of materials royalty all taxes etc. but excluding the cost of carriage all complete as per specification and direction of E/I. | 14.12 | M3 | 1,756.4 | ₹24,800.37 |
| 4 | Providing RCC-M200 with nominal mix of (1:1.5:3) in foundation and plinth with approved quality of stone --do--all complete as per drawing and Technical specification. | 26.18 | M3 | 6,082.45 | ₹1,59,238.54 |
| 5 | Providing precast R.C.C. M-200 with nominal mix of (1:1.5:3) in slab of desired size with approved quality of stone chips and clean coarse sand of F.M. 2.5 to 3 including cost of curing ,shuttering ,carrying the slab manually to site and laying in position all complete (but excluding the cost of reinforcement )taxes and royalty all complete as per building specifications and direction of E/I. | 16.82 | M3 | 6,308.87 | ₹1,06,115.19 |
| 6 | Providing Tor steel reinforcement of 8 mm dia bars as per approved design and drawing excluding carriage of Rods (straight or in coils) to work site, cutting, bending and binding with annealed wire with cost of wire, removal of rust, placing the rods in position all complete as per building specification and direction of E/I. | 1.43 | MT | 83,314.02 | ₹1,18,892.62 |
| 7 | Providing Tor steel reinforcement of 8mm,10mm dia bars as per approved design and drawing excluding carriage of Rods (straight or in coils) to work site ,cutting bending and binding with annealed wire with cost of wire ,removal of rust ,placing the rods in position all complete as per building specification and direction of E/I. | 2.14 | MT | 82,096.54 | ₹1,75,732.84 |
| 8 | Centering and Shuttering including struting,propping etc and removal of from for Foundation, footing s bases of Coloumns etc for mass Concrete. | 143.13 | M2 | 194.5 | ₹27,838.79 |
| 9 | Sand with lead of 49 km | 18.49 | M3 | 744.66 | ₹13,768.76 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.07 MB
Tendernotice_2.pdf
PDF • 1.73 MB
BOQ_153140.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .