| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹37.9 LAccepted-AOC 83 5M 1 SHIV GANGA PURAM YADAVPUR ROAD UMARPUR NEEWAN PRAYAGRAJ 211011 | PRAYAGRAJ | UTTAR PRADESH | 211011 | ₹37.9 L | L1 | Accepted-AOC L1 Lowest bid Accepted and L2 Highest bid Rejected |
| 2 | L2₹39.6 L+₹1.6 L (4.35%)Rejected-Finance MEERUT CITY 18550 | 18550 | ₹39.6 L+₹1.6 L (4.35%) | L2 | Rejected-Finance L2 |
| 3 | L3₹46.3 L+₹8.4 L (22.0%)Rejected-Finance 39 F NEW REVENUE COLONY ACHALPUR KADIPUR SADAR PRATAPGARH | PRATAPGARH | PRATAPGARH | UTTAR PRADESH | ₹46.3 L+₹8.4 L (22.0%) | L3 | Rejected-Finance L3 |
Tender Value
₹55 L
EMD Value
₹4.8 L
Closing Date
18 Mar 2026, 12:00 pmClosed
SE MEERUT CIRCLE PWD MEERUT
SE MEERUT CIRCLE PWD MEERUT
New construction work of the road from Dhauldi Khindoda road to Mator Ghaziabad border
2026_CEMRT_1123739_1
615/11Cashier-MC CD Meerut Dt 18-02-26
Open Tender
Civil Works
Percentage
180 days
EE CD PWD MEERUT
CLASS A,B,C
3 documents required · 3 mandatory
₹2,714
₹4.8 L
SE MEERUT CIRCLE PWD MEERUT
30 Jun 2026
12 Mar 2026
18 Mar 2026
12 Mar 2026
18 Mar 2026
12 Mar 2026
12 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation for roadwork in soil using manual means for carrying of cut earth embankment site with a lift upto 1.5m and lead upto 50m as per Technical specification Clause 302.3 | 115 | cum | 189 | ₹21,735 |
| 2 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface., mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, as per MORD specification 401 | 507 | Cum | 3,000 | ₹15,21,000 |
| 3 | Providing laying and Spreadind Material on a prepared sub base adding cement @4% by weight to the spreade materials manually mixing in place with rotavatorand compecting with the road Roller @ OMC to achivethe Desired Unconfined Compressive Strength and to form a layer of base | 450 | Cum | 4,050 | ₹18,22,500 |
| 4 | Providing and applying tack coat with bitumen VG-10 grade using pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. Technical Specificaton Clasue (SI.NO. 503 II). | 3,750 | sqm | 17 | ₹63,750 |
| 5 | Providing, laying and rolling of open - graded premix surfacing of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates using VG-10 Bitumen required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheele 80-100 kn static roller capacity, finished to required level and grades to be followed by Type-C seal coat. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. as per Technical Specification Clause. 508. | 3,750 | sqm | 186 | ₹6,97,500 |
| 6 | Providing and laying Type-C seal coat with VG-10 bitumen sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. as per technical specification clause 510. | 3,750 | sqm | 70 | ₹2,62,500 |
| 7 | Earth work in cutting or in embankment in ordinary soil excavation to be in the form of regular pits not exceeding 0.50 M. in depth and earth work in embankment to be in 20 cm. layers including remming and dressing the surface to required levels and slopes and also including 1.50 M. lift and 3.0 KM. lead. The earth from cutting to be used in making embankment or to be deposited as spoil banks with-in 30 M. distance as directed by the Engineer incharge. (Royality removed by Govt.) for small works/ Abadi area. (where machine can not move) SI No. 253 (a) | 5,000 | cum | 121 | ₹6,05,000 |
| 8 | Earthwork in excavation for structures as per drawing and technical specification Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenchess with excavated suitable material. | 39 | cum | 402 | ₹15,678 |
| 9 | Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 | 6.9 | cum | 6,150 | ₹42,435 |
| 10 | Providing and laying reinforced cement concrete Pipe 600 mm dia NP3 for culvert on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry work in head wall and parapets Clause 1106. | 22.5 | RMT | 3,650 | ₹82,125 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.02 MB
Tendernotice_2.pdf
PDF • 1.52 MB
BOQ_2093662.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .