Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.9 CrAccepted-AOC 171 172 191 192 KUNDLI INDUSTRIAL ESTATE EHTP SEC 56 PHASE V KUNDLI INDUSTRIAL ESTATE SONIPAT HARYANA 131028 | SONIPAT | HARYANA | 131028 | ₹7.9 Cr | L1 | Accepted-AOC Being Lowest |
| 2 | L2₹8.3 Cr+₹35.1 L (4.43%)Rejected-Finance 801802 SAKAR IV OPP MJ LIBERARY ELLISBRIDGE ASHRAM ROAD AHMEDABAD AHMEDABAD GUJARAT 380006 | 801802 | ₹8.3 Cr+₹35.1 L (4.43%) | L2 | Rejected-Finance Not Being L1 |
| 3 | L3₹8.3 Cr+₹43 L (5.43%)Rejected-Finance G1 12 INDEXEL ENGINEERING ROAD NO 4 I P I A KOTA KOTA RAJASTHAN 324005 | KOTA | RAJASTHAN | 324005 | ₹8.3 Cr+₹43 L (5.43%) | L3 | Rejected-Finance Not Being L1 |
| 4 | Rejected-Technical | - | - | Rejected-Technical Do not qualify PQC in respect of work experience No documents submitted and No remarks in latest WLR of CESWC of QE Jun 2024 |
| 5 | Rejected-Technical SHOP NO 10 BMC SHOPPING CENTRE MITHA NAGAR GOREGAON WEST MUMBAI 400 104 | MUMBAI | MUMBAI SUBURBAN | MAHARASHTRA | 400104 | - | - | Rejected-Technical Do not qualify PQC in respect of work experience No documents submitte |
Tender Value
₹9.3 Cr
EMD Value
₹7.9 L
Closing Date
4 Nov 2024, 6:00 pmClosed
CE (CG) GOA
HQ CE (CG) GOA 403806
IMPLEMENTATION OF SCADA AUTOMATION SYSTEM FOR ELECTRICAL AND WATER SUPPLY SERVICES IN MES AT ICG GOA
2024_MES_671486_1
83060/E8
Open Tender
Civil Works
Item Rate
365 days
GOA
AS PER TENDER DOCUMENTS
8 documents required · 8 mandatory
₹3,000
GE (I) (CG) GOA
₹7.9 L
Yes
1 Jan 2025
4 Sept 2024
11 Nov 2024
4 Sept 2024
4 Nov 2024
11 Oct 2024
Amount
Design, Develop, Integrate and Commission SCADA System and its maintenance & operation and comprehensive maintenance for Electric supply system complete all as specified and as directed in following phases and detailed specifications:-
PHASE-I (SCADA SYSTEM ITEM No 1.03)
PHASE-II (MAINTENANCE AND OPERATION ITEM No 1.05)
Operation of SCADA system of Electric Supply System during defect liability period of 2 years through trained/qualified engineer/technician in SCADA system/field without manning. Contractor shall be responsible for repair and maintenance of SCADA system including replacement of all defective parts as and when required. No contineous manning is required but the contractor shall ensure that his technical staff is available to attend to any breakdowns, periodic and regular maintenance. It shall be the responsibility of contractor to keep the system functional. Note :- (i) Cost for comprehensive maintenance including cost of parts required to be replaced will be coverved under defect liability period of two years. No extra payment will be made for the same. (ii) Contractor shall attend the breakdown and repair within 02 hrs and make the system operational. Any further delay is liable to penalty of Rs. 10000/- per day or part thereof. (iii) This item shall be taken as 4% of total amount quoted for the job for payment purpose. Payment against this item shall be made as per following schedule during the period of two years. (a) After 1st year - 2% (b) After 2nd year - 2%
PHASE-III (OPERATION AND COMPREHENSIVE MAINTENANCE ITEM No 1.07)
Operation and comprehensive maintenance of SCADA system of Electric Supply System including cost of parts requiring replacement up-gradation of components & software, all the spares as well as periodic up gradation including monthly payment to telecom for 8 years post defect libility period of 02 years. The operational and comprehensive maintenance shall be carried out through trained/qualified engineer/technicians in SCADA system/field. No contineous manning is required but the contractor shall ensure that his technical staff is available to attend to any breakdowns, periodic and regular maintenance. It shall be the responsibility of contractor to keep the system functional. Note : (i) Contractor shall attend the breackdown / repair maint within 02 hrs and make the system operational. Any further delay is liable to penalty of Rs. 10000/- per day or part thereof. (ii) This item shall be taken as 36% of total amount quoted for the job for payment purpose.Yearly breakdown payment against this item shall be made as per following schedule during the period of eight years. (a) After 1st year - 4% (b) After 2nd year - 4% (c) After 3rd year - 4% (d) After 4th year - 4% (e) After 5th year - 5% (f) After 6th year - 5% (g) After 7th year - 5% (h) After 8th year - 5% NOTE:- Yearly amount as above shall be paid in equal installments every month.
Design, Develop, Integrate and Commission SCADA System and its maintenance & operation and comprehensive maintenance for Water supply system complete all as specified and as directed in following phases and detailed specifications:-
PHASE-I (SCADA SYSTEM ITEM No 2.03)
PHASE-II (MAINTENANCE & OPERATION ITEM No 2.05)
Operation of SCADA system of Water Supply System during defect liability period of 2 years through trained/qualified engineer/technician in SCADA system/field without manning. Contractor shall be responsible for repair and maintenance of SCADA system including replacement of all defective parts as and when required. No contineous manning is required but the contractor shall ensure that his technical staff is available to attend to any breakdowns, periodic and regular maintenance. It shall be the responsibility of contractor to keep the system functional. Note :- (i) Cost for comprehensive maintenance including cost of parts required to be replaced will be coverved under defect liability period of two years. No extra payment will be made for the same. (ii) Contractor shall attend the breakdown and repair within 02 hrs and make the system operational. Any further delay is liable to penalty of Rs. 10000/- per day or part thereof. (iii) This item shall be taken as 4% of total amount quoted for the job for payment purpose. Payment against this item shall be made as per following schedule during the period of two years. (a) After 1st year - 2% (b) After 2nd year - 2%
PHASE-III (OPERATION AND COMPREHENSIVE MAINTENANCE ITEM No 2.07)
Operation and comprehensive maintenance of SCADA system of Water Supply System including cost of parts requiring replacement up-gradation of components & software, all the spares as well as periodic up gradation including monthly payment to telecom for 8 years post defect libility period of 02 years. The operational and comprehensive maintenance shall be carried out through trained/qualified engineer/technicians in SCADA system/field. No contineous manning is required but the contractor shall ensure that his technical staff is available to attend to any breakdowns, periodic and regular maintenance. It shall be the responsibility of contractor to keep the system functional. Note : (i) Contractor shall attend the breackdown / repair maint within 02 hrs and make the system operational. Any further delay is liable to penalty of Rs. 10000/- per day or part thereof. (ii) This item shall be taken as 36% of total amount quoted for the job for payment purpose.Yearly breakdown payment against this item shall be made as per following schedule during the period of eight years. (a) After 1st year - 4% (b) After 2nd year - 4% (c) After 3rd year - 4% (d) After 4th year - 4% (e) After 5th year - 5% (f) After 6th year - 5% (g) After 7th year - 5% (h) After 8th year - 5% NOTE:- Yearly amount as above shall be paid in equal installments every month.
CIMCON SOFTWARE INDIA PVT. LTD. (BID ID -3140324)
Indexel Engineering Pvt LTd (BID ID -3139589)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tenderdocument.pdf
Tender Documents • 1.64 MB
BOQ.xls
BOQ • 0.56 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .