| 1 | L1₹1.2 CrAccepted-AOC | ₹1.2 Cr | L1 | Accepted-AOC As directed by CWC, Contract Agreement is placed on the L1 Contractor, Santhosh Infrastructure, Chennai at their revised quoted Total amount of Rs. 1,24,55,500 /- for the subject work. |
| 2 | L2₹1.4 Cr+₹15.4 L (12.4%)Rejected-Finance NO 1 120 FIRST STREET SANIPOONDI VILLAGE TIRUVANNAMALAI TALUK DISTRICT TAMIL NADU 606 755 | TIRUVANNAMALAI | TIRUVANNAMALAI | TAMIL NADU | 606755 | ₹1.4 Cr+₹15.4 L (12.4%) | L2 | Rejected-Finance Being L2 Contractor. Not Accepted. |
| 3 | L3₹1.5 Cr+₹24.1 L (19.4%)Rejected-Finance | ₹1.5 Cr+₹24.1 L (19.4%) | L3 | Rejected-Finance Being L3 Contractor. Not Accepted. |
Tender Value
₹1.4 Cr
EMD Value
₹2.2 L
Closing Date
23 Feb 2024, 2:00 pmClosed
THE CGM / HVF
THE CGM, HVF, CEO, AVADI, CHENNAI 600 054
WIDENING OF THE APPROACH ROAD FOR THE TANK PARKING SHED AND SHOP FLOOR IN GA SHOP AT HVF, AVADI.
2024_AVNL_182671_1
HVF/TE/13025/CEO/2023-24/71
Open Tender
Civil Works
Works
365 days
HVF, AVADI
DETAILS ENCLOSED.
7 documents required · 7 mandatory
₹0
₹2.2 L
23 Apr 2024
25 Jan 2024
24 Feb 2024
25 Jan 2024
23 Feb 2024
25 Jan 2024
Amount
Demolition of reinforced cement concrete (unreinforced) structure of any description including cutting of reinforced steel rod to facilitate demolition
Demolition of brickwork or stone boulder masonary builtin cement mortar or cement lime mortar including quions,arches,pillars etc.
Earth work excavation in hard/ dense soil for foundation width and depth not exceeding 1.50m and getting out.
M & L Quarry dust in filling,spresding watering & consolidation etc.
M & L for Moorum/red bajri filling in floors or pavings, laid in layers n exc. 15 cm thick, spread, levelled and rammed including watering
M & L for Soling (or sub base) spread thickness in 150mm with broken boulders or quarried stone, inter stices filled, surface formed and rolled and consolidated to required gradient and camber
M & L for broken stone Hardcore of gauge n exc. 63 mm, deposited, spread and levelled in layers n exc. 15 cm thick.
Material and labour for cement concrete 1:2:4 Type B1 20mm graded aggregate in foundation filling and mass concrete.
M & L for PCC 1:1.5:3, A1 Type using 20mm graded aggregated in foundations , filling in mass concrete.
M & L for R.C.C Design Mix,M20 (20mm graded aggregate in foundations, including rafts, footings, column, beam, plinth beams, roof slab etc.,
Supply and fixing of mild steel reinforcement TMT bars 10mm dia and over including bending, cranking, hooking and tieing with mild steel wire not less than 0.90mm dia.
Supply and fixing of mild steel reinforcement TMT bars 6mm to 8mm dia and over including bending, cranking, hooking and tieing with mild steel wire not less than 0.90mm dia.
Material & Laying for Polythene film, black, 50micron laid in floors
Formwork to fair finish surface and faces of walls,retaining walls,abutments,flat,parapets and staircase railings and similar work including attached pillasters, buttresses,etc.; vertical or to batter .
Laying of stone sett road ( stones will be supplied by Factory at CVRDE test track ) including Intercarting the dismantled stones from the premises of CVRDE test track by arranging tipper lorries, tractor and bringing the dismantted stones inside the factory by making necessary gate passes ,IGP etc., and dumping the stones at the open area nearer to the worksite and stacking it neatly and properly . The stacked stones shall be neatly dressed on all sides by engaging skilled labours to remove the sticked plastering/concrete/ cement surfaces and the dressed stones shall be fully cleared/washed with water to remove all the dust etc. The dressing of stones shall ensure uniform size and shape. The remains of the dressed stones shall be removed from the site and dumped to a low lying area suitated at a distance of exceding 500 m and not exceding 1.50 km.The dresed stone shall be used for the laying of stone sett road and the stones shall be arranged in a Herringbone pattern to provide sufficient lock between each stone.The stones shall be bedded in cement motor 1:3 for 25mm thick and the Vertical joints and Horizontal joints shall be grouted using cement motar 1:2 with an admixture of metallic floor hardner 5% by weight of the cement and stuck flush. This rate is inclusive of all the above activites as whole.
Material and Labour for laying RMC of design mix cement concrete , M40 type (with steel fibre) using 20mm graded aggregated in foundation ,only flooring, including high tensile steel wire fibres of diameter not exceeding 0.456mm and length exceeding 50mm blended with ready mix concrete at plant at the rate of 7kg/cum (Ready Mix concrete are only accepatble)
Material and Labour for providing Vaccum dewatering method to remove excess water from the laid concrete and filler pad and suction mat shall be laid on the freshly laid concrete which will not allow cement paste to flow out, and the suction pump are then started immediately to remove the excess water. The suction time will be normally 20 to 30 minutes or as specified and as required and making the surface hard enough to enable to carry the floating operations using electrically driven mechanised troweller for top finishing. The top finishing shall be of a uniform true level surfaces free from all blisters ,dust etc and all as directed by EIC (including 50 micron polythene film at bottom off concrete if required for 200mm thick slab)
Supply & spreading of metallic floor hardner (3.50 kg per sq.m) to the surfaces of the fresh concrete after the dewatering procedure.
Supply and fixin of 110mm SWR PVC pipe single socketed in any length with rubber ring joints fixed in walls .
M & L for fixing of Rubber water sealer 200mm size fixed to wall concrete.
Removal of excavated debris/rocks exceeding 250m but not exceeding 500m and depositing where directed.
Returning / refilling of hard/dense soil including spreading, leveling, watering and well ramming in layers not exceeding 25cm.
M/s.MSK Construction
AMUTHA ENGINEERING AND CONSTRUCTION
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .