Loading…
Loading…
Tender Value
₹3.1 Cr
EMD Value
₹6.2 L
Closing Date
6 Jul 2026, 3:30 pm
Replacement of defective quad cable patch along with Emergency Control circuit, TSS/SP/SSP communication and cable joints in Daund - Wadi section of Solapur division in Central Railway.
SUR-N-T-2026-27-16
SUR-N-T-2026-27-16
Open
12 Months
Solapur, Maharashtra
₹0
₹6.2 L
11 Jun 2026
11 Jun 2026
22 Jun 2026
A-SOR Supply Schedule
B-SOR Execution Schedule
C-Supply and Execution of Non SOR items.
Item Breakup - A-SOR Supply Schedule
50.00 locks with detachable handle on both the doors. b)Half Case as per Drg No SK 783-1 & 2. with latest alteration. ( Inspection by RITES ) SOLAPUR DIVISION-S AND T/CENTRAL RLY
70.00 Drg.No.CR/S&T/SK-815 ( Inspection by Consignee )
300.00 class as per spec. No.IS 1239 PT. 1/2004 or latest with sockets and fittings. TATA/JINDAL/ZENITH BIRLA make. ( Inspection by Consignee )
600.00 coupler and 'O' ring fire resistant, anti rodent, in 6 meter length of size 120 mm outer dia as per RDSO/SPN/204/2011 Ver 1.1 with Amd.1 or latest. ( Inspection by Consignee )
189.00 150mm dia outer and 100 mm dia internal 1 mtr long matching to IS No.458/2003 amendment-1 with Rev.4. ( Inspection by RITES )
6.00 63534.00 Telecom duct of size 50/42 mm and accessories as per latest Specification TEC GR No. GR/TX/CDS-008/03March 11 with latest amendment" for OFC cable of size 24 fibre armoured in length of 1000 mtr/roll. Duct to be supplied from TEC approved sources. ( Inspection by Consignee )
3200.00 (HDPE) of 110 mm OuterDia, 10 mm Wall Thickness, along with one coupler for every 6 Meters as per specification No. IS 4984: 2016 with latest amendments and Material Grade:PE 100 ( Inspection by RITES )
4.00 and other accessories of make HCL, APW, Rittal, President or similar as per instructions of site engineer. c) 9U rack (wall mountable) ( Inspection by Consignee ) Total 7797828.00
Item Breakup - B-SOR Execution Schedule
70.00 foundation with contractors Anchor bolts, cement, ballast and other materials. The required scaffolding ferma etc for Casting of foundation will have to be brought by the contractor at his own cost. ii)Half Case as per Drg No SK-804
70.00 filling of location foundations and plastering. ii)Half Case SOLAPUR DIVISION-S AND T/CENTRAL RLY
70.00 per Drg.No.RE/S&T/SIG/Tender/SK726/85 including earth wire connected through GI wire 8 SWG supported on M.S. flat of size 6mm x 40 mm to earth electrode as per drg. No.CR/S&T/SK-815 for sigg. Equipment such as lever frames, apparatus case, signals, relay racks, block instruments, and etc. as per RE manual. The earth value should be less than 10 Ohms including the lead wire. The value should be measured in presence of Rly. supervisor. It should be documented and painted on earth enclosure made of concrete.( only earth electrode will be supplied by Railway). All other material required for provision of earthing will be brought by the contractor.
9600.00 route plan, 1.0 mt. deep and 300mm wide along side the track in normal soil/strata, conforming to distances as per cable route plan and refilling after cable laying. This work includes covering of cable laid to trench by loose soil for a layer of 50mm thickness after clearing of route, bushes e t c . It shall be ensured that top of the cables laid is at a depth of 0.8 m or more. If it is less, then the width and depth shall be suitably increased and accordingly proportionate payment shall be made. In case depth of trench is not achievable due to site conditions, proportionate payment will be made as per procedure. The work shall be done as per extant practice on C.Rly & the instruction of Railway engineer at site. Drg No SK 805
2400.00 route plan, 1.0 mt. deep and 300mm wide along side the track in hard soil, conforming to distances as per cable route plan and refilling after cable laying. This work includes covering of cable laid to trench by loose soil for a layer of 50mm thickness afer clearing of route, bushes etc. It shall be ensured that top of the cables laid is at a depth of 0.8 m or more. If it is less, then the width and depth shall be suitably increased and accordingly proportionate payment shall be made. In case depth of trench is not achievable due to site conditions, proportionate payment will be made as per procedure. The work shall be done as per extant practice on C.Rly & the instruction of Railway engineer at site. Drg No SK 805
36.00 (except concrete type) for trenching and excavation to depth of 300mmx300mm wide approx. and refilling after laying of RCC/GI/DWC pipe & to restore them to original condition. The work shall be done as per extant practice on C.Rly & the instruction of Railway engineer at site. Drg No SK 807
300.00 bridges etc. and concreting of ends with brick masonry at both ends as per the instruction of Rly engineer at site. SOLAPUR DIVISION-S AND T/CENTRAL RLY
120.00 flange/road level (for LC) and, 0.3 Mtr to 0.6 Mtrs wide and back filling after placing of DWC/RCC/GI pipe. (Placing of DWC/RCC/GI pipe coverd separately). The ballast disturbed be screened and dressed as required by Engineer-in-charge or his representatives and road tarred immediately. Drg No SK 806
600.00 RCC Half round pipes in trenches at places of track and road crossings, platform cutting etc.
50.00 various cores/sizes in trenches.
180.00 not feasible, cable shall be protected as under:- Preparation of cement mixture 1:3:6 with contractor's own materials and spreading cement concrete mixture layer of 100 mm thick over the already laid cables in the excavated trench."
of bridges/culverts/concrete drain/ mountain ridges etc. with suitable GI bend shall be provided where there is turning of pipe as per instructions of the site engineer. GI Clamps at every 2 m as shown in the drawing to be fixed. Suitable holes to be made in the pipe before laying as per instructions of the site engineer. 100 mm dia. Drg No SK 808
OF coming in the way of/route of cable trenching, signal/Location foundation/Track Crossing etc. These obstruction will be removed by contractor for ensuring proper execution of related works.
160.00 in the way of/route of cable trenching, signal/Location foundation/Track Crossing etc. These obstruction will be removed by contractor for ensuring proper execution of related works.
of through/derivation/ transformer /PIJF cable joint for underground jelly filled cable 6 quad/4 quad/20 pair 10 pair etc. PIJF cable as per the instruction of Rly engineer at site.
1200.00 2.0 Mtr depth along with laying of 120mm HDPE pipe for track crossing with minimum depth reckoned from bottom of the rail/Road crossing with minimum depth reckoned from ground level. The work shall be done as per extant practice & instructions of site engineer. Preparation of site for Horizontal Boring shall be carried out in presence of Railway Representative. HDPE will be supplied by Railway. Note:- Contractor shall provide all material required for boring and adequate nos. of labours for proper laying of cables into the bore. Cable shall be laid cautiously so that it should not get damage due to rough handling & pressure on cable. SOLAPUR DIVISION-S AND T/CENTRAL RLY
1600.00 2.0 Mtr depth along with laying of 120mm HDPE pipe for Other location with minimum depth reckoned from the ground level. The work shall be done as per extant practice & instructions of site engineer. Preparation of site for Horizontal Boring shall be carried out in presence of Railway Representative. HDPE will be supplied by Railway. Note:- Contractor shall provide all material required for boring and adequate nos. of labours for proper laying of cables into the bore. Cable shall be laid cautiously so that it should not get damage due to rough handling & pressure on cable.a) BORING upto the length of 150mtrs. Preparation of site for Horizontal Boring shall be carried out in presence of Railway Representative.
26000.00 approximate size (150/300 mm dia X 2 Meter length) inside the trench after laying of cable. Pipes shall be placed as per directives of engineer.
Road breaker/boulder or rock breaker with compressor & Jack Hammer for Railway work such as cutting & dismantling of road concrete/Brick pucca structure (RCC/Steel section) including contractors fuel, driver and all other charges completed as directed by Engineer in charge
70.00 paint over one coat of primer on the following after scrapping and cleaning of the surface wherever necessary with contractor own supply of paints. Wherever required contractor shall apply coating of epoxy paint also as per instructions of site- in-charge. Epoxy will be supplied by Railways. NOTE:- The paint and primer should be from M/s Asian paints Co. Ltd.,. The paints will be primer (IS 5660 of 1970) the Aluminium synthetic black enamel (IS 2932 of 1974) brilliant white and yellow Painting two coats of enamel paint over one coat of primer.(ii)Apparatus Cases Half size.
/ particulars, equipments names etc., legibly and neatly inside location boxes.(b)Half Case.
6.00 protective work as per direction of site engineer.
6.00 11607.00 duct and protective work, as per direction of site engineer. SOLAPUR DIVISION-S AND T/CENTRAL RLY
480.00 fiber/pigtail in LIU/IO box/terminal joint through fusion splicing for termination of OFC cables. The fibers terminated shall be tested and test report (hard copy and soft copy) shall be submitted to the Railways site in-charge for records. each fiber shall be properly marked with necessary ferrules/tags, as per following specification: i) The optical fibre cables shall be entered in to the rack through cable entry and using the cable guides. ii) The loosened ends of the fibres and pigtails shall be properly prepared for termination in to the already fixed LIU. iii) Each of the fibre shall be spliced with a pigtail by the method of fusion splicing using a Fusion Splicing Machine of standard reputed make. The splicing shall be done carefully by a skillful person. iv) The splices shall be carefully placed and well secured in the splice trays of the LIU. v) Each fiber / pigtail shall be properly marked with necessary ferrules/tags. vi) The extra length of the fibers / pigtails shall be coiled and placed and secured with cable ties. vii) The optical connectors of the pigtails shall be placed into the patch panel as per the numbering of fibers. viii) All of the terminated fibers shall be tested with OTDR and test report (Hard copy and Soft copy) shall be submitted to the Railways site In-charge for records." Total 12440580.00
Item Breakup - C-Supply and Execution of Non SOR items.
Supply of 6 fibre single mode armoured Metre OPTICAL FIBRE Cable as per ITU-TG 652D specification make D-Link or Digisol or AMP or Molex make. (Inspection by Consignee)
Supply of 12 port LIU, 19 inch rack Numbers mountable as per following specification: a) It should have 12SP type ports for termination of SM optical fibres.b) It should be rack mountable with 1U height. c)It should be equipped with front managed saddlefor jumper/patch cord management. d) It shouldhave 12 SC termination. e) It should be equippedwith adequate nos. of splicing trays to splice 12fibres. f) It should have proper rubber grommetfor cable protection and to minimize dust build up.g) It should be fully loaded with all the accessories for splicing and termination of fibres.h) It shall be of reputed make like D- Link or 3M orDigilink or Molex make. (Inspection by Consignee) SOLAPUR DIVISION-S AND T/CENTRAL RLY
Installation & commissioning of 12 port LIU Numbers withall accessories and shall be used for terminationsof optical fibers into the splice trays supplied withit, it shall be installed inside the 19 inch rackusing all required fixing/ installation material likenuts, bolts, screws and cable ties etc. as perrequirement. The splice trays shall be placed and secured into the LIU after splicing. The SCterminations shall be fixed and secured aftersplicing of the pigtails into the LIU. It shall beensured that the movement of the trays is easyand free of any obstructions.
Supply of optic fiber pigtails for termination Numbers ofOFC cables with following specification: a) It shallbe single mode SC/SC type with push pullmechanism or as per site requirement and fullycompliance with latest industry standard. b) Itshall have length of 2 Meters at least. c) It shallhave SC connector at one end and other shall beloose for splicing. d) It should be of reputed makeD-Link or 3M or Digilink or Molex. (Inspection by Consignee)
Supply of OFC patch cord with required Numbers connectors at both ends single mode Simplex 5Mtr. Make of 3M or Sterlite or Finolex or Raychem only. (Inspection by Consignee)
Supply of Media converters with one Fiber Pair port (SC connector) and four Ethernet ports, supporting port isolation and with built in AC Power supply. Model: FABIO 104L of make MRO-TEK or similar model of RAD, ANDA Telecom, ZYXEL or CTC only. (Inspection by Consignee)
Supply of 6 pin emergency socket box as Numbers per drawing no.SK/CSTE (C) 97/20. (Inspection by Consignee)
Supply of 6 pin emergency socket flat type Numbers to suit light weight 2W/4W portable control telephone as per RDSO specification No.IRS/TC/42/87 with latest amendment. (Inspection by Consignee)
Fabrication and supply of EC assembly Numbers complete with erection of fabricated assembly at location as per Telecom/RE manual, as indicated in the route chart & as directed by Engineer in charge this includes welding of GI pipe for fixing of EC box.
Fixing of EC socket complete with Numbers termination of derivation cable on strip inside the EC box duly mounted on good quality wooden box at SM building/cabin/gate lodge and wherever necessary as per instructions of site incharge of the work.
Supply of SPLIT DWC pipe conforming to Numbers 12000.00 RDSO/ SPN/204/2011 Ver-1.1 or latest RDSO Specification, Non-metallic, corrugated, multi walled, normal duty, pliable, without protection against chemical attack and Non Flame propagating in 2 meter length of size 200mm outer dia & 175 mm inner dia (Permitted tolerance in dia =+/- 2mm) (Two Half round pipe constituting one split pipe). (Inspection by RDSO) SOLAPUR DIVISION-S AND T/CENTRAL RLY
Placing of DWC/ Split DWC pipe in trench Metre and track/ road crossing protruding equally outside the rail/ road edge on either side.
Localization insulation/break fault the work involves excavation of the existing joint location, opening the existing joint and replacement with new normal / derivation thermohrinkable jointing kit. (This includes supply and installation of thermo shrinkable jointing kit for derivation/normal on 4/6 Quad Telecom cable including excavation of jointing pit size 1m x 1.5m x1.5m) transformers if required will supply by Railway (Unit : Per Joint)
Supply of Thermo shrink joint kit suitable Numbers for 6 quad cable for straight through/ derivation transformer as per RDSO specification No.IRS-TC-77/2012 (Rev.3.0) Amdt.3 or latest. From RDSO approved firms. (Inspection by RDSO)
Supply, Transporting and installation of Numbers concrete (RCC) route indicators at intervals of 50 meters as per technical specification. They should be standard RCC with letters on one side "CR" and the other side "S&T Cables" as per drawing SK 12/10 of RVNL SC. In case of Telecom quad cable joint locations it shall be painted with RED colour. (Inspection by Consignee)
Execution of S & T work related to Job Engineering /S&T block of Bridge work or cable shifting or others, for relocation/protection of S&T cable/asset as per Railway site engineer instruction.
Supply of Cross talk measurement meter as Numbers per IRS/TC:45/88 with latest amendment for measuring range 0 - 100dB with complete test kit and accessories. (Inspection by Consignee)
Supply specification similar to APLAB make Model 1072 or equivalent as per TEC specs. (Inspection by Consignee)
Supply of RFID marker locator with High Numbers Power 12W Transmitter for effective long distance locating, 4 Active Locating Frequencies (577Hz, 8kHz, 33kHz, 200KHZ), depth range up to 9 meter, Passive Power Frequency, Current and resistance measurement in both transmitter and receiver, Super Induction mode, with capability of Electronic Marker locating along with GPS feature (for both Passive and RFID) (Inspection by Consignee)
Supply of smart Electronic RFID cable Numbers marker with capability of saving the user specific data inside the marker memory chip, (Data storage up to 256 bits) later readable by locator during locating floating coil to keep detection circuit always horizontal for better detection). Make: 3M or similar. (Inspection by RITES)
Installation of smart electronic cable Route Numbers Marker for route, track and road crossing marking along the route of cable laying. Total 7333570.60
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Instructions_To_Tenderer_Quad_DD_WD.pdf Instructions to Tenderer
ATTACHMENT
Special_Conditions_Quad_DD_WD.pdf
ATTACHMENT
GCC with ACS
ATTACHMENT
Tender_form_Annexure-I.pdf
ATTACHMENT
Instructions_To_Tenderer_Quad_DD_WD.pdf
ATTACHMENT
GCC_April-2022_with_ACS_11_13032026.pdf
ATTACHMENT
Cable_cut_policy_CR_1st_Sept_23.pdf
ATTACHMENT
Download all tender documents and submit your bid