Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹52.1 LAdmitted-Finance 142 SECTOR 16 AVAS VIKAS COLONY FRONT OF RAILWAY LINE SIKANDRA AGRA AGRA UTTAR PRADESH 282007 | AGRA | UTTAR PRADESH | 282007 | L1 | Admitted-Finance | ||
| 2 | L2₹52.3 L+₹18,484.89 (0.35%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹52.7 L+₹55,454.67 (1.06%)Admitted-Finance 785 SNEH MARRIAGE HALL KE SAMNE BASHARATPUR SHAHPUR GORAKHPUR | L3 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹1.1 L
Closing Date
10 Aug 2026, 5:00 pmClosed
EE
Nagar Nigam Gorakhpur
Construction work of sample under Tarang Over Bridge
2026_DOLBU_1174756_1
NNG
Open Tender
Civil Works
Percentage
Gorakhpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
Nagar Nigam Gorakhpur
₹1.1 L
1 Oct 2026
5 Aug 2026
11 Aug 2026
5 Aug 2026
10 Aug 2026
5 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1A | |||||
| 1.01 | Earth work in excavation in foul position soil lead 50mt & lift 1.5 mt. incl. lab. T&P etc all 251 complete | 268 | cum | 120 | ₹32,160 |
| 1.02 | Local sand filling. | 14.7 | cum | 850 | ₹12,495 |
| 1.03 | P/L of base concrete in 1:4:8 with cement, L- Sand and 40mm S/B including mat. Lab. T&P,etc all complete. | 16.03 | cum | 5,435 | ₹87,133.92 |
| 1.04 | RCC Work with cement concrete (1:1.5:3) including all complete of work. | 86.58 | cum | 9,082 | ₹7,86,319.56 |
| 1.05 | M.S or iron work in renforcement cutting bending, binding and placeing incl.etc.all. | 135.94 | qtl | 7,690 | ₹10,45,378.6 |
| 1.06 | M 150 class brick work in 1:4 with cement & approved Course Sand mortar including supply all material and S.I.N. labor etc. | 8.42 | cum | 5,817 | ₹48,967.51 |
| 1.07 | 12mm thick coment plaster in 1:4 cement mortar with 1 cement and 4 course sand 584 Including etc. all complete of work. | 79.2 | sqm | 159 | ₹12,592.8 |
| 1.08 | Laying CC in 1:2:4 for top of drain work. with cement, Course Sand20 mm & Stone Grit including supply of all material and labour etc. | 0.16 | cum | 8,186 | ₹1,317.95 |
| 1.09 | Cartage of earth found at site. | 214.4 | cum | 167.7 | ₹35,954.88 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.30 MB
d.pdf
Tender Documents • 2.29 MB
BOQ_2207403.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .