| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹76.8 LAccepted-AOC MALLAGUNDA | L1 | Accepted-AOC Admit | |
| 2 | L2₹78.3 L+₹1.5 L (1.99%)Rejected-Finance 3 210 PANDARAKADU KONASAMUTHIRAM POST EDAPPADI TALUK SALEM DISTRICT TAMIL NADU | EDAPPADI | SALEM | TAMIL NADU | L2 | Rejected-Finance L2 bid rank | |
| 3 | Rejected-Technical | - | Rejected-Technical Withdraw letter submitted. | |
| 4 | Not Admitted-Finance 2 433 3 PATHAR ROAD MARUKKALAMPATTI PATHAR EAST NAMAKKAL 637212 | NAMAKKAL | NAMAKKAL | TAMIL NADU | 637212 | - | Not Admitted-Finance Others-Withdrawn letter submitted | |
| 5 | Not Admitted-Finance | - | Not Admitted-Finance Others-Withdrawn letter submitted |
Tender Value
Refer Docs
EMD Value
₹80,200
Closing Date
10 Jan 2025, 3:00 pmClosed
Joint Director/Project Director
1st floor, DRDA, Collectorate campus,Tiruvarur
Strengthening to the School to Radhanarasimapuram Link Road km 1.100
2024_RDTN_514445_1
DIPR/5603/Tender/2024 dt 26.12.2024 pack-14
Open Tender
Civil Works - Roads
Item Rate
180 days
Mannargudi block
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹80,200
1st floor, DRDA, Collectorate campus,Tiruvarur
25 Apr 2025
27 Dec 2024
10 Jan 2025
27 Dec 2024
10 Jan 2025
27 Dec 2024
3 Jan 2025
Amount
Strengthening to the School toRadhanarasimapuram Link Road Km 0/0 - 1/100
Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 2
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all
BITUMINOUS CONCRETE 25MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
Provision of Rumble Strips with premix Bituminous carpet Provision of 15 nos. rumble strips covered with premix bituminous carpet, 15-20mm high at centre, 250mm wide placed at 1m centre-to-centre approved locations to control speed, marked with while str
Road Marking With Hot Applied Thermoplastic Compound With reflectorising Glass Beads on Bituminous Surface:- Providing and laying of hot applied thermoplastic compound 2.50mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of
Proviosion for KM stone
Provision for HM stone
Provision for Name board Citizen information Board
Provision for sign Boards
RCC Slab Culvert 1.073 (1.5m span)
Earth work excavation in Hard stiff clay soil except hard rock requiring bleasting such as soft clay mixed sand as per SS 20B
Cement concrete 1 : 4: 8mix using 40mm HBG metal for foundation including watering , centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.for levelling course
Cement Concrete.1:3:6 using 40mm ISS HBG Mertal including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete.for foundation
Cement Concrete.1:2:4 using 20mm ISS HBG Mertal including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete.for Superstructure
Cement Concrete.1:2:4 using 20mm ISS HBG Mertal including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete.for Bed blocks
Reinforced Cement Concrete.1:1.5:3 using 20mm ISS HBG Mertal including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete.for Deck Slab
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle of size 25 x 25 x 3mm for boarding laid over silver oak joists(Country wood) of size 10 x 6.5cm spaced @ about 90cm c/c and supported by casurina props of 10 - 13cm dia. spaced @ 75cm c/c etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.for the following items.(RCC floor slab, roof slab, Rectangular/ square, Tee/ Ell beams, Lintels, staircase waist slabs, Landing slabs, Landing beam, Portico beam etc., ).
Below Sill level
Above Sill level
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS
Providing and fixing 20mm Bitumen felt for expansion joint Between Dirtwall &Deck slab
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
RCC Slab Culvert 1.095 (5.0m span)
Earth work excavation in Hard stiff clay soil except hard rock requiring bleasting such as soft clay mixed sand as per SS 20B
Supply and Filling foundation and basement with filling sand in layers not more than15cm. Thick well ramed watered and compacted complete complying with stanard specification.
Cement concrete 1 : 4: 8mix using 40mm HBG metal for foundation including watering , centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.for levelling course
Cement Concrete.1:3:6 using 40mm ISS HBG Mertal including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete.for foundation
Cement Concrete.1:2:4 using 20mm ISS HBG Mertal including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete.for Superstructure
Reinforced Cement Concrete.1:1.5:3 using 20mm ISS HBG Mertal including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete.for Deck Slab
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle of size 25 x 25 x 3mm for boarding laid over silver oak joists(Country wood) of size 10 x 6.5cm spaced @ about 90cm c/c and supported by casurina props of 10 - 13cm dia. spaced @ 75cm c/c etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.for the following items.(RCC floor slab, roof slab, Rectangular/ square, Tee/ Ell beams, Lintels, staircase waist slabs, Landing slabs, Landing beam, Portico beam etc., ).
Below Sill level
Above Sill level
Reinforced Cement Concrete.1:1.5:3 using 20mm ISS HBG Mertal including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete.for Deck Slab
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS
Providing and fixing 20mm Bitumen felt for expansion joint Between Dirtwall &Deck slab
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
Towards the charges for routline maintenance of the road work executed under NABARD including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
SR CONSTRUCTION (BID ID -1229859)
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .