| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.7 LAccepted-AOC 3 6E PARK JUNCTION THIRUVARAMBU | ₹8.7 L | L1 | Accepted-AOC L1 Tenderer |
| Sl No | Description | Qty | Unit | NISSI ELECTRICALS L1 |
|---|---|---|---|---|
| 1.01 | Loading&unloading of 9m PSC pole | 53 | Each | 31,800 ₹37,524 |
| 2.01 | Excavation of 9m pole pits(1.25m*0.6m*1.83m) in Normal Ground | 53 | per pit | 39,750 ₹46,905 |
| 3.01 | Erection of 9m PSC pole in Normal Ground | 53 | per pole | 42,400 ₹50,032 |
| 4.01 | Transportation of 9m PSC pole from road side to pole pit upto 2KM | 53 | Each Pole | 42,400 ₹50,032 |
| 5.01 | Loading&unloading of 8m PSC pole | 6 | Each | 2,400 ₹2,832 |
| 6.01 | Excavation of 8m pole pits(1.25m*0.5m*1.5m) in Normal Ground | 6 | per pit | 3,000 ₹3,540 |
| 7.01 | Erection of 8m PSC pole in Normal Ground | 6 | per pole | 3,300 ₹3,894 |
| 8.01 | Transportation of 8m PSC pole from road side to pole pit upto 2KM | 6 | Each Pole | 3,600 ₹4,248 |
| 9.01 | Set right of HT/LT leaning poles | 1 | Each | 450 ₹531 |
| 10.01 | Erection of Guarding X arm | 3 | Each | 750 ₹885 |
Tender Value
Refer Docs
EMD Value
₹8,745
Closing Date
19 Feb 2026, 2:00 pmClosed
Superintending Engineer
TNPDCL/Nagercoil
Works Contract for the execution of various works under Thuckalay Division
2026_EB_651538_1
KKEDC/ETW-81/2025-26 Dated 02.02.2026
Open Tender
Electrical Works
90 days
Office of the Superintending Engineer
As specified in tender
3 documents required · 3 mandatory
₹0
₹8,745
Yes
27 Apr 2026
5 Feb 2026
20 Feb 2026
5 Feb 2026
19 Feb 2026
5 Feb 2026
5 Feb 2026 - 18 Feb 2026
Loading&unloading of 9m PSC pole
Excavation of 9m pole pits(1.25m*0.6m*1.83m) in Normal Ground
Erection of 9m PSC pole in Normal Ground
Transportation of 9m PSC pole from road side to pole pit upto 2KM
Loading&unloading of 8m PSC pole
Excavation of 8m pole pits(1.25m*0.5m*1.5m) in Normal Ground
Erection of 8m PSC pole in Normal Ground
Transportation of 8m PSC pole from road side to pole pit upto 2KM
Set right of HT/LT leaning poles
Erection of Guarding X arm
Erection of V X arm 4.5 feet
Fixing of HT/LT TI fittings
Erection of Tapping channel X arm
Fixing of HT pin insulator
Fixing of HT strain disc 11KV
Fixing of LT S phase cross arm
Fixing of LT 3 phase cross arm
Fixing of LT pin insulator
Fixing of shackle
Fixing of aluminium knob
Excavation of stay pit (1.00m*0.5m*1.5m) in normal ground
Erection of stay set complete in normal ground
Paving and stringing of LT ACSR 7/2.59 conductor in pin point
Paving and stringing of LT ACSR 7/2.59 conductor in cut point
Paving and stringing of LT ACSR 7/3.35 conductor in pin point
Paving and stringing of LT ACSR 7/3.35 conductor in cut point
Paving and stringing of HT ACSR 7/4.09 conductors equivalent conductor in pin point
Paving and stringing of HT ACSR 7/4.09 conductors equivalent conductor in cut point
Coil earthing per pole & pole earthing
Concreting of poles as per board standards(2'*2'*5'). The material such as sand jelly etc have to be supplied by the contractor cement supplied by the contractor (Cement concrete mix 1:4:8 using 40mm hard broken stone including cost of labour charges for placing transporting of sand jelly from box and water curing for 14 days etc complete)
Coping of pole(0.6m*0.6m*0.35m)
Loading&unloading of line materials
Erection of additional support for single pole DT including painting
Erection of feeder cable with open type fuse unit per feeder and for each addl feeder
Bus bar arrangement with open type single pole and double pole
Erection of Distribution Transformer upto 200 KVA
Loading&unloading of Distribution Transformer below 250 KVA
Transportation of line materials from Section Office to work spot up to 20 KM
Transporting of Charges of DT/Line materials using private vehicle upto 20KM (up and down)
Painting of DT structure materials(Double coat) including cost of aluminium paint
Painting structure poles color paint with single pole structure materials with aluminium paint (by contractor)
Excavation of 4nos earth pits
Excavation of earth wire trenches and paving of earth wire, Erection of 4nos earth pipe and giving earth connection, Earthing of all metal parts, LAS etc including neutral connection
Fixing of Danger Board(including clamp and Board)
Hiring of Crane
Fixing of top channel
Fixing of cross bracing
Erection of AB switch
Erection of Bed channel
Erection of Bed Angle
Erection of H.G. Fuse
HT-LAS fixing
LT-LAS fixing
Single pole transformer Bed Structure
Street light Switching point arrangement with wire and switch including B type MS box with painting (supplied by contractor)
Providing Jumbering at Cut point
Drilling/less than 23mm hole per hole/slatted hole
Ordinary tree clearance
Erection of Single phase Service connection
Erection of Three phase Service connection
Dismantling of Single phase Service connection
Dismantling of Three phase Service connection
Dismantling & refixing of V X arm 4.5 feet
Dismantling & refixing of TI fittings
Dismantling & refixing of HT pin insulator
Dismantling & refixing of HT Disc
Dismantling & refixing of tapping cross arm 4.5 feet
Dismantling & refixing of LT S phase cross arm
Dismantling & refixing of LT 3 phase cross arm
Dismantling & refixing of LT pin insulator
Dismantling & refixing of shackle
Dismantling & refixing of aluminium knob
Dismantling & Restringing of LT ACSR 7/2.59 conductors in pin point
Dismantling & Restringing of LT ACSR 7/2.59 conductors in cut point
Dismantling& Restringing of conductors of LT ACSR 7/3.35 conductors in pin point
Dismantling& Restringing of conductors of LT ACSR 7/3.35 conductors in cut point
Dismantling and Reerection of feeder cable with open type fuse unit per feeder and for each addl feeder
Dismantling and Reerection Bus bar arrangement with open type single pole and double pole
Dismantling and Reerection of Distribution Transformer upto 200 KVA
Dismantling&Refixing of top channel
Dismantling&Refixing of cross bracing
Dismantling&Refixing of AB switch
Dismantling&Refixing of Bed channel
Dismantling&Refixing of Bed Angle
Dismantling&Refixing of H.G. Fuse
Dismantling&Refixing HT-LAS
Dismantling&Refixing LT-LAS
Dismantling&Refixing Single pole transformer Bed Structure
Dismantling&reexcavation of earth wire trenches and paving of earth wire, Erection of 4nos earth pipe and giving earth connection, Earthing of all metal parts, LAS etc including neutral connection
Dismantling&Reerection of LED lamp fittings
Dismantling & refixing of Street light Switching point arrangement
Dismantling of LT S phase cross arm
Dismantling of LT 3 phase cross arm
Dismantling of aluminium knob
Dismantling of LT pin insulator
Dismantling of stay set complete with fixing up stay wire Eye, Bow, Guy shackle, Binding etc
Dismantling of 9mtr PSC pole
Dismantling of 8mtr &7.5 mtr RCC,REC, PSC &metal pole including the closing of the pit
Dismantling of conductors of ACSR 7/2.59 Conductor in cut point
Dismantling of conductors of ACSR 7/2.59 Conductor in pin point
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.21 MB
etw81spec.pdf
Tender Documents • 1.29 MB
BOQ_781293.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid