| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.6 CrAccepted-AOC 43 TRIDEEP BUNGLOW MIDDLE CLASS HSG SOC NEXT TO ARYAN SCHOOL GROUND PALGHAR MAHARASHTRA | PALGHAR | PALGHAR | MAHARASHTRA | 401404 | ₹17.6 Cr | L1 | Accepted-AOC Work order awarded to L1 bidder i.e. M/s. Dipak S. Pimple Engineers and Contractors |
| 2 | Rejected-Technical | - | - | Rejected-Technical The bidder has not submitted the shortfall document as per clause no.1.3.5.1, 1.3.2, 1.3.6, 2.3, 2.5.1, 12.1_Sr.No.13_ of PQC and clause 38.0 _Part-2 of NIT_ asked vide letter No. 824 dtd.24.09.2025, hence Bidder is Technically Disqualified. |
| Sl No | Description | Qty | Unit | DIPAK S PIMPLE ENGINEERS AND CONTRACTORS L1 |
|---|---|---|---|---|
| 1.00Excavation, soling | ||||
| 1.01 | Earth work excavation by mechanical means (Hydraulic excavator) / manual means in all types of soil other than soft and hard rock, dressing the sides of foundation, ramming of bottom etc. including shoring and dewatering (if necessary) and refilling with selected excavated earth in layers of not more than 500 mm thick, each layer well rammed and consolidated including disposing the surplus earth within a distance of 200 m and lift upto 1.5 m, all as per specifications including clearing Jungle, uprooting of vegetation, grass, etc. complete and as directed by the Engineer-in-charge. | 6,260 | Cu.m | 107 ₹6,69,820 Lowest |
| 1.02 | Earth work excavation by mechanical means (Hydraulic excavator) / manual means in foundation, in Soft Rock including shoring, dewatering if necessary, dressing the sides, ramming the bottom, refilling the sides etc. with available selected excavated earth in layers of not exceeding 500 mm in depth, each layer well rammed and consolidated disposal of surplus excavated material within a lead of 200 m and lift upto 1.5 m, complete as per specifications and as directed by the Engineer-in-charge. | 3,960 | Cu.m | 260 ₹10,29,600 Lowest |
| 1.03 | Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials for all soils other than hard rock | 6,130 | Cu.m | 30 ₹1,83,900 Lowest |
| 1.04 | Lead charges for 1st 1 KM or part thereof, by mechanical transport including loading unloading, stacking / levelling etc. for all soils other than hard rock | 3,130 | Cu.m | 65 ₹2,03,450 Lowest |
| 1.05 | Murum filling under floors of specified thickness in layers of not more than 150 mm thickness including supplying required materials and consolidation etc. complete (Murrum to be brought by contarctor)
Note : a) The contractor’s quoted rate shall include the royalty as per the prevailing Government rates. Any increase in prevailing rate of Royalty shall be borne by the Contractor at no extra cost to the Owner, b) Only compacted volume will be measured and paid. | 1,728 | Cu.m | 500 ₹8,64,000 Lowest |
| 1.06 | Supplying, stacking and laying of 230 mm thick rubble soling stones With outside material as under floor base including packing with smaller stone and compacting, ramming including spreading and consolidation of blinding material, moorum etc. complete all as per specifications and as directed by the Engineer-in-charge | 2,690 | Sqm | 560 ₹15,06,400 Lowest |
| 2.00RCC Works | ||||
| 2.01 | Providing Reinforcement Steel for reinforced cement concrete at all levels including supplying, preparation of bar bending schedules, cutting, bending, transporting, fixing, tieing in position with binding wire, all labour charges, cost of cover blocks in specified grade of concrete etc. complete as per specifications and drawings. Using materials of SAIL , RINL (Vizag Steel) and TATA only using virgin materials. | 615 | MT | 87,000 ₹5,35,05,000 Lowest |
| 2.02 | Supplying, fabricating, erecting and fixing in position formwork for all concrete structures in substructure including foundation, plinth beam, grade slab, columns, pedestal, raft, etc. at all levels below FFL, including, centering and shuttering to correct line and levels including strutting, propping, staging , supports etc, with necessary bracings in all axes to give a stable assembly with provision for making the joints in the shuttering fully leak proof and with provision for any other fixture , including staging, access and working platforms etc. all complete as specified and directed including and removing the aforesaid assembly after the concrete attains the sufficient strength to self-support itself without cracking and distortion all as per specification, including all materials and labour complete in all respects at all lifts / level / depths in substructure. (The measurement for the formwork will be the actual area of forms in contact with concrete surfaces.) | 3,370 | Sqm | 610 ₹20,55,700 Lowest |
Tender Value
₹19.0 Cr
EMD Value
₹22.7 L
Closing Date
11 Aug 2025, 5:00 pmClosed
Station Director, TAPS-3and4
NPCIL, TMS, Tarapur, PO_TAPP, Boisar _WR_, Dist. Palghar, Maharashtra_401 504
Construction of RCA shop for EMCCR at TAPS 3and4.
2025_NPCIL_241305_1
TMS / CMM-WORKS / CIVIL-3and4 / 2025 / 2559
Open Tender
Civil Works
Item Rate
365 days
Works
As per NIT
4 documents required · 4 mandatory
₹0
₹22.7 L
25 Mar 2026
16 Jul 2025
13 Aug 2025
16 Jul 2025
11 Aug 2025
2 Aug 2025
16 Jul 2025 - 28 Jul 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Excavation, soling | |||||
| 1.01 | Earth work excavation by mechanical means (Hydraulic excavator) / manual means in all types of soil other than soft and hard rock, dressing the sides of foundation, ramming of bottom etc. including shoring and dewatering (if necessary) and refilling with selected excavated earth in layers of not more than 500 mm thick, each layer well rammed and consolidated including disposing the surplus earth within a distance of 200 m and lift upto 1.5 m, all as per specifications including clearing Jungle, uprooting of vegetation, grass, etc. complete and as directed by the Engineer-in-charge. | 6,260 | Cu.m | - | - |
| 1.02 | Earth work excavation by mechanical means (Hydraulic excavator) / manual means in foundation, in Soft Rock including shoring, dewatering if necessary, dressing the sides, ramming the bottom, refilling the sides etc. with available selected excavated earth in layers of not exceeding 500 mm in depth, each layer well rammed and consolidated disposal of surplus excavated material within a lead of 200 m and lift upto 1.5 m, complete as per specifications and as directed by the Engineer-in-charge. | 3,960 | Cu.m | - | - |
| 1.03 | Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials for all soils other than hard rock | 6,130 | Cu.m | - | - |
| 1.04 | Lead charges for 1st 1 KM or part thereof, by mechanical transport including loading unloading, stacking / levelling etc. for all soils other than hard rock | 3,130 | Cu.m | - | - |
| 1.05 | Murum filling under floors of specified thickness in layers of not more than 150 mm thickness including supplying required materials and consolidation etc. complete (Murrum to be brought by contarctor)
Note : a) The contractor’s quoted rate shall include the royalty as per the prevailing Government rates. Any increase in prevailing rate of Royalty shall be borne by the Contractor at no extra cost to the Owner, b) Only compacted volume will be measured and paid. | 1,728 | Cu.m | - | - |
| 1.06 | Supplying, stacking and laying of 230 mm thick rubble soling stones With outside material as under floor base including packing with smaller stone and compacting, ramming including spreading and consolidation of blinding material, moorum etc. complete all as per specifications and as directed by the Engineer-in-charge | 2,690 | Sqm | - | - |
| 2RCC Works | |||||
| 2.01 | Providing Reinforcement Steel for reinforced cement concrete at all levels including supplying, preparation of bar bending schedules, cutting, bending, transporting, fixing, tieing in position with binding wire, all labour charges, cost of cover blocks in specified grade of concrete etc. complete as per specifications and drawings. Using materials of SAIL , RINL (Vizag Steel) and TATA only using virgin materials. | 615 | MT | - | - |
| 2.02 | Supplying, fabricating, erecting and fixing in position formwork for all concrete structures in substructure including foundation, plinth beam, grade slab, columns, pedestal, raft, etc. at all levels below FFL, including, centering and shuttering to correct line and levels including strutting, propping, staging , supports etc, with necessary bracings in all axes to give a stable assembly with provision for making the joints in the shuttering fully leak proof and with provision for any other fixture , including staging, access and working platforms etc. all complete as specified and directed including and removing the aforesaid assembly after the concrete attains the sufficient strength to self-support itself without cracking and distortion all as per specification, including all materials and labour complete in all respects at all lifts / level / depths in substructure. (The measurement for the formwork will be the actual area of forms in contact with concrete surfaces.) | 3,370 | Sqm | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ_275147.xls
BOQ • 0.41 MB
175804439.pdf
Tender Documents • 2.66 MB
175804440.pdf
Tender Documents • 1.32 MB
175804441.pdf
Tender Documents • 0.23 MB
175804442.pdf
Tender Documents • 8.31 MB
175804444.html
Tender Documents • 0.06 MB
176266080.pdf
Tender Documents • 0.28 MB
PQSheet.rar
Tender Documents • 0.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].