| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹57,885.64Admitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹57,938.72+₹53.08 (0.09%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹95,000+₹37,114.36 (64.1%)Admitted-Finance | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SAFDAR HUSAIN CONTRACTOR L3 | M/S ABID CONTRACTOR L1 | M/S MOHAMMAD ABBAS L2 |
|---|---|---|---|---|---|---|
| 1.00Dismantling of HT/LT connection and removal of damaged distribution transformer from double pole/plinth and carriage of damaged transformer from site to ESC/sub center/workshop including loading and unloading at both ends :- | ||||||
| 1.01 | 10 KVA T/F | 1 | Nos | 2,500 ₹2,500 | 1,680.28 ₹1,680.28 Lowest | 1,681.82 ₹1,681.82 |
| 1.02 | 16 KVA T/F | 1 | Nos | 3,000 ₹3,000 | 1,800.3 ₹1,800.3 Lowest | 1,801.95 ₹1,801.95 |
| 1.03 | 25 KVA T/F | 1 | Nos | 3,500 ₹3,500 | 2,100.35 ₹2,100.35 Lowest | 2,102.28 ₹2,102.28 |
| 1.04 | 63 KVA T/F | 1 | Nos | 4,000 ₹4,000 | 2,184.36 ₹2,184.36 Lowest | 2,186.37 ₹2,186.37 |
| 1.05 | 100 KVA T/F | 1 | Nos | 4,500 ₹4,500 | 2,496.42 ₹2,496.42 Lowest | 2,498.7 ₹2,498.7 |
| 1.06 | 160 KVA T/F | 1 | Nos | 5,000 ₹5,000 | 3,000.5 ₹3,000.5 Lowest | 3,003.25 ₹3,003.25 |
| 1.07 | 250 KVA T/F | 1 | Nos | 5,500 ₹5,500 | 3,276.55 ₹3,276.55 Lowest | 3,279.55 ₹3,279.55 |
| 1.08 | 400 KVA T/F | 1 | Nos | 6,000 ₹6,000 | 3,744.62 ₹3,744.62 Lowest | 3,748.06 ₹3,748.06 |
| 1.09 | 630 KVA T/F | 1 | Nos | 6,500 ₹6,500 | 4,134.69 ₹4,134.69 Lowest | 4,138.48 ₹4,138.48 |
Tender Value
₹2 L
EMD Value
₹2,000
Closing Date
29 Aug 2025, 12:00 pmClosed
SUPERINTENDING ENGINEER
OFFICE OF THE SE EUDC NUMAISH CAMP MZN
Work of replacement of damaged transformers in the area of Electricity Urban Distribution Division-Civil Line, Muzaffarnagar
2025_PVVNL_1063089_1
21/EUDC MZN/2025-26
Open Tender
Electrical Works
Lump-sum
180 days
IN THE AREA OF EUDD-CIVIL LINE MUZAFFARNAGAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
SE EUDC MZN
₹2,000
1 Sept 2025
7 Aug 2025
29 Aug 2025
7 Aug 2025
29 Aug 2025
7 Aug 2025
Amount
Dismantling of HT/LT connection and removal of damaged distribution transformer from double pole/plinth and carriage of damaged transformer from site to ESC/sub center/workshop including loading and unloading at both ends :-
10 KVA T/F
16 KVA T/F
25 KVA T/F
63 KVA T/F
100 KVA T/F
160 KVA T/F
250 KVA T/F
400 KVA T/F
630 KVA T/F
1000 KVA T/F
Carriage of new/repaired distribution power transforer from ESC/Center/Sub Center/Workshop to site including loading and unloading at both ends. dragging of transformer from road site to duble pole/plinth and making HT/LT connections with proper jumphearing to restore the supply of the concerning areas :-
10 KVA T/F
16 KVA T/F
25 KVA T/F
63 KVA T/F
100 KVA T/F
160 KVA T/F
250 KVA T/F
400 KVA T/F
630 KVA T/F
1000 KVA T/F
M/S MOHAMMAD ABBAS (BID ID -5453620)
SAFDAR HUSAIN CONTRACTOR (BID ID -5506941)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .