Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.8 LAdmitted-Finance | -31.10% | ₹2.8 L | L1 | Admitted-Finance |
| 2 | L2₹3.1 LAdmitted-Finance N A | -25.21% | ₹3.1 L | L2 | Admitted-Finance |
| 3 | L3₹3.7 LAdmitted-Finance V P O GANVI TEH RAMPUR DISTT SHIMLA | GANVI | SHIMLA | HIMACHAL PRADESH | -10.00% | ₹3.7 L | L3 | Admitted-Finance |
| 4 | L4₹3.9 LAdmitted-Finance VILL KIYAR PO JEORI TEHSIL RAMPUR DISTT SHIMLA | SHIMLA | HIMACHAL PRADESH | 171001 | -5.00% | ₹3.9 L | L4 | Admitted-Finance |
Tender Value
₹4.8 L
EMD Value
₹4,839
Closing Date
15 Apr 2026, 9:00 amClosed
Resident Engineer
Resident Engineer, GPHD, Jeori
Removal of unwanted bushes, grass from penstock area, 22kV yard, residential/non-residential building forebay drain valve channel. Mtc of water supply line. Cleaning of side drains along penstock, residential/non-residential building power house c
2026_HPSEB_133740_1
HPSEBL/GPHD/DB-9/2026-27-27
Open Tender
Civil Works
319 days
Nogli
Please refer Tender documents.
6 documents required · 6 mandatory
₹590
₹4,839
17 Apr 2026
9 Apr 2026
17 Apr 2026
9 Apr 2026
15 Apr 2026
9 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1Work Details | ||||||
| 1.01 | Removal of un-wanted bushes, grass from 22KV switch yard, penstock area, power house complex Area residential/non-residential complex Area , spillway Area, forebay drains channel Area I/C . Cleaning of Forebay drain, Penstock drain, residential, non/residential complex drains, Mtc of water supply line from forebay to residential/Non residential complex of Nogli Power-House complete in all respects as per the requirement and direction of EIC for the period 15.04.2026 to 28.02.2027 (i.e.319 days)
Providing one no. Beldar and 01 no. Helper for this work for the period mentioned above.
Note: - 1. Work will be suspended immediately if services are not found satisfactory or HPSEBL provides its own man power for the purpose.
2. The contractor will be responsible for any fatal/non-fatal accident during the working hours.
2. The contractor will be responsible for any fatal/non-fatal accident during the working hours. | - | Job | - | - | item2 |
stage.html
html • 0.03 MB
techsummary_197793.pdf
BOQ Comparative Chart
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
BOQ_197793.xls
BOQ • 0.34 MB
27_1.pdf
Tender Documents • 0.76 MB
Download all tender documents and submit your bid