Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.2 CrAccepted-Finance | ₹2.2 Cr | 1 | Accepted-Finance Accept |
| 2 | 2₹2.3 Cr+₹1.5 L (0.65%)Accepted-Finance | ₹2.3 Cr+₹1.5 L (0.65%) | 2 | Accepted-Finance Accept |
| 3 | 3₹2.3 Cr+₹3.3 L (1.48%)Accepted-Finance | ₹2.3 Cr+₹3.3 L (1.48%) | 3 | Accepted-Finance Accept |
| 4 | Rejected-Technical | - | - | Rejected-Technical Reject |
Tender Value
₹2.2 Cr
EMD Value
₹4.4 L
Closing Date
25 Apr 2022, 11:00 amClosed
Deputy Conservator of Forest, UT, Chandigarh
Forest and Wildlife Department, 2nd Floor, Paryavaran Bhawan, Sector 19B, Chandigarh
Maintenance work, plantation, vigilant duty etc
2022_CHD_65327_1
FOR/2022/227/04.04.2022
Open Tender
Composite Works
Item Rate
365 days
Chandigarh
As per tender document
7 documents required · 7 mandatory
₹0
₹4.4 L
17 May 2022
4 Apr 2022
25 Apr 2022
4 Apr 2022
25 Apr 2022
4 Apr 2022
4 Apr 2022 - 25 Apr 2022
Amount
Item with Detailed Specifications
Maintenance of old plantation of last two year in Hallomajra Beat, Nepli Range during 2022-2023.
Plantation in blank patches in Hallomajra beat, Nepli Range, During 2022-2023.
5th Year maintenance of Fruit bearing plants to create habitat for wildlife near village Makhanmajra in Hallomajra Beat, Nepli Range during 2022-2023.
Transplantation of plants from small P.bags to bigger one for raising tall plants at Hallomajra Nursery in Hallomajra Beat, Nepli Range during 2022-2023.
Raising and maintenance of medicinal plants nursery inHallomajra Beat, Nepli range during 2021-2022.
Raising and maintenance of Hallomajra Forest Nursery in Hallomajra Beat, Nepli range during 2022-2023.
Suppressing of lantana in Hallomajra beat, Nepli Range during 2022-2023.
Vigilant duty in fragmented forest area in Hallomajra beat, Nepli Range during 2022-2023.
Engage mazdoor for picking of polythene & other waste material along the boundary fencing in Hallomajra beat, Hallomajrablock ,Nepli Range, during 2022-2023.
Vigilant duty during night time in fragmented forest area in Hallomajra beat, Nepli Range during 2022-2023.
Removal of weeds like parthenium & other spcs. in Hallomajra beat, Nepli Range during 2022-23.
Labour engaged for free distribution of plants from Hallomajra forest nursery in Hallomajra beat, Nepli Range during 2022-2023.
Clearance of Sukhnachoe bed and choe originate from Colony No. 4 and their banks to make it free from polythene waste and unwanted weeds in Hallomajra Beat, Nepli Range during 2022-23
Clearance and dressing of fire line in Hallomajra Beat, Nepli Range during 2022-23
Mainteance of lawn on the banks and slopes of mounds in sukhnachoe at both sides of bridge route No. 2 in Hallomajra beat, Nepli Range during 2022-23
Opening of sukhna choe bed at various meandering points for smooth flow of water in Hallomajra Beat Nepli Range during 2022-23
Maintenance of flowering plants for beautification sight at both side of bridge of Route No. 2 in Hallomajra Beat, Nepli Range during 2022-23
7thyear maintenance of plantation carried out in hallomajra beat near route no 2 planted during 2015-2016 in lieu of diversion of 0.0337 hac of forest land for producing street light at makhenmajra daria road, in hallomajra beat, nepli range during 2022-2023.
7th year maintenance of CAMPA plantation planted in hallomajra beat during 2015-2016 near raipur khurd in lieu of permission granted to remove 108 nos. trees for p.g.i. project during 2013-14, in hallomajra beat ,manimajra block, nepli range during 2022-2023.
plantation in hallomajra beat in lieu of diversion of land for installation of street light from makhanmajra to daria village in hallomajra and manimajra beat, nepli range during 2022-23.
installation of chain link fence around the proposed CAMPA plantation in lieu of diversion of land for installation of street light from makhanmajra to daria village in hallomajra and manimajra beat, nepli range during 2022-23
Construction of stone masonry wall on forest boundary on route no. 2 to stop illegal entry of unknown person in open forest area in Hallomajra beat, Nepli Range during 2022-23
Construction of stone masonry wall along sensitive boundary of forest area near village raipur khurd in Hallomajra beat, Hollomajra,Block, Nepli Range during 2022-23.
Construction of stone masonry cum retaining wall for protection of bank of Sukhna choe in Hallomajra beat, Hollomajra Block, Nepli Range, during 2022-23.
Construction of revetment in Hallomajra Beat, Nepli Range during 2022-23
DILBAG SINGH AND COMPANY
MS SAHADAR ALI CONTRACTOR
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .