Tender Value
₹2 L
EMD Value
₹2,000
Closing Date
22 Dec 2022, 5:00 pmClosed
Superintending Engineer
EDC, Ayodhya
Giving 20 HP (15 KW) Tubell Connection and Installation of 25 KVA Transformer as Per Request of Maha Prabandhak Jal Nagar Nigam Ayodhya Development Authority, Ayodhya for Prakash Viyastha Parking and other Purpose at under constructed 24 Mtr. Road
2022_MVVNL_759512_1
104 H(F)(W)/2022-23
Open Tender
Electrical Works
Item Wise
90 days
Ayodhya
As Per Tender Specification
2 documents required · 2 mandatory
₹1,180
Superintending Engineer. EDC
₹2,000
27 Dec 2022
16 Dec 2022
23 Dec 2022
16 Dec 2022
22 Dec 2022
16 Dec 2022
Amount
The work of safe carriage of the following material with loading/unloading from store centre Darshan Nagar to site of work. (Approx. Distance 0 to 20 Km.)
ST Pole 11 Mtr. long
ACSR Weasel Conductor
11 KV HT XLPE Cable 3x70 sqmm
11 KV Cable Jointing Kit Outdoor 3x70 sqmm
11 KV Cable Jointing Kit Indoor 3x185 sqmm
LT PVC All Cable XLPE 3.5x70sqmm
11 KV Lightening Arrester
Transformer 25 KVA
Other Line material i.e. cross arm / conductor / pin insulator / stay / earthing/cable Box etc. except A.B Cable.
Dragging of ST Pole as per RESPO Norms.
Fabrication and Erection of Double Pole Support on PCC/ST Pole including grouting with 1:4:8 ratio Cement, sand & Brick Ballast& including digging of pit and fixing of all accessories clamp & earthing as per RESPo Norms. (Cost of clamps borne by contractor)
Grouting and Binding of Stay in 1:4:8 ratio with cement, sand and brick ballast including cost of all grouting materials as per RESSPO Norms
Earthing of Poles as per RESPO Norms
Earthing by way of boring and lowering of "B" class G.I. pipe 50 mm dia 20 mtr. Long from ground upto the water lavel it will be connected to the G.S. Strip for T/F nutral connection the earth strip will be welded to the G.I. pipe the work also included top cap and clamps for pouring water the cost of all material will all labour and T n P etc. complete in all respect . (all the material will be supplied by the contractor.)
Laying of underground 11 KV 3x70 sq mm (Double Circuit) XLPE Cable in Normal Soil by digging of trench 1050 mm deep, 750 mm wide including supply of required material as fine sand, Ist class bricks as per norms. (All the material will be supplied by the contractor except 11 KV XLPE cable)
Hanaging, Hosting & clamping of G.I. Pipe, channel, nut & Bolt 3x70 mm2 XLPE 11 KV cable as per RESSPO Norms (cost of all accessories will be borne by contractor)
Stringing, Sagging, binding and jumpering of ACSR Weasel as per RESSPO Norms
Installation of Heat Shrinkable Type cable jointing kits Outdoor end Termination suitable for 11 KV XLPE cable 3x70 mm2 confirming to IS ESI-09-13-IS-13573 of 1992 amendment I&II VDE-0278 of latest version there of if any. ( Jointing Kit supplied by Dept.)
Mounting of 25 KVA Transformer as per RESSPO Norms.
Supply and Laying of G.I. Pipe 6'' dia
Installation and Fixing of 11 KV Lighting Arrestor
M/S ALOK CONSTRUCTION
M/S SATYAM TRADING COMPANY
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .