Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
17 Jul 2023, 2:00 pmClosed
EE VELLORE
Operation and Maintenance, TANGEDCO, Gandinagar, Vellore-632006
Works Contract for effecting of service connection to The Special Thasildhar for erection of PSC poles and erection of 4 Nos. Single pole transformer in Srilankan Refugees Camp, Melmonavoor Village in respect of AE Shenbakkam Section
2023_EB_334902_1
012
Limited
Electrical and Maintenance Works
Works
180 days
Shenbakkam
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
27 Jul 2023
3 Jul 2023
18 Jul 2023
3 Jul 2023
17 Jul 2023
3 Jul 2023
3 Jul 2023 - 17 Jul 2023
Amount
Loading, Transporting and unloading of poles and associated Materials from substore /vellore to Shenbakkam section work spot upto 5 kms.
Loading, Transporting and unloading of distribution transformer from central stores /vellore to Shenbakkam section work spot upto 10 kms.
Excavation, erection and fixing with various types of line materials for HT/LT pole.
Excation and erection of Stay set Complete
Excavation, erection of single pole DT structure with square pole and stay as per TNEB Standard, painting and earthing and inculding fixing of all structure materails and erection of Distribution transformer of capacity upto 100 KVA.
Stringing of 7/3.35 ACSR / 7/3.15 AAAC size of conductor (circuit length as mentioned in sanction copy)
Stringing of 7/2.59 ACSR / 7/2.50 AAAC size of conductor (circuit length as mentioned in sanction copy)
Excation and erection of Stay set Complete
Fixing of Tapping x arm
Fixing of 11 KV V x arm
Fixing of 11 KV Strain disc/ Polymer disc insulator with metal parts
Fixing of 11 KV Pin insulator with pin
Fixing of HT/LT TI Fitting
Fixing of LT 3 Phase x arm
Fixing of LT Single Phase x arm
Fixing of LT Pin insulator with pin
Fixing of LT Shackle with metal parts
Fixing of Aluminium Knob
Concreting of various size of poles
Pole earthing for various size of poles
E.P.F. @13 % should be Entered by the Bidder
E.S.I. @3.25 % should be Entered by the Bidder
G.S.T. @18% should be Entered by the Bidder
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .