Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.8 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹21.1 L+₹38,250 (1.84%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹21.2 L+₹39,675 (1.91%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹21.4 L+₹66,000 (3.18%)Admitted-Finance | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | G.Sudhakar L3 | O.VEDAGIRI L1 | E VEDAGIRI L2 | S BAVA ENGINEERING L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Cleaning the area inside the building daily by sweeping the floors and corridors of Office & plant areas with toilet and bathrooms daily.Mopping the floors and corridors of Office area once in a week and daily for toilet area. Cobweb cleaning from walls and windows corridors, cleaning once in fortnight. Note: Moping and cleaning materials like liquid soap, phenyl, brooms, cleaning acid etc are included in contractors scope.Note:- The contractor shall engage minimum 01 Nos. male unskilled labour and 04 Nos Female unskilled labours daily for house keeping maintenance works excluding Sundays & national holidays. cleaning materials as per annexure-1 in tender document to be supplied and the amount for these materials are included in the work no extra will be paid for the same)These materials to be supplied in 3 Instalments First, Fourth & Eigth month from date of work order. RABills will be generated only after receipt of materials . | 12,00,000 | Sq.m | 1.4 ₹16,80,000 | 1.54 ₹18,48,000 | 1.45 ₹17,40,000 | 1.27 ₹15,24,000 Lowest |
| 2.00 | Carrying out supervision of housekeeping works and works like surveying, levelling, checking of formwork, fabrication, reinforcement, witnessing sample retrieval & testing, ensuring concrete ingredient ratio in RCC/ PCC works, brickwork, plaster, flooring works at site including preparation of tender documents, draft work order, agreements, compiling, binding, labeling and keeping data in computer as per direction of Engineer-in-Charge.Note; 1)Each Job shall be carried out by one qualified Diploma holder/ Licentiate in Civil/ Construction Engineering/ Technology conducted by board of Technical Examinations/ University/ Autonomous Govt./ Govt. recognized Polytechnic/ Institute.
2) Deployment: The contractor shall deploy one diploma engineer having minimum 5 Years experience minimum 08:30 hours per day with 30 minutes of break.3)Mode of measurement : Measurement will be as per job basis and part thereof. Job will be measured a single job and shall be carried out by deploying one engineer exclusively for particular job. | 325 | No. of operation | 1,339 ₹4,35,175 | 700 ₹2,27,500 Lowest | 1,150 ₹3,73,750 | 1,900 ₹6,17,500 |
Tender Value
₹22.4 L
EMD Value
₹44,747
Closing Date
21 Aug 2025, 3:00 pmClosed
FD, BARCF , KALPAKKAM
OFFICE OF FD, BARCF, KALPAKKAM
Maintaining clean condition of floor areas and cleaning the toilets at NDDP and AUGF plant site MPDD BARCF Kalpakkam for the year 2025_2026
2025_BARC_872125_1
BARCF/NDDP/OP/TR/22/2025
Open Tender
Housekeeping/ Cleaning
Item Rate
365 days
BARCF, KALPAKKAM
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹44,747
9 Sept 2025
8 Aug 2025
26 Aug 2025
9 Aug 2025
21 Aug 2025
15 Aug 2025
10 Aug 2025 - 14 Aug 2025
Amount
Cleaning the area inside the building daily by sweeping the floors and corridors of Office & plant areas with toilet and bathrooms daily.Mopping the floors and corridors of Office area once in a week and daily for toilet area. Cobweb cleaning from walls and windows corridors, cleaning once in fortnight. Note: Moping and cleaning materials like liquid soap, phenyl, brooms, cleaning acid etc are included in contractors scope.Note:- The contractor shall engage minimum 01 Nos. male unskilled labour and 04 Nos Female unskilled labours daily for house keeping maintenance works excluding Sundays & national holidays. cleaning materials as per annexure-1 in tender document to be supplied and the amount for these materials are included in the work no extra will be paid for the same)These materials to be supplied in 3 Instalments First, Fourth & Eigth month from date of work order. RABills will be generated only after receipt of materials .
Carrying out supervision of housekeeping works and works like surveying, levelling, checking of formwork, fabrication, reinforcement, witnessing sample retrieval & testing, ensuring concrete ingredient ratio in RCC/ PCC works, brickwork, plaster, flooring works at site including preparation of tender documents, draft work order, agreements, compiling, binding, labeling and keeping data in computer as per direction of Engineer-in-Charge.Note; 1)Each Job shall be carried out by one qualified Diploma holder/ Licentiate in Civil/ Construction Engineering/ Technology conducted by board of Technical Examinations/ University/ Autonomous Govt./ Govt. recognized Polytechnic/ Institute. 2) Deployment: The contractor shall deploy one diploma engineer having minimum 5 Years experience minimum 08:30 hours per day with 30 minutes of break.3)Mode of measurement : Measurement will be as per job basis and part thereof. Job will be measured a single job and shall be carried out by deploying one engineer exclusively for particular job.
E VEDAGIRI (BID ID -3270025)
G.Sudhakar (BID ID -3269499)
S BAVA ENGINEERING (BID ID -3269987)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .