Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹7.3 LAccepted-AOC | 1 | Accepted-AOC L1 | |
| 2 | 2₹7.8 L+₹49,245.62 (6.72%)Rejected-AOC | 2 | Rejected-AOC L2 | |
| 3 | 3₹8.5 L+₹1.2 L (16.7%)Rejected-AOC MOHIUDDENPUR DANDUPUR KARCHHANA ALLAHABAD UTTAR PRADESH 211008 | PRAYAGRAJ | UTTAR PRADESH | 211008 | 3 | Rejected-AOC L3 |
Tender Value
₹10.4 L
EMD Value
₹10,500
Closing Date
3 Jan 2022, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
Electricity Transmission Circle-II, U.P. Power Transmission Corporation Ltd. 57- George Town, Prayagraj.
125/ETC-II(P)/ 2021-2022
2021_UPTCL_665473_2
125/ETC-II(P)/ 2021-2022
Open Tender
Electrical Works
Item Rate
90 days
Rewa-Road Fatehpur DC Line
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
EE,ETD-NAINI,PRAYAGRAJ
₹10,500
8 Mar 2022
29 Dec 2021
4 Jan 2022
29 Dec 2021
3 Jan 2022
29 Dec 2021
120 days
Amount
Revetment of tower foundation at Loc No. 102 (DA+0) of 220 KV Rewa Road-Fatehpur Line, under Electy. Trans. Division-II, Prayagraj. The Job includes the following works :
Excavation of earth with the help of suitable T&P and labour, watering and ramming of excavated earth.
Concrete with cement, coarse sand & 40 mm stone ballast in ratio 1:4:8 ratio in foundation and under floor including the cost of all material/Labour and T&P etc. required for proper completion of work satisfactory.
Ist class brick work for the construction of retaining wall in 1:4 ratio cement, and sand including the cost of all material, labour& T&P etc. required for proper completion of job satisfactorily.
Concrete on the top of wall with cement, coarse sand & 20 mm stone ballast mortar in ratio 1:2:4 including the cost of all material. Labour and T&P etc. required for proper completion of work satisfactorily.
Earth filling under floor and in area between tower foundation and retaining wall including the cost of soil to be obtained by the contractor from outside including watering, ramming and dressing of earth etc. complete including the cost of earth rayalty, taxes, freight etc. and cost of material labour and T&P required for proper completion of work satisfactorily.
12 mm plaster work on wall with cement and sand in ratio 1:4 including cost of all material, labour and T&P required for proper completion of work satisfactorily.
Ist class brick on edge floor laid including preparation of base to proper slope including supply of all material, labour& T&P etc. required for proper completion of job satisfactorily.
Making weep holes providing plastic pipe of length 15 mtr. (cost including the cost of plastic pipe including cutting in accordance size and fitting them two layers at the span of 1.5 meter at depth of 0.5 mtr, 1.25 mtr and 2.00 mtr. respectively from the top of the revetment wall.)
KANOIJIYA TRADERS
M/s Tanishk Enterprises
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .