Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹17.2 LAdmitted-Finance | -31.31% | ₹17.2 L | L1 | Admitted-Finance |
| 2 | L2₹20.5 L+₹3.4 L (19.6%)Admitted-Finance | -17.86% | ₹20.5 L+₹3.4 L (19.6%) | L2 | Admitted-Finance |
| 3 | L3₹21.8 L+₹4.6 L (26.7%)Admitted-Finance | -13.00% | ₹21.8 L+₹4.6 L (26.7%) | L3 | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical No EMD or Fee received |
Tender Value
₹25 L
EMD Value
₹50,000
Closing Date
21 May 2026, 6:00 pmClosed
Commissioner Municipal Council Sardarshahar
Commissioner Municipal Council Sardarshahar
REPAIRING WORK OF CROSS NALA NALI CHAMBERS FROM WARD NO 1 TO 55 NAGARPARISHAD SARDARSHAHAR
2026_DLB_558371_1
ENIT_08_2026_27_SDSR_SNO_2
Open Tender
Civil Works
Percentage
120 days
Sardarshahar
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
As per NIT
₹50,000
Yes
11 Jun 2026
12 May 2026
25 May 2026
12 May 2026
21 May 2026
12 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Diemanlling ofl existing siructures like culverts, bridges, retainingwalls, CC road and other structure comprising of masonry, cementconcrete, wood work, steel work, Including T&P and scaffoldingwherever necessary, sorting the dismantled material, disposal ofunserviceablee material material andg stackig the serviceable material with alllifts and lead of 50 metres as directed by Engineer.depths, below naturalground/Road top level. | - | Cum | 578 | - |
| 2 | Carriage of Materials by mechanical transport including loading, unloading and stacking ::earth lead 5.0 km | - | Cum | 203.81 | - |
| 3 | Brick work with F.P.S. bricks of class designation 75 in foundation and plinth in: Cement Mortar 1:6 (1-Cement:6-coarse sand). | - | Cum | 5,400 | - |
| 4 | Cement plastering including T&P, scaffolding, material and complete labpour, including cost of water,curing, racking of joints etc, with 12 mm cement plaster of mix :1:6(1 cement: 6 fine/ coarse sand) | - | Sqm | 213.5 | - |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :1:4:8 (1 Cement: 4 fine/ coarse sand: 8 graded stone aggregate ate 40 mm nominal size). | - | Cum | 4,575 | - |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :1:11/2:3 (1 Cement: 112 coarse sand: 3 graded stone aggregate 20 mm nominal size). | - | Cum | 5,910 | - |
| 7 | . | - | No. | 24,83,119.69 | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.82 MB
BOQ_994036.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .