Loading…
Loading…
Tender Value
₹94.5 L
EMD Value
₹1.9 L
Closing Date
1 Jun 2026, 2:00 pmClosed
Executive Engineer phe div leh
Executive Engineer phe div leh
Construction of Water Supply Scheme for 24th Batallion ITBP camp at Sirlungla.
2026_PWD_19007_1
E-Tender no 510 of phe div leh
Open Tender
Civil Works - Others
Percentage
60 days
leh
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,000
Executive Engineer phe div leh
₹1.9 L
2 Jun 2026
30 May 2026
2 Jun 2026
30 May 2026
1 Jun 2026
30 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto1.5m, as directed by Engineer-in Charge All kinds of soil | 312 | Sqm | 104.97 | ₹32,750.64 |
| 2 | Earth work inexcavation by mechanical means (Hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge All kinds of Soil 50% | 97.87 | Cum | 245.94 | ₹24,070.15 |
| 3 | Ordinary Rock : 50% | 97.87 | Cum | 452.99 | ₹44,334.13 |
| 4 | Earth work in excavation by mechanical means (Hydraulic excavator) in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto1.5m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m All kinds of soil | 452.04 | CUM | 595.29 | ₹2,69,094.89 |
| 5 | Providing and laying of HDPE pipe line in trenches 40mm dia HDPE | 365 | RM | 134.17 | ₹48,972.05 |
| 6 | 20mm dia HDPE | 100 | RM | 63.6 | ₹6,360 |
| 7 | Providing and laying of HDPE pipe as rising main 40 mm dia HDPE | 260 | RM | 134.17 | ₹34,884.2 |
| 8 | Dumping stone including cost of stones. in Horizontal on level | 7.4 | Cum | 1,124.57 | ₹8,321.82 |
| 9 | Filling availableexcavatedearth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm indepth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m | 367.62 | Cum | 260.08 | ₹95,610.61 |
| 10 | Construction of Granular Sub-base by providing close graded material confirming to specifications, mixing in a mechanical mix plant at OMC, carriagge of mixed materials by trippers to work site, foe all leads and lifts, spreading in uniform layers of specified thickness and minor grader on the prepared sirface and compacting with manual labour tomachieve the desired density, complete as per specifications and directions of Engineer Incharge with material confirming to Grade -III (Size range 26.5 mm to 0.075 mm) having CBR Value -20 | 8.38 | Cum | 1,628.05 | ₹13,643.06 |
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.43 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.98 MB
BOQ_45350.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .