Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.6 LAccepted-AOC | ₹5.6 L | L1 | Accepted-AOC ok |
| 2 | L2₹5.6 LRejected-Finance HIMACHAL PRADESH | SHIMLA | HIMACHAL PRADESH | 172029 | ₹5.6 L | L2 | Rejected-Finance L2 |
| 3 | L3₹6.2 LRejected-Finance R O PRIMTA NIWAS GAHAN SANJAULI SHIMLA 171006 | SHIMLA | HIMACHAL PRADESH | 171006 | ₹6.2 L | L3 | Rejected-Finance L3 |
Tender Value
₹5.9 L
EMD Value
₹11,795
Closing Date
21 Jul 2026, 5:00 pmClosed
EXECUTIVE ENGINEER
EXECUTIVE ENGINEER HIMUDA DIVISION PARWANOO
Repair and Restoration in 85 Nos schools approved under PDNA 2023 SH Construction of Class Room at Govt Primary School Pratha Block Dharampur Distt Solan HP
2026_HIMUD_138964_1
No.HIMUDA/PD/CB/TN-1601-12 DT 10.07.2026
Open Tender
Civil Works
Percentage
60 days
PARWANOO
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,770
₹11,795
6 Aug 2026
14 Jul 2026
22 Jul 2026
14 Jul 2026
21 Jul 2026
14 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.All kinds of soil. | 22.55 | cum | 243.25 | ₹5,485.29 |
| 2 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 3.54 | cum | 2,185.95 | ₹7,738.26 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand) : 8 graded stone aggregate 40 mm nominal size) | 7.3 | cum | 6,182 | ₹45,128.6 |
| 4 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal size). | 11.64 | cum | 9,851.4 | ₹1,14,670.3 |
| 5Centering and shuttering including strutting, propping etc. and removal of form for all heights : | |||||
| 5.01 | Suspended floors, roofs, landings, balconies and access platform | 49.07 | sqm | 685.15 | ₹33,620.31 |
| 5.02 | Lintels, beams, plinth beams, girders, bressumers and cantilevers | 20.79 | sqm | 532.7 | ₹11,074.83 |
| 5.03 | Edges of slabs and breaks in floors and walls | 131.62 | Rmt | 168.25 | ₹22,145.07 |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding including binding wire upto all heights including carriage of material in all leads and lifts. | 1,440 | Kg | 105.9 | ₹1,52,496 |
| 7 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:Cement mortar 1:6 (1 cement : 6 coarse sand) | 2.02 | cum | 8,091 | ₹16,343.82 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.49 MB
Tendernotice_2.pdf
PDF • 2.13 MB
Tendernotice_3.pdf
PDF • 0.31 MB
BOQ_205832.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].