| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹22.1 LAccepted-AOC | ₹22.1 L Quoted ₹18.7 L | 1 | Accepted-AOC Lowest |
| 2 | 2₹22.4 LRejected-AOC S 17 SHABRI COMPLEX ZONE II M P NAGAR BHOPAL M P 462003 | BHOPAL | BHOPAL | MADHYA PRADESH | 462003 | ₹22.4 L | 2 | Rejected-AOC Not lowest |
| 3 | 3₹23.3 LRejected-AOC | ₹23.3 L | 3 | Rejected-AOC Not lowest |
| 4 | 4₹23.6 LRejected-AOC | ₹23.6 L | 4 | Rejected-AOC Not lowest |
| 5 | 5₹27.4 LRejected-AOC WARD NO 11 THANA ROAD SADAR BAZAR GORMI BHIND M P PIN 477660 | GORMI | BHIND | MADHYA PRADESH | 477660 | ₹27.4 L | 5 | Rejected-AOC Not lowest |
| Sl No | Description | Qty | Unit | Shri Gautam Rishi Traders L5 | A B GROUPS L3 | D S DEVELOPERS L4 | GIRISH GOSWAMI L1 | S N ASSOCIATES L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00Civil Works | ||||||||
| 1.01 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. | 65 | 100 Sqm | 414 ₹26,910 | 82 ₹5,330 | 397 ₹25,805 | 10 ₹650 | 249 ₹16,185 |
| 1.02 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m. | 650 | 100 Sqm | 634 ₹4.1 L | 52 ₹33,800 | 8 ₹5,200 | 10 ₹6,500 | 10 ₹6,500 |
| 1.03 | Earth work in excavation/ by mechanical means (Hydraulic Excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 sqm on plan) including dressing of sides and ramming of bottom disposal of excavated earth, Note:- Excavation of hard rock shall be the property of the contractor subject to recovery. excavated material has to shift from site within 15 days after instruction issued by Engineer-In- Charge otherwise after this penalty will be imposed on contractor at the rate of Rs 50 per cum per day. | 90 | Cum | 250 ₹22,500 | 323 ₹29,070 | 428 ₹38,520 | 300 ₹27,000 | 349 ₹31,410 |
| 1.04 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level With 20mm nominal size graded stone aggregate. M20 | 51.2 | Cum | 4,500 ₹2.3 L | 7,934 ₹4.1 L | 4,067 ₹2.1 L | 5,800 ₹3.0 L | 2,999 ₹1.5 L |
| 1.05 | Providing and fixing G.I. chain link fabric fencing of required width in mesh size 25x25 mm made of G.I. wire of dia. 3mm including strengthening with 2mm dia. wire or nuts, bolts and washers as required complete with posts of specified material and of standard design placed and embedded in angle 50X50X25mm every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and struts embedded in angle 50X50X25mm , as per the direction of Engineer in- charge. | 2,275 | Sqm | 456 ₹10.4 L | 195 ₹4.4 L | 480 ₹10.9 L | 375 ₹8.5 L | 490 ₹11.1 L |
| 1.06 | Fencing with barbed G.I. wire angle iron post placed fitted to at required distance embedded in cement concrete blocks every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum) between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately):- Payment to be made per metre cost of total length of barbed wire used. | 200 | Mtr | 17 ₹3,400 | 165 ₹33,000 | 17 ₹3,400 | 50 ₹10,000 | 20 ₹4,000 |
| 1.07 | Design, supply, fabrication, transportation and erection of structural steel/mild steel built-up sections for steel building in column, rafter, truss, floor joist, wind bracings, tie beam, foundation bolts, fasteners etc. Including two coats of Epoxy paint and one coat of primer. These structural steel/built-up sections shall be manufactured using advanced CNC Plasma/Oxy Acetylene cutter and H Beam Welding line. Welding shall be in full depth on both sides of the plate adopting relevant I.S Code. | 9,000 | KG | 112 ₹10.1 L | 153 ₹13.8 L | 110 ₹9.9 L | 75 ₹6.8 L | 102 ₹9.2 L |
Tender Value
Refer Docs
EMD Value
₹1.4 L
Closing Date
26 Dec 2025, 3:00 pmClosed
Registrar
National Law Institute University
Construction of GI Chain Link Fencing inside the compound wall on the front side of the campus
2025_NLIUB_466316_1
NLIU/Engg/CivilWorks/Nov-02
Open Tender
Civil Works - Others
30 days
National Law Institute University
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,900
₹1.4 L
12 Feb 2026
6 Dec 2025
27 Dec 2025
6 Dec 2025
26 Dec 2025
6 Dec 2025
Civil Works
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared.
Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m.
Earth work in excavation/ by mechanical means (Hydraulic Excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 sqm on plan) including dressing of sides and ramming of bottom disposal of excavated earth, Note:- Excavation of hard rock shall be the property of the contractor subject to recovery. excavated material has to shift from site within 15 days after instruction issued by Engineer-In- Charge otherwise after this penalty will be imposed on contractor at the rate of Rs 50 per cum per day.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level With 20mm nominal size graded stone aggregate. M20
Providing and fixing G.I. chain link fabric fencing of required width in mesh size 25x25 mm made of G.I. wire of dia. 3mm including strengthening with 2mm dia. wire or nuts, bolts and washers as required complete with posts of specified material and of standard design placed and embedded in angle 50X50X25mm every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and struts embedded in angle 50X50X25mm , as per the direction of Engineer in- charge.
Fencing with barbed G.I. wire angle iron post placed fitted to at required distance embedded in cement concrete blocks every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum) between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately):- Payment to be made per metre cost of total length of barbed wire used.
Design, supply, fabrication, transportation and erection of structural steel/mild steel built-up sections for steel building in column, rafter, truss, floor joist, wind bracings, tie beam, foundation bolts, fasteners etc. Including two coats of Epoxy paint and one coat of primer. These structural steel/built-up sections shall be manufactured using advanced CNC Plasma/Oxy Acetylene cutter and H Beam Welding line. Welding shall be in full depth on both sides of the plate adopting relevant I.S Code.
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.34 MB
NITGICHAIN.pdf
Tender Documents • 7.33 MB
BOQ_548240.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid