Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.4 LAccepted-AOC | L1 | Accepted-AOC Lowest bid | |
| 2 | L2₹13.4 L+₹2.0 L (17.2%)Rejected-Finance HANS BHAWAN KALAGARH ROAD DHAMPUR DISTRICT BIJNOR UTTAR PRADESH | DHAMPUR | BIJNOR | UTTAR PRADESH | L2 | Rejected-Finance Second lowest bid. | |
| 3 | Rejected-Technical A 25 NEW COLONY KALAGARH DIST PAURI GARHWAL | - | Rejected-Technical Rejected due to invalid character certificate. |
Tender Value
₹12 L
EMD Value
₹24,000
Closing Date
3 Mar 2025, 2:00 pmClosed
Executive Engineer
O/O Executive Engineer Ramganga Dam Division, Kalagarh, Dist- Pauri Garhwal, Uttarakhand
Construction work of river gauge at Sub-Station Chaukhutiya, Naula and Marchula of Almora district.
2025_UPIDC_1001272_2
04/EE/RDD/2024-25/LOT-05
Open Tender
Civil Works
Item Rate
30 days
Chaukhutiya, Naula and Marchula of Almora district
Please refer Tender documents.
2 documents required · 2 mandatory
₹766
₹24,000
21 Mar 2025
25 Feb 2025
3 Mar 2025
25 Feb 2025
3 Mar 2025
25 Feb 2025
Amount
Material and labour for Excavation in Structures including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material Manual Means upto 3 m depth and directed by Engineer in charge.
Material and labour in Foundation Plain cement concrete 1:2:4 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibrations directed by Engineer in charge.
Material and Labour for mild steel/iron work such as R.C.C work 12mm dia bar fixing and binding with 24 BWG binding wire for complete of work all as specified and directed by Engineer-in-charge.
Material and labour for reinforced cement concrete of nominal mix (1:2:4) in complete all as specified and directed by Engineer in charge.
Material and labour for Brick masonry work in cement mortar (1:4) in foundation complete all as directed by Engineer in charge.
Brick masonry work in 1:4 in superstructure complete specifications as directed by Engineer in charge.
Material and labour for 12mm thick Plastering with cement mortar (1:4 ) all as specified and directed by Engineer- in-charge
Material and labour for Stone masonry work in cement mortar (1:3) for foundation as per direction of Engineer-in-Charge
Material and labour for Dismantling stone massonary as other structure comprising of stone masonry, including disposal of unserviceable material
Material and labour for Stone masonry work in cement mortar (1:3) for superstructure complete as per specified and directed by Engineer-in-Charge
Material and labour Providing and fixing 1 M.M. thick sheet M.S. sheet window& Door with frame of 40x40x6 m.m. Angle iron and 3 m.m. M.S. gussetplates at the junction and corners all necessary fitting complete , including applying a priming coat of approved steel primer and two coat of synthetic enamel paint i/c cost of all material, labour,T&P etc. complete of work all as specified directed by Engineer-in -Charge
Material and labour Providing and fixing 1 M.M. thick sheet M.S. sheet window& Door with frame of 40x40x6 m.m. Angle iron and 3 m.m. M.S. gussetplates at the junction and corners all necessary fitting complete , including applying a priming coat of approved steel primer and two coat of synthetic enamel paint i/c cost of all material, labour,T&P etc. complete of work all as specified directed by Engineer-in -Charge
YOGESH KUMAR CONTRACTOR (BID ID -5012285)
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .