Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹30,653.89Admitted-Finance | -66.66% | ₹30,653.89 | L1 | Admitted-Finance |
| 2 | L2₹59,763.14Admitted-Finance | -35.00% | ₹59,763.14 | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | - | Rejected-Technical Non-Responsive |
Tender Value
₹4 L
EMD Value
₹8,000
Closing Date
3 Jun 2026, 4:00 pmClosed
Executive Engineer S and D Division Ist
Suliman Complex Dalgate Srinagar
Annual Maintenance of Sewerage Services Networks within the Govt. Lalla Ded Hospital Srinagar for the year 2026-27
2026_HAUDD_310310_2
Short Term e-NIT No.04 of 2026-27
Open Tender
Civil Works
300 days
LD Hospital Srinagar
as per NIT
2 documents required · 2 mandatory
₹500
Executive Engineer S and D Division Ist
₹8,000
9 Jun 2026
19 May 2026
4 Jun 2026
19 May 2026
3 Jun 2026
19 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearance of sewer lines and manholes by way of removing silt, slush, solid, garbage, organic, inorganic material, dewatering and disposal with all carriages involved at site to dumping site as directed by Engineer-In-Charge (Complete Job) with all leads and lifts Shrinkage shall be deducted @10% per cum. | 1 | Cum | 450 | ₹450 |
| 2 | Clearance of sump wells, silt chambers, etc by way of removing silt, slush, solid, garbage, organic, inorganic material, dewatering and disposal with all carriages involved at site to dumping site as directed by Engineer-In-Charge (Complete Job) with all leads and lifts Shrinkage shall be deducted @ 10% per cum. | 1 | Cum | 700 | ₹700 |
| 3Providing & Laying to level & slope, with proper grade pipes of Class NP3/NP4 of following internal dia & grouting the pipe joints with cement slurry 1: 2 mix (1 cement: 2 fine sand) and also sealing the pipe joints with fixing of Rubber Gaskets incl. Cost of cement, sand, Rubber gaskets and RCC pipes incl. Testing of joints & all carriages of pipes upto site of work (Complete job). | |||||
| 3.01 | 200mm dia (NP3) | 1 | RM | 1,175 | ₹1,175 |
| 3.02 | 250mm dia (NP3) | 1 | RM | 1,500 | ₹1,500 |
| 3.03 | 300mm dia (NP3) | 1 | RM | 1,750 | ₹1,750 |
| 3.04 | 350mm dia (NP3) | 1 | RM | 2,250 | ₹2,250 |
| 3.05 | 400mm dia (NP3) | 1 | RM | 2,615 | ₹2,615 |
| 3.06 | 450mm dia (NP4) | 1 | RM | 2,950 | ₹2,950 |
| 3.07 | 500mm dia (NP4) | 1 | RM | 3,500 | ₹3,500 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.08 MB
BOQ_1003978.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid