| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.2 LAccepted-AOC | ₹9.2 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹9.6 L+₹43,006.99 (4.67%)Rejected-AOC | ₹9.6 L+₹43,006.99 (4.67%) | L2 | Rejected-AOC Rejected |
| 3 | L3₹10.1 L+₹86,631.47 (9.41%)Rejected-AOC | ₹10.1 L+₹86,631.47 (9.41%) | L3 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | THARUN CONSTRUCTION L2 | M/s.Sri Lakshaya Enterprises L1 | P.RAGUNATHAN L3 |
|---|---|---|---|---|---|---|
| 1.00 | Supplying and erecting Safety Scaffolding arrangement using Cup-lock system, having a standard width of 1.20m, provided for working platform in the peripheral area of the high rise building. The Safety Scaffolding arrangement shall be formed by using vertical hot rolled steel pipe of 40mm diameter with a thickness of 2.90mm. The vertical pipe shall have a steel cup arrangement of 80mm diameter to hold the horizontal ledger pipe with top movable lock arrangement made up of Cast Iron. The above cup arrangement to hold the ledger pipe shall be welded to the vertical pipe at a distance of every 0.50m c/c. The horizontal ledger pipe with various lengths ranging from 0.90m to 2.0m may be used with a diameter of 40mm and with a thickness of 2.90mm made up of Hot rolled steel. The horizontal ledger pipe shall be provided at a vertical height of every 1m. Both the ends of the horizontal ledger pipe shall be welded with a steel plate of 100mm length and a width of 60mm at the center and 35mm at both the edges. The Whole arrangement shall be placed above the bottom base arrangement having fixed/ adjustable mechanism made with a base plate of size 150 mm x 150mm with a suitable thickness as required. The working platform Jally of suitable required size shall be fabricated using MS square pipes of size 25mm x 25mm. Necessary Clamps/ Clips with bolt and nut arrangement shall be provided to the working platform jally to hold it with the abovesaid scaffolding System. Necessary Stay arrangement for the above scaffolding system shall be made at Ground level and at every Floor level using Hot rolled steel pipes of diameter 40mm with clamps. The above stay arrangements shall be provided at every 6m in horizontal direction and at every 3.6m/ floor level in vertical direction. The cost includes material and fabrication charges of all materials, transportation, labour chareges for erection & dismantling of scaffolding, etc as per standard specification and as directed by the departmental officers. | 945.35 | M2 | 1,28,567.6 ₹1,51,709.77 | 1,03,988.5 ₹1,22,706.43 Lowest | 1,41,802.5 ₹1,67,326.95 |
| 2.00 | Painting New Plastered Wall Surface with Two finishing coats of ready mixed (Emulsion) of approved quality and colour over one coat priming coat in all floors including the cost of primer etc., complete complying with standard specification and as directed by the departmental officers.(The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.) | 2,373.5 | M2 | 6,88,315 ₹8,12,211.7 | 6,76,447.5 ₹7,98,208.05 Lowest | 7,12,050 ₹8,40,219 |
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
24 Feb 2026, 3:00 pmClosed
The Commissioner,Tambaram City Municipal Corporati
No.01,Kalaivani Strete , Rajakilpakkam,chennai-73
Painting and Renovation of Existing 23.00 and 5.00 Lakh LL capacity OHT at Kulakkarai street and NGO Colony Park OHT in Ward 23 and 25 in Zone 3 in Tambaram City Municipal Corporation
2026_DMA_664474_34
168/2026/E1
Open Tender
Civil Works
Works
90 days
Tambaram City Municipal Corporation
Painting and Renovation of Existing 23.00 and 5.00 Lakh LL capacity OHT at Kulakkarai street and NGO Colony Park OHT in Ward 23 and 25 in Zone 3 in Tambaram City Municipal Corporation
2 documents required · 2 mandatory
₹0
₹10,000
4 Jul 2026
23 Feb 2026
24 Feb 2026
23 Feb 2026
24 Feb 2026
23 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | GST % |
|---|---|---|---|---|---|---|
| 1 | Supplying and erecting Safety Scaffolding arrangement using Cup-lock system, having a standard width of 1.20m, provided for working platform in the peripheral area of the high rise building. The Safety Scaffolding arrangement shall be formed by using vertical hot rolled steel pipe of 40mm diameter with a thickness of 2.90mm. The vertical pipe shall have a steel cup arrangement of 80mm diameter to hold the horizontal ledger pipe with top movable lock arrangement made up of Cast Iron. The above cup arrangement to hold the ledger pipe shall be welded to the vertical pipe at a distance of every 0.50m c/c. The horizontal ledger pipe with various lengths ranging from 0.90m to 2.0m may be used with a diameter of 40mm and with a thickness of 2.90mm made up of Hot rolled steel. The horizontal ledger pipe shall be provided at a vertical height of every 1m. Both the ends of the horizontal ledger pipe shall be welded with a steel plate of 100mm length and a width of 60mm at the center and 35mm at both the edges. The Whole arrangement shall be placed above the bottom base arrangement having fixed/ adjustable mechanism made with a base plate of size 150 mm x 150mm with a suitable thickness as required. The working platform Jally of suitable required size shall be fabricated using MS square pipes of size 25mm x 25mm. Necessary Clamps/ Clips with bolt and nut arrangement shall be provided to the working platform jally to hold it with the abovesaid scaffolding System. Necessary Stay arrangement for the above scaffolding system shall be made at Ground level and at every Floor level using Hot rolled steel pipes of diameter 40mm with clamps. The above stay arrangements shall be provided at every 6m in horizontal direction and at every 3.6m/ floor level in vertical direction. The cost includes material and fabrication charges of all materials, transportation, labour chareges for erection & dismantling of scaffolding, etc as per standard specification and as directed by the departmental officers. | 945.35 | M2 | - | - | 18% |
| 2 | Painting New Plastered Wall Surface with Two finishing coats of ready mixed (Emulsion) of approved quality and colour over one coat priming coat in all floors including the cost of primer etc., complete complying with standard specification and as directed by the departmental officers.(The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.) | 2,373.5 | M2 | - | - | 18% |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_797953.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.49 MB
BOQ_797953.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .