| 1 | L-1₹3.5 CrAccepted-AOC SCT 3 H NO 2030 ROHTAK SCT 3 H NO 2030 ROHTAK 124001 | ROHTAK | HARYANA | 124001 | ₹3.5 Cr | L-1 | Accepted-AOC Ok |
| 2 | L-2₹3.5 Cr+₹3.7 L (1.06%)Rejected-AOC NA | ₹3.5 Cr+₹3.7 L (1.06%) | L-2 | Rejected-AOC Ok |
| 3 | L-3₹3.5 Cr+₹5.2 L (1.49%)Rejected-AOC | ₹3.5 Cr+₹5.2 L (1.49%) | L-3 | Rejected-AOC Ok |
| 4 | L-4₹4.3 Cr+₹84.6 L (24.3%)Rejected-AOC 1804 SECTOR 2 HUDA 124001 | ROHTAK | HARYANA | 124001 | ₹4.3 Cr+₹84.6 L (24.3%) | L-4 | Rejected-AOC Ok |
Tender Value
₹4.1 Cr
EMD Value
₹8.2 L
Closing Date
26 Mar 2024, 3:00 pmClosed
OM SINGH RANA
EE PHE Division No. 1 Jhajjar
Construction of independent canal based Water Works Birar
2024_HRY_363633_1
20244FF01452 68C4 4C5E 8233 E5CE7F60978C590PUH
Open Tender
Civil Works
Works
295 days
BIRAR
2 documents required · 2 mandatory
₹15,000
₹8.2 L
Yes
18 Oct 2024
5 Mar 2024
26 Mar 2024
5 Mar 2024
26 Mar 2024
5 Mar 2024
Amount
Providing, fixing and commissioning Vacuum Gas Chlorination system of rating 2000 grams per hour as designed having the control of gas 20th part of max. dose and which can start working automatically on switching in the supply of water at the water works site consisting of vacuum regulator E-10K (EQUATE/ Wand USA Make)/ Supreme Technology including safety equipment consisting of chlorine mask with canister, chlorine leak detector with hooter and sensor, 2 nos. filled of chlorine cylinders of capacity 100 kg duly certified and approved by BIS and explosive department Govt. of India, spanner with cylinder opening key, 2 set connectors, iron cage guard the system including complete installation of the equipment`s and all other works contingent thereto as per satisfaction of Engineer-In-Charge
PUMPING MACHINERY/RAW WATER PUMP / Supply and erection of Horizontal spindle split casing type pumping sets minimum Four (4) Star rating duties coupled to AC squirrel cage induction type motor with 1440 RPM, 3 phase 50 Hz and accessories as described in Schedule No.II complete in all respect with priming arrangement with complete base frame. Raw Water Pump set 700LPM 12 Mtrs Head .
Operation and Maintenance of water works for complete scope of work mentioned in the DNIT and of whole existing water supply scheme in the village Disinfection material supplied by the PHED as per schedule-IV for a period of 5 years after 12 months defect liability period and 3 months trial run period. (will be charged to the A/mtc estimate) complete in all respects as per approved NIT. 1) Operation and maintenance during defect liability period after 3 month trial run period (operation only)
Operation and Maintenance of water works for complete scope of work mentioned in the DNIT and of whole existing water supply scheme in the village Disinfection material supplied by the PHED as per schedule-IV for a period of 5 years after 12 months defect liability period and 3 months trial run period. (will be charged to the A/mtc estimate) complete in all respects as per approved NIT. 2.)Operation and maintenance for 1st year
Operation and Maintenance of water works for complete scope of work mentioned in the DNIT and of whole existing water supply scheme in the village Disinfection material supplied by the PHED as per schedule-IV for a period of 5 years after 12 months defect liability period and 3 months trial run period. (will be charged to the A/mtc estimate) complete in all respects as per approved NIT. 3.)Operation and maintenance for 2nd year
Operation and Maintenance of water works for complete scope of work mentioned in the DNIT and of whole existing water supply scheme in the village Disinfection material supplied by the PHED as per schedule-IV for a period of 5 years after 12 months defect liability period and 3 months trial run period. (will be charged to the A/mtc estimate) complete in all respects as per approved NIT. 4.)Operation and maintenance for 3rd year
Operation and Maintenance of water works for complete scope of work mentioned in the DNIT and of whole existing water supply scheme in the village Disinfection material supplied by the PHED as per schedule-IV for a period of 5 years after 12 months defect liability period and 3 months trial run period. (will be charged to the A/mtc estimate) complete in all respects as per approved NIT. 5.)Operation and maintenance for 4th year
Operation and Maintenance of water works for complete scope of work mentioned in the DNIT and of whole existing water supply scheme in the village Disinfection material supplied by the PHED as per schedule-IV for a period of 5 years after 12 months defect liability period and 3 months trial run period. (will be charged to the A/mtc estimate) complete in all respects as per approved NIT. 6.)Operation and maintenance for 5th year
Bidder Name
Amount
Surinder Singh Hooda (GSTN-06AABPH9599L2Z1) BID ID -1075174
Narender Singh Contractor (GSTN-06AXBPS0272N1Z8) BID ID -1075471
Sh. Ashok Kumar Sindhu(GSTN-NA)--1075635
RAM PHAL SINGH CONT(GSTN-NA)--1058443
RAM PHAL SINGH CONT
Sh. Ashok Kumar Sindhu
Narender Singh Contractor
RAM PHAL SINGH CONT
Surinder Singh Hooda
Narender Singh Contractor
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .