| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.0 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹11.3 L+₹65,029.80 (6.11%)Rejected-AOC NO 15 KANNAGI NAGAR KORATTUR CHENNAI 600 080 | CHENNAI | CHENNAI | TAMIL NADU | 600080 | L2 | Rejected-AOC L2 | |
| 3 | L3₹12.2 L+₹1.6 L (15.0%)Rejected-AOC | L3 | Rejected-AOC L3 | |
| 4 | L4₹13.0 L+₹2.4 L (22.3%)Rejected-AOC P NO 94 AGS NAGAR ZAMIN PALLAVARAM CHENNAI 600 117 | CHENNAI | CHENGALPATTU | TAMIL NADU | 600117 | L4 | Rejected-AOC L4 | |
| 5 | L5₹13.9 L+₹3.3 L (30.6%)Rejected-AOC | L5 | Rejected-AOC L5 |
Tender Value
₹14.4 L
EMD Value
₹14,400
Closing Date
12 Mar 2024, 2:00 pmClosed
SE/GCC-I/CNI
Guindy 230kV GIS SS campus
Establishment of power transformer capacity from 4x16 MVA to 5x16 MVA and 11 KV foundation plinths and allied civil works at existing SIDCO Ambattur
2024_EB_443167_1
OT-49/2023-24 of SE/GCC-1/CHN
Open Tender
Civil Works
Works
120 days
Chennai
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹14,400
Yes
21 Jun 2024
7 Mar 2024
13 Mar 2024
7 Mar 2024
12 Mar 2024
7 Mar 2024
Amount
Earth work excavation and depositing on bank with initial lead of 10 m and lift of 2m in hard shift clay, shales, Murram including cost of all materials, lead, lift etc., complete.As department enigineer at site
Providing M-sand filling in foundation, including cost of sand, filling charges, watering and consolidation etc complete. As department enigineer at site
Providing foundation concrete in PCC 1:3:6, using 20 mm HBG stone including cost of cement, and all materials labour, lead, lift etc complete.As department enigineer at site
RCC 1:1.5:3 using 12 to 20 mm HBG metal for concrete including cost of all materials, curing, labour ,lead, lift etc.complete.As department enigineer at site Without form work for raft
RCC 1:1.5:3 using 12 to 20 mm HBG metal for concrete including cost of all materials,curing,labour ,lead,lift etc.complete.As department enigineer at site Without form work for plinth
R.C.C. 1:1.5:3 using 12- 20mm metal for foundation for Plinth above GL with form work using steel centering for soffits of reinforced cement concrete slabs or plain surfaces including stutting up to 3m high, using M.S. Sheets of size 90cm x 60cm. and 'B.G.10' guage, stiffened with welded M.S. angle of size 25mm x 25mm x 3mm laid over silver oak (Country wood) joists of size 10cm x 6.5cm. (spaced at about 90 cm c/c) and supported by casurina props of 10cm to 13cm. dia (spaced at 75cm c/c) complying with standard specification including cost of all materials,transport, curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site.
Supplying fabricating and placing in position of steel reinforcements including cost of steel binding wire labour for cutting bending tying placing in correct position transport lead lift etc complete as per standard specification.
Labour charges for assembling and re-fixing of template in correct position and alligenment for various equipment plinth and grouting the foundation bolt including cost of all material transport , labour,lead, lift etc, complete as directed by the dept. Engineer at site. (The templete will be make own arrangement by the contractor)
Fabrication, Supplying and fixing of 20mm dia GI Bolts & nutts of specified length threading for a length of 15cm at top and 15cm L at bottom and hot dip galvanising of bolt including supply of 2nos. of GI nuts & washers and fixing in the position as directed by the engineer at site including assembling of template etc., cost of all materials labour lead lift etc. complete. 20 mm dia GI Bolt & Nuts with 1mtr length
Fabrication, Supplying and fixing of 20mm dia GI Bolts & nutts of specified length threading for a length of 15cm at top and 15cm L at bottom and hot dip galvanising of bolt including supply of 2nos. of GI nuts & washers and fixing in the position as directed by the engineer at site including assembling of template etc., cost of all materials labour lead lift etc. complete. 20 mm dia GI Bolt & Nuts with 1.75 mtr length
Plastering in CM 1:3 12 mm thick including cost of all materials, transport, curing, labour, lead, lift etc. complete.as per standard specification and as directed by the dept. Engineer at site.
Colour washing two coats using exterior emulsion paint with approved quantity white cement over a waterbase primer as priming coat including cost of all materials, labour, lead lift etc., complete as per standard specification and as directed by the department engineer at site.
Back filling the excavation earth completing with standared specification for filling , watering and compaction in layers for filling in foundation including cost of labour, lead, lift etc., compelte
Labour charges for removal of surplus earth from the site and putting into low lying area inside the yard upto 2 Kms away from the site including the cost of all labour, transport, lead, lift etc., complete as directed by the department engineer at site.
GST for bidders within TamilNadu
GST for bidders outside TamilNadu (IGST)
JAGAN ENTERPRISES
SCAN CONSTRUCTION
SP TECH ENGINEERING PVT LTD
SHAKTHI CONSTRUCTION
SREE SIVAMARI CONSTRUCTION
R SRINATH
MK DHANALAKSHMI ENGINEERING PRIVATE LIMITED
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .