Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.9 LAdmitted-Finance | -0.50% | ₹2.9 L | L1 | Admitted-Finance |
| 2 | L2₹2.9 LAdmitted-Finance | -0.20% | ₹2.9 L | L2 | Admitted-Finance |
| 3 | L3₹2.9 LAdmitted-Finance | +0.00% | ₹2.9 L | L3 | Admitted-Finance |
Tender Value
₹2.9 L
EMD Value
₹5,820
Closing Date
29 Apr 2026, 6:00 pmClosed
XEN REW JAMMU
XEN REW JAMMU
Construction of Shed at Chakra Near Shiv Mandir Pyt Kheri B (Part A) Block Bishnah under Scheme MLA-CDF for the Financial Year 2026-27.
2026_RDPR_307945_2
e-NIT No. 04 REWJ of 2026-27 dated 16-04-2026
Open Tender
Civil Works
45 days
XEN REW JAMMU
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
MH 0515
₹5,820
4 May 2026
16 Apr 2026
30 Apr 2026
16 Apr 2026
29 Apr 2026
16 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Labour engaged for general site clearance | 5 | nos | 553 | ₹2,765 |
| 2 | Excavation in foundation trenches including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil. 1m from cutting edge. | - | CUM | - | - |
| 3 | CEMENT CONCRETE (CAST-IN-SITU) Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | - | cum | - | - |
| 4 | CEMENT CONCRETE (CAST-IN-SITU) Providing and laying Reinforcement cement concrete of specified grade including curing but excluding the cost of centring and shuttering. with: 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | - | cum | - | - |
| 5 | FORM WORK Centering and shuttering including strutting, propping etc. and removal of form for: (a) Foundations, footings, bases of columns etc. | - | sqm | - | - |
| 6 | (b) columns | - | sqm | - | - |
| 7 | Reinforcement for RCC work incld cutting, bending, straightening and placing etc comp. job | - | kg | - | - |
| 8 | Earth filling in layers including 5KM initial carriage | - | cum | - | - |
| 9 | Sand + Bajri for (25km) | 21 | cum | - | - |
| 10 | Cost of sign board ( Engraved Marvel plate) | - | No. | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
BOQ_998551.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid