Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance 248 1 CHHEDIPURWA STATION ROAD BEHIND GURU NANAK SCHOOL GONDA UTTAR PRADESH 271001 | GONDA | UTTAR PRADESH | 271001 | Admitted-Finance |
Tender Value
₹2 L
EMD Value
₹2,000
Closing Date
6 Oct 2023, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE EWC GONDA
SE EWC DEVIPATAN ZONE GONDA
06/EWC(G)/2023-24
2023_MVVNL_840689_2
NVS_05-06/EWC(G)/2023-24
Open Tender
Electrical Works
Item Rate
90 days
EWC GONDA
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,180
EE EWD GONDA
₹2,000
Yes
10 Oct 2023
19 Sept 2023
7 Oct 2023
19 Sept 2023
6 Oct 2023
19 Sept 2023
Amount
Safe Loading carriage including unloading & proper stacking of following store S/S materials from ESC Bahraich/JE store to 33/11 KV sub station Civil Line, Distt - Bahraich (15 Km Approx). All the material at Sl No. 1 shall be given by department and rest all the material including civil material will be arranged by the contractor itself. Any other material if required for completion of work which might not have been mentioned in bid document, shall be arranged by the contractor.
33 KV VCB 800A, 750MVA
11 KV 3x300 mm2 XLPE cable
33 KV Lightenning Arrestor
11 KV cable jointing kit indoor 3x300sq mm xlpe
11 KV cable jointing kit outdoor 3x300sq mm xlpe
MISCELLENIOUS WORK FOR INCREASING CAPACITY
Hiring of 3 phase diesel generator Set 02 nos. including Carriage,Loading, unloading operating charges (with fuel) at 33/11 KV Substation Under Construction in case L.T. Supply is not available near S/s within prescribed accessible limit. 63 KVA, There phase D/G Set for fabrication and other work .
Removal of existing 5 MVA Transformer and other accessories equipments.
Disconnecting HT cable connection from 33KV side & 11KV side of 05 MVA Power transformer for removing power transformer from plinth after proper shutdown. Dismantling of 11 KV cable support structure, Nutral stand etc.
Disconnecting copper flexible/Earthing strip from Power transformer neutral & Dismantling neutral earthing system to facilitate removal of Power transformer from plinth.
Disconnecting Earthing strip from body of 05 MVA Power transfomer.
Draining of transformer oil from conservator, radiators of existing 05 MVA Power T/F, into the dry & clean drums and stacking at the safe place in Substation outside of switchyard.( Empty drums shall be provided by contractor.)
Removal of conservator, radiators and other accessories from on existing 05 MVA Power transformer.
Safe shifting of 05 MVA Power transformer main body from plinth and other accessories to outside the switchyard at suitable place in Substation as assigned by concerning J.E/S.D.O. (Distribution).
Re-assembling of conservator, radiators and other accessories to existing 05 MVA Power transformer.
Re-filling the transfomer oil (old & used) in existing 5 MVA T/F.
Erection and Installation Of 33/11 KV 10 MVA POWER Transformer.
Erection and installation of 33/11 KV, 10 MVA Transformer in a leveled position on the Plinth. The work include shifting of transformer to the site of installation with in the Sub-Station premises, assembling, fixing and fitting of all accessories and filling of transformer oil to the desired level and ensuring that there is no leakage.Reconnecting of 2 nos of earthing strip to 10 MVA power T/F body.
After installation of 10 MVA power T/F old & dismentaled cable support will be refabricated & erected. The cable support should be in proper height that do not load the 11 kv side bushing of 10 MVA power T/F. Work include Cable support grouting in a block of size 300 x 300 x 700 mm complete. Re-connection of neutral earthing system with 2 nos of copper flexible/earthing strip to 10 MVA neutral bushing.
Water level earthing by Boring and lowering of G.I. pipe size 40 mm dia & thickness 2mm into the ground at 20 Mtr depth Job or upto the water level with the lower end of solid copper cone Approx 225 mm long and 750 gm in weight shall be provided and screwed in pipe as well as bringing out a continuous copper wire 6 SWG from the cone up to the ground surface where it will be bolted to the M.S. earth Strip for Transformer neutral connection, the earth strip will be welded to the G.I. pipe and neutral earthing support.
Neutral of 10 MVA Power T/F
Installation of 33 KV VCB
Dismentling of Old & damage 33 VCB and proper shifting to outside the switchyard in the Substation & Installation of New 33 kv VCB 800 amp capacity complete in all respect including commissioning and proper earthing of structure.(All the material shall be provided by contractor except 33 KV VCB.)
H.T. 3x300 XLPE Power Cable Work
Laying & dressing of 11 KV, 3x300 Sq.mm XLPE Cable underground from 10 MVA T/F to 11 KV incoming switchgear in the trench 450mm wide, 900mm deep, providing 150mm fine sand cushion bench and 150mm fine sand cushion above the cable. The cable shall be duly protected by 1st class bricks two either side and third on top of the cables. The cable shall be duly protected by 1st class bricks two either side and third on top of the cables, laid in series one after the other, the work includes supplying of fine sand and bricks, refilling and ramming of the left out soil, closing the trench and leveling. Spare cable shall be left and buried in the trench in the safe of rings at both ends. Cable laying work includes unrolling, cutting, meggering and sealing both end of the cable.
Fixing and erection of indoor type cable jointings kits suitable for 11 KV 3x300 sq mm XLPE cable .
Fixing and erection of outdoor type cable jointings kits suitable for 11 KV 3x300 sq mm XLPE cable .
Replacement of lightning Arrestors
Assembling and replacement/ mounting of three Nos. Lightening Arrestors on the L.A. structure/ complete with making earth connection (Separate) and line connections. The work includes fabrication for proper fixing if required.
Providing & Erection of M.S. Strip size 50x6mm for earthing of outdoor/ indoor equipment.(Material shall be provided by contractor.)
Testing & commissioning of Power T/F and switchgears / Panels providing required size of cables, numbers of technicians with proper testing equipments during commissioning & energization. (All Required Material shall be provided by contractor.)
Painting of Structure Painting of following structure with one coat of ready mixed primer and 2 coats of AL.Paint of good quality including cost of material, Labour and T&P complete in all respect. The work includes cost of all the material.
Cable Stand
Neutral Stand
VCB Structure
M/S AARADHYA AND ADHYATM ASSOCIATES
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .