Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.2 LAdmitted-Fee/PreQual/Technical/Finance | -40.00% | ₹3.2 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹3.4 L+₹14,339.27 (4.45%)Admitted-Fee/PreQual/Technical/Finance | -37.33% | ₹3.4 L+₹14,339.27 (4.45%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹3.4 L+₹17,186.71 (5.33%)Admitted-Fee/PreQual/Technical/Finance | -36.80% | ₹3.4 L+₹17,186.71 (5.33%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹3.6 L+₹33,519.18 (10.4%)Admitted-Fee/PreQual/Technical/Finance | -33.76% | ₹3.6 L+₹33,519.18 (10.4%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹3.7 L+₹44,586.59 (13.8%)Admitted-Fee/PreQual/Technical/Finance | -31.70% | ₹3.7 L+₹44,586.59 (13.8%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹5.4 L
EMD Value
₹10,740
Closing Date
27 Aug 2026, 6:00 pmClosed
Executive Engineer RRWD SMC
Executive Engineer RIGHT RIVER WORKS DIVISON SMC REGAL LANE LAL CHOWK
Construction oflane at wani mohalla lalbazar dewatering station via Ab rahim Dar to shabir ali
2026_HAUDD_319334_2
NOTICE INVITING ETENDER No. 24 of 2026-2027 Dated 04.08.2026 RRWD SMC
Open Tender
Civil Works
Percentage
60 days
lalbazar dewatering station via Ab rahim Dar to s
PLEASE REFER TO TENDER DOCUMENT
2 documents required · 2 mandatory
₹300
FA/CAO AC NO 0216010200000007
₹10,740
29 Aug 2026
4 Aug 2026
28 Aug 2026
5 Aug 2026
27 Aug 2026
5 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Engagement of Labourers for site clearance | 4 | No. | 553 | ₹2,212 |
| - | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge: 1:3:6 or richer mix (i/c equivalent design mix) | 1.06 | Cum | 1,725.2 | ₹1,828.71 |
| - | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 Sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil : 1 meter from cutting edge | 1.41 | Cum | 479.3 | ₹675.81 |
| - | Providing and laying Stone soling including compacting, watering including all carriages of material complete including Head Load | 9.22 | Cum | 850 | ₹7,837 |
| - | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 Cement: 4 fine sand: 8 grade stone aggregate 40mm nominal size). | 29.39 | Cum | 5,202.9 | ₹1,52,913.23 |
| - | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 4.11 | Cum | 5,733.6 | ₹23,565.1 |
| - | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 35.32 | Cum | 6,591.25 | ₹2,32,802.95 |
| - | Providing laying and fixing of PVC pipes of make grade B incld excavation and refilling complete job as directed at site including carriages up to site of work Camp. 200 mm | 100 | Rft | 330 | ₹33,000 |
| - | Providing laying and fixing of PVC pipes of make grade B incld excavation and refilling complete job as directed at site including carriages up to site of work Camp. 100 mm | 30 | Rft | 150 | ₹4,500 |
| - | Providing and Fixing of 450X450mm, Readymade polycrate manhole frame and cover of approved shape and standard size and as approved by EIC, including cost fittings and of all carriages complete job. | 5 | No. | 2,500 | ₹12,500 |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.88 MB
BOQ_1057267.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .