Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAccepted-AOC SANTINEKATAN ROAD BOLPUR | BOLPUR | ₹1.6 Cr | L1 | Accepted-AOC ACCEPTED |
| 2 | L2₹1.6 Cr+₹13,930.93 (0.09%)Rejected-Finance 138 CANNING STREET GROUND FLOOR KOLKATA | KOLKATA | WEST BENGAL | ₹1.6 Cr+₹13,930.93 (0.09%) | L2 | Rejected-Finance REJECTED |
| 3 | L3₹1.6 Cr+₹32,565.43 (0.21%)Rejected-Finance 344 1 SB GORAI ROAD HILL VIEW PARK NORTH ASANSOL | ASANSOL | WEST BENGAL | ₹1.6 Cr+₹32,565.43 (0.21%) | L3 | Rejected-Finance REJECTED |
| Sl No | Description | Qty | Unit | WEST BENGAL ENGINEERING CO. L2 | SINHA ELECTRICALS L1 | EASTERN INDIA SALES AND SERVICE L3 |
|---|---|---|---|---|---|---|
| 1.00 | PART - 'A'
Labour charges with bonus (8.33%), for operation of 2 (Two) Nos. 55 KW capacity Centrifugal Pump Motor set, 2 (Two) Nos. 18.5 KW capacity Centrifugal Pump Motor set, 2 (Two) Nos. 15 KW capacity Centrifugal Pump Motor set, Submersible Pump Motor set (6 Nos. of different capacity), operation of valves (6 nos. OHR) D.G. Set, Chlorination System along with 11/0.433 KV, 1 x 200 KVA Sub-Station having 2 NoS. 200 KVA Transformer, Breaker, Panels, Crane, L.T. Panel etc. complete with switching ON/OFF of outdoor & indoor lighting complete with operation of all other electrical / mechanical gadgets and ancillaries including guarding (Security personnel for Bolpur Water Supply Project) for 24 hours a day, sweeping and beautification of garden etc. all complete on daily basis as per direction of EIC.(w.e.f 01.08.2025 to 31.07.2026) [Total: 43 Nos.] | 365 | days | 30,263 ₹1,10,45,995 | 30,250 ₹1,10,41,250 Lowest | 30,290 ₹1,10,55,850 |
| 2.00 | Periodical inspection, twice in a month, by Electrical Supervisor having valid Supervisors’ certificate of competency from Directorate of Electricity (Licensing Board), Govt. of West Bengal or under any other State Govt. in India.
Each visit should be recorded in the Log Book (with date and time) to be supplied by the Agency and kept in the Pump House & Sub-station Building. The Supervisor requires to have thorough knowledge of all the electrical appliances to ascertain the healthy / fault free operational condition of each equipment i.e., pumps, motor, valves with actuators, flow / level, lightings, exhaust fans, HT & LT Panel Boards, Cables, Capacitors, Transformer, Battery and Battery charger along with in-house lighting system. All other necessary requirement to execute the maintenance work. | 24 | Time | 10,642 ₹2,55,408 | 10,600 ₹2,54,400 Lowest | 10,693 ₹2,56,632 |
| 3.00 | Calibration of all meters viz. Ammeter, Voltmeter, Kilowatt Meter etc. test of all relays, transformer oil (dielectric test) by agency approved by Directorate of Electricity/WBSEDCL / Any Power Generating Unit once in two months and submission of the Test Report to Department in each case. | 6 | Time | 1,52,110 ₹9,12,660 | 1,52,000 ₹9,12,000 Lowest | 1,52,173 ₹9,13,038 |
| 4.00 | Maintenance for upkeepment of Centrifugal pumps, Submersible Pump (8 Nos. Bore Wells), all panel boards, luminaries system both indoor & outdoor, compressor, D.G. sets, transformer, H.T & L.T switch Gear equipment in sub-station, chlorination system to ensure residual chlorine of 0.2PPM at the farthest point of pipe line, actuator valve & spares in pump house, bore well, greasing of OHR valves etc including pretty repairing with supply of all necessary minor spares (having cost of any individual item within `500.00) by contractor as per direction of EIC.
(a) ETP | 365 | days | 3,406 ₹12,43,190 | 3,400 ₹12,41,000 Lowest | 3,414 ₹12,46,110 |
| 5.00 | Beautification of the existing garden and the vacant place inside the compound with supplying of all manure, saplings, fertilizer and other materials and manpower required for plantation atleast 3 times (Summer, autumn, winter) by necessary seasonal flower plants, other decorative plants & other fruit plants, as and when required, supplying necessary fertilizer, bio chemical, manures, pesticides, Insecticides etc. including regular curing, watering, nursing, uprooting seasonal plants, propagation by cutting, turfing, pruning, weeding young plants, at Eastern WTP. | 12 | Month | 23,489 ₹2,81,868 | 23,450 ₹2,81,400 Lowest | 23,500 ₹2,82,000 |
| 6.00 | Upkeepment of CWR (1 Nos.) and OHR’s (6 Nos.) by washing, cleaning of silt mud from Chamber / cell by applying suitable disinfector (Bleaching powder as per I.S) including jungle cutting of CWR & OHRS premises (Once in two month) as per direction of EIC. | 6 | Time | 71,063 ₹4,26,378 | 71,000 ₹4,26,000 Lowest | 71,100 ₹4,26,600 |
| 7.00 | Transportation of empty chlorine Cylinder from Bolpur Water Supply Project to filling station by hired vehicle, unloading the same, loading the filled in chlorine gas cylinder after refilling the empty container and back to Bolpur worksite by a hired vehicle and unloading by providing all precautionary measures as required as per direction of EIC (Above cost includes the cost of refilling of the toner)
(a) Toner(930Kg.) | 4 | Nos. | 56,846 ₹2,27,384 | 56,805 ₹2,27,220 Lowest | 56,912 ₹2,27,648 |
| 8.00 | Operation of D.G. sets by supply of H.S. Diesel and lubricant for auxiliary power as and when required during power failure as per direction of EIC. (If power failure not occure within a weak it will run for one hour per week to keep the DG set in running condition.)
(a) Eastern WTP (180 KVA) | 180 | Hrs. | 4,307 ₹7,75,260 | 4,300 ₹7,74,000 Lowest | 4,312 ₹7,76,160 |
| 9.00 | Providing Supervisor on full time basis having following qualification and experience as mentioned below for supervising the entire eastern side of Bolpur water supply Project area by making close contact with PHED Officials and with Local Authorities in maintaining smooth supply of water.
Qualification for Supervisor
Diploma in Mechanical / Electrical Engineering having sufficient experience to handle / supervise same nature of job. | 365 | days | 1,208 ₹4,40,920 | 1,200 ₹4,38,000 Lowest | 1,215 ₹4,43,475 |
| 10.00 | Add: Cess @1% on sum of Item No. 1.00 to 9.00 | 1 | /Item | 1,56,090.63 ₹1,56,090.63 | 1,55,952.7 ₹1,55,952.7 Lowest | 1,56,275.13 ₹1,56,275.13 |
Tender Value
Refer Docs
EMD Value
₹3.2 L
Closing Date
28 Jul 2025, 12:00 pmClosed
EXECUTIVE ENGINEER, BOLPUR MECHANICAL DIVISION PHE
SRINIKETAN ROAD NEAR HOTEL MARK MEADOWS PO SRINIKETAN DIST BIRBHUM PIN 731236
Operation, Maintenance and Guarding of Eastern Water Treatment Plant including Low Lift pumping Machinery and allied works at the Eastern Side of Bolpur Water Supply Project (kfw Assisted) under Bolpur Mechanical Division P.H.E. Dte
2025_PHED_872953_1
PHED/14/EE/BOLMD/25-26
Open Tender
MECHANICAL
Item Rate
365 days
BOLPUR
Please refer Tender documents.
8 documents required · 8 mandatory
₹3.2 L
13 Nov 2025
2 Jul 2025
30 Jul 2025
3 Jul 2025
28 Jul 2025
3 Jul 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .