Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.8 LAdmitted-Finance | -0.22% | ₹5.8 L | L1 | Admitted-Finance |
| 2 | L2₹5.8 LAdmitted-Finance | -0.07% | ₹5.8 L | L2 | Admitted-Finance |
| 3 | L3₹5.8 LAdmitted-Finance | -0.01% | ₹5.8 L | L3 | Admitted-Finance |
Tender Value
₹5.8 L
EMD Value
₹58,226
Closing Date
11 May 2026, 12:00 pmClosed
EO, NP DHAKIA (MORADABAD)
NAGAR PANCHAYAT DHAKIA (MORADABAD)
Ward no- 02 and 12 from Jal compund to Samsad house tak HDPE 110mm dia pipe line vistar va marammat karye.
2026_DOLBU_1142964_5
24/N.P.DHAKIA/2026-27 DATE 20-04-2026
Open Tender
Civil Works
30 days
DHAKIA (MORADABAD)
Please refer Tender documents.
2 documents required · 2 mandatory
₹937
EXECUTIVE OFFICER, NP DHAKIA
₹58,226
15 May 2026
28 Apr 2026
12 May 2026
28 Apr 2026
11 May 2026
28 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantlling of Cement concrete work road…etc complete. (as per PWD S.I No-694/697) | - | sqm | - | - |
| 2 | Earth work Excavation for pipe line trench in ordinary soil,(lime clay or sand including lift up to 1.5m and lead up to 50.m and refilling watering ,ramming of excavated earth in to trench and disposal of surplus earth up to 50 m from the center of the foundation trench.. etc complete SOR No-2001 | - | Cu-m | - | - |
| 3 | Supply of the following size of HDPE pipe 6kg/cm2 pressure conforming to latest relevant I.S.S with HDPE coupler etc complete in all respect F.O.R destinaton. | - | Rm | - | - |
| 4 | Supply of HDPE/PVC Specials conforming to I.s-4984/2016 with solvent cement suitable for above PVC PIPE F.O.R Destination including all taxes and insurance. | - | Rm | - | - |
| 5 | Carting from the store (upto 8 km )the fllowing size of HDPE/DI PIPE and specials to the site of work lowering them in to trench and Laying true to alignment and grading including jointing testing of pipe line and including supply of jointing material such as nut bolts,rubber etc. but exculding cost of trenching and cutting of pipes etc.c (110mm dia HDPE pipe PN-06). | - | Rm | 1 | - |
| 6 | Making connection new pipe line to main pipe line 110mm dia including s/o all materials,labour,T&P etc complete | - | Nos | - | - |
| 7 | Supply of the following size of hand wheel opretor with Sluice valves destination including all tax and insurance.(100mm dia) .Quotation | - | Nos | - | - |
| 8 | Carting of D/F Sluice valves of following size to the site of work lowering them into already prepared trenches and Fixing them in position include supply of jointing material such as bolt nut ,rubber etc. (SOR-2445+2181) | - | Nos | 1 | - |
| 9 | Supply of all material labour T&P Etc.required and construction 750 x750x1000 mm size fire Hydrant chamber as per type design including supply and fixing the 500 mm dia CI manhole covert. of Sluice valve Chamber : Unit Estimate . | - | Nos | - | - |
| 10 | Provision for small Crossing Nala,road &culvert including shifting of telephone cable etc.along aligment of pipe line including supply .CI Tyton pipe and special and also jointing material their laying and jointinfg testing etc.complite : Unit Estimate. | - | Nos | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.85 MB
BOQ_2134759.xls
BOQ • 0.31 MB
T1_DHAKIA.pdf
Tender Documents • 3.07 MB
Download all tender documents and submit your bid