Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 LAccepted-Finance 13 138 SHAKTINAGAR SHUKLAGANJ UNNAO | UNNAO | UTTAR PRADESH | 209801 | L1 | Accepted-Finance OK | |
| 2 | L2₹5.2 L+₹2.3 L (78.6%)Accepted-Finance | L2 | Accepted-Finance OK | |
| 3 | L3₹5.7 L+₹2.7 L (92.8%)Accepted-Finance MAHUAR KIRAWALI AGRA | AGRA | AGRA | UTTAR PRADESH | L3 | Accepted-Finance OK |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
15 Jun 2020, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE
FATEHABAD
DEVIYA APDA WORK IN EDD BAH
2020_DVVNL_482058_1
11/EDC-II/FT/2020-21
Open Tender
Miscellaneous Works
Lump-sum
365 days
BAH
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
DVVNL
₹5,000
Yes
19 Jun 2020
10 Jun 2020
15 Jun 2020
10 Jun 2020
15 Jun 2020
10 Jun 2020
180 days
Carriage of following from 132 KV Taj Agra to 33/11 KV Substations through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70 Kms.) a) 8.5 Mtr. long PCC Poles.
Carriage of following from 132 KV Taj Agra to 33/11 KV Substations through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70 Kms.) a) 9 Mtr. long PCC Poles.
Carriage of following from 132 KV Taj Agra to 33/11 KV Substations through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70 Kms.) a) 9/11 Mtr. ST Poles.
Carriage of following from 132 KV Taj Agra to 33/11 KV Substations through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70 Kms.) 11 KV X-Arms, weasal conductor, G.I wire,Disc Insulators, Pin insulators, clamps and other required line material, if any.
Carriage of following from realted 33/11 KV Substations to site of work i.e. pit point through the Kacha and Pakka road by using manual labour or tractor/Hydra as per site requirment including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-10 Kms.) a) 8.5 Mtr. long PCC Poles.
Carriage of following from realted 33/11 KV Substations to site of work i.e. pit point through the Kacha and Pakka road by using manual labour or tractor/Hydra as per site requirment including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-10 Kms.)B) 9 Mtr. Long PCC Poles
Carriage of following from realted 33/11 KV Substations to site of work i.e. pit point through the Kacha and Pakka road by using manual labour or tractor/Hydra as per site requirment including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-10 Kms.)C) 9/11 Mtr. ST Poles.
Carriage of following from realted 33/11 KV Substations to site of work i.e. pit point through the Kacha and Pakka road by using manual labour or tractor/Hydra as per site requirment including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-10 Kms.)D) 11 KV X-Arms, weasal conductor, G.I wire,Disc Insulators, Pin insulators, clamps and other required line material, if any.
Cutting of kharanja/mettalic road/concrete portion while digging pit for erection of PCC/STP poles, stays rod and giving the exact shape after exicution work as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work.
Replacement of damaged poles of LT Lines by digging of pits and dismantling of all 11KV/LT accessories from the existing / damaged pole and erection of single new pole including fitting all accessories.
Replacement of damaged poles HT Lines by digging of pits and dismantling of all 11KV/33 KV accessories from the existing / damaged pole and erection & grouting of single new pole including fitting of all accessories.
Replacement of damaged poles 33 KV Lines by digging of pits and dismantling of all 11KV/33 KV accessories from the existing / damaged pole and erection & grouting of single new pole including fitting of all accessories.
Recostructions of damaged Double pole on 11/0.4 KV substation Lines by dismantling of T/f, opening of all accessories of LT S/S then removing damaged poles by digging earth pit(s), erecting new poles then fixing of of LT S/S accessories such as Dropper channel, T/F base, Disc Insulators with fitting and other 11 KV accessories etc., required for proper completion of work.
Recostructions of damaged Double pole(saction) structure on 11/33 KV Lines , opening of all accessories then removing damaged poles by digging earth pit(s), erecting new poles then fixing of accessories such as Dropper channel, T/F base, Disc Insulators with fitting and other 11/33 KV accessories etc., required for proper completion of work.
Erection and grouting of stays in 1:4:8 ratio cement, sand and stone ballst, its tightning, binding, nozelling etc. of stay wire with stay and stay clamp of pole as per requirement of work at site.
Fixing of earthing rod as per RESSPO manual and as per direction of supervising engineer.
Re- sagging and stringing of existing conductor in 11KV/ /LT line as per direction of supervising engineer including the repairing /replacing conductor due to fallen of pole and cost of arrangement of labour,T&P, carrier etc. required for proper completion of work A) ACSR Weasel Conductor.
Re- sagging and stringing of existing damaged conductor in 33 KV Lines line as per direction of supervising engineer including repairing /replacing conductor due to fallen of pole and the cost of arrangement of labour,T&P, carrier etc. required for proper completion of work A) ACSR Weasel Conductor.
Replacement of damaged following 11 KV accessories along with Nut & Bolt and all other related accesoories :- A) 11 KV X-Arm other then damged D.P/pole
B) 11 KV Disc Insulator with fitting
C) 11 KV Pin insulator with pin
D) F" Clamp/X-Arm Clamp/D.P.Clamp/L.T. Pin Clamp
E) L.T. insulator
Straightening of tilted single 8.5 Mtr. PCC Polesof existing lines by opening of line conductor, digging earth pit, straightning of pole, filling the earth pit after straightning then relaying the line conductor, as per direction of supervising engineer including the cost of arrangement of labour, T&P carrier etc. required for proper completion of work.
Straightening of tilted single 9/11 Mtr. ST Poles/R.S. Joyst in the existing lines by opening of line conductor, digging earth pit, straightning of pole, filling the earth pit after straightning then relaying the line conductor, as per direction of supervising engineer including the cost of arrangement of labour, T&P carrier etc. required for proper completion of work.
Cutting, chopping, triming of tree branches to clear the line route to give 2 mtr. horizontal and vertical clearance to the line coming in the route of different feeders as per direction of supervising engineer
Guarding / Re-Guarding of 11 KV line by laying, stringing, sagging and binding of 2 Nos. parallel GI wire 6 SWG after providing, fabrication and fixing of guarding angle and fabrication and fixing of X-guards (Tillis) of GI wire at distance of 3 Mtr.
Grouting if above supports with cement concrete(CC will br of cement,coarsc sand & brick ballast).grouting will be done with the helpof wooden/steel formers in blocks of size 450mm x 450 mm x 1/6 of the full length of the support in the CC 1:4:8 as per relevant drawing including back filling and proper ramming.
Numbering of poles by suitable paint. Paint & Concerning material shall be provided by the contractor at his own cost.
Vediography of All Poles Shall be made by the contractor of concerning site before starting the work and after the completion of work & the copy of vediography shall be submitted by the contractor at the time of Measuremnt/Payment.
Removal of Damaged/Burned LT Distribution Boxes & Fixing a new already/Newly erected pole for giving supply to consumer r by connecting consumer cable by using appropriated aluminium lug tape N& B Provided By Contractor as per requirment.
CHAUHAN ENTERPRISES
GARG ENTERPRISES
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .