Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Risposive |
| 2 | Accepted-Technical | Accepted-Technical Risposive |
Tender Value
₹21.1 L
EMD Value
₹2.1 L
Closing Date
17 Jan 2026, 12:00 pmClosed
DD, RTR/DFO Chitrakoot
Office of DD, RTR/DFO Chitrakoot
Construction of Pakka Checkdam at Itwan (Gulran Nala), Raipura Range
2026_UPDFW_1105502_1
2805/39-1-(Pakka Checkdam Itwan), Dt. 08.01.2026
Open Tender
Civil Works - Others
Percentage
30 days
Itwan (Gulran Nala), Raipura Range
Please refer Tender documents.
2 documents required · 2 mandatory
₹950
Divisional Forest Officer Chitrakoot
₹2.1 L
27 Jan 2026
12 Jan 2026
17 Jan 2026
12 Jan 2026
17 Jan 2026
12 Jan 2026
Site Cleaning
Earth work in cutting or filling for making approach road
Making Coffer dam in U/S site
Removal of slush from Nala Bed before excavation of saturated soil
Earth work inexcavation in mar kabar B.C. soil including lead 80.0m & lift 1.50 m
Excavation of soft rock/hard rock without blasting by jhummar hammer sabbar in foundation of crest
C.C. 1:3:6 cement sand & 40 mm gauge stone ballast
R.C.R. stone masonary 1:4 cement sand mortar
R.R. stone masonary in 1:6 cement sand mortar
P.C.C. 1:2:4 Cement sand & 20 mm guage stone grit
Raised pointing 1:2 Cement sand mortar
12 mm thick plaster with 1:3 Cement sand mortar
Dewatering during work by 8 H.P. diesel pump set
Dismelting of Coffer Dam 40% Saturated Soil
60% Slush
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.20 MB
TenderNoticeItwan.pdf
Tender Documents • 0.18 MB
BOQ_2039770.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .