Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.6 CrAccepted-AOC 00 BALAJI ENTERPRISES NEW ROAD NEW ROAD RATLAM MADHYA PRADESH 457001 | RATLAM | MADHYA PRADESH | 457001 | ₹9.6 Cr | L1 | Accepted-AOC Lowest agency |
| 2 | L2₹9.8 Cr+₹20.4 L (2.12%)Rejected-Finance | ₹9.8 Cr+₹20.4 L (2.12%) | L2 | Rejected-Finance Due to higher rates |
| 3 | L3₹9.9 Cr+₹26.0 L (2.70%)Rejected-Finance 10 KM STONE ON BARWALA AMBALA ROAD DIST PANCHKULA HARYANA 134112 | PANCHKULA | PANCHKULA | HARYANA | 134112 | ₹9.9 Cr+₹26.0 L (2.70%) | L3 | Rejected-Finance Due to higher rates |
Tender Value
Refer Docs
EMD Value
₹4 L
Closing Date
7 Feb 2023, 5:00 pmClosed
Project Director
I.S Bindra, Sector 63, Mohali
SUPPLY AND COMMISSIONING OF 21 LIFTS INCLUDING RELATED CIVIL AND ELECTRICAL WORKS ALONG WITH CAMC FOR 5 YEARS AT INTERNATIONAL CRICKET STADIUM AT MULLANPUR (NEW CHANDIGARH)
2023_PCA_95553_4
01/2023
Open Tender
Electrical Works
Item Rate
150 days
PCA, Mullanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹11,800
₹4 L
19 Oct 2023
20 Jan 2023
8 Feb 2023
20 Jan 2023
7 Feb 2023
20 Jan 2023
Amount
Design, Supply, installation, testing and commissioning of 22 passengers (1492 Kg) Gearless lifts with machine less room to serve G+3 upper floors with AC variable voltage & variable frequency (VVVF) Gearless drive, PMSM Motor Belt/ rope, complete with all standard accessories, full collective simplex controlled operation, centre opening power doors with door drive (Electric motor driven mechanism) sliding stainless steel doors, Automatic Rescue device system and built in intercom system without hand set & infra red curtain along with related civil and electrical works, all as specified herein under:- Note: 1. The Lifts shall be installed by the original eqpt manufacturer only.2. The Lifts shall be tested by IEM at the time of installation in the attendance of manufacturer.3.The contractor will carry out telephone wiring from all the lifts to the control room as suggested by the Engr-in-charge and installed telephone with any additional exchange/communication equipment if required. This control room should be able to communicate with all the lifts through telephone 24 hrs uninterrupted necessary UPS (Exide, Amaron make) etc will be provided by the contractor without any additional cost to the department along with BMS Compatibility and preferably NXL facility i.e. when door do not open fully at a destination floor, the doors close and the car automatically moves to the next or nearest floor where the doors will open. The complete lifts including testing, Commissioning and safety provisions shall be confirming to relevant IS codes.
Design, Supply, installation, testing and commissioning of 19 passengers (1292 KG) Gearless lifts with machine less room to serve G+3 upper floors with AC variable voltage & variable frequency (VVVF) Gearless drive, PMSM Motor Belt/ rope, complete with all standard accessories, full collective simplex controlled operation, centre opening power doors with door drive (Electric motor driven mechanism) sliding stainless steel doors, Automatic Rescue device system and built in intercom system without hand set & infra red curtain along with related civil and electrical works, all as specified herein under:- Note: 1. The Lifts shall be installed by the original eqpt manufacturer only.2. The Lifts shall be tested by IEM at the time of installation in the attendance of manufacturer.3.The contractor will carry out telephone wiring from all the lifts to the control room as suggested by the Engr-in-charge and installed telephone with any additional exchange/communication equipment if required. This control room should be able to communicate with all the lifts through telephone 24 hrs uninterrupted necessary UPS (Exide, Amaron make)etc will be provided by the contractor without any additional cost to the department along with BMS Compatibility and preferably NXL facility i.e. when door do not open fully at a destination floor, the doors close and the car automatically moves to the next or nearest floor where the doors will open. The complete lifts including testing, commissioning and safety provisions shall be confirming to relevant IS codes.
Design, Supply, installation, testing and commissioning of 17 passengers (1156 KG) Gearless lifts with machine less room to serve G+3 upper floors with AC variable voltage & variable frequency (VVVF) Gearless drive, PMSM Motor Belt/ rope, complete with all standard accessories, full collective simplex controlled operation, centre opening power doors with door drive (Electric motor driven mechanism) sliding stainless steel doors, Automatic Rescue device system and built in intercom system without hand set & infra red curtain along with related civil and electrical works, all as specified herein under:- Note: 1. The Lifts shall be installed by the original eqpt manufacturer only.2. The Lifts shall be tested by IEM at the time of installation in the attendance of manufacturer.3.The contractor will carry out telephone wiring from all the lifts to the control room as suggested by the Engr-in-charge and installed telephone with any additional exchange/communication equipment if required. This control room should be able to communicate with all the lifts through telephone 24 hrs uninterrupted necessary UPS (Exide, Amaron make)etc will be provided by the contractor without any additional cost to the department along with BMS Compatibility and preferably NXL facility i.e. when door do not open fully at a destination floor, the doors close and the car automatically moves to the next or nearest floor where the doors will open. The complete lifts including testing, commissioning and safety provisions shall be confirming to relevant IS codes.
Design, Supply, installation, testing and commissioning of 19 passengers (1292 KG) Gearless lifts with machine less room to serve G+2 upper floors with AC variable voltage & variable frequency (VVVF) Gearless drive, PMSM Motor Belt/ rope, complete with all standard accessories, full collective simplex controlled operation, centre opening power doors with door drive (Electric motor driven mechanism) sliding stainless steel doors, Automatic Rescue device system and built in intercom system without hand set & infra red curtain along with related civil and electrical works, all as specified herein under:- Note: 1. The Lifts shall be installed by the original eqpt manufacturer only.2. The Lifts shall be tested by IEM at the time of installation in the attendance of manufacturer.3.The contractor will carry out telephone wiring from all the lifts to the control room as suggested by the Engr-in-charge and installed telephone with any additional exchange/communication equipment if required. This control room should be able to communicate with all the lifts through telephone 24 hrs uninterrupted necessary UPS (Exide, Amaron make)etc will be provided by the contractor without any additional cost to the department along with BMS Compatibility and preferably NXL facility i.e. when door do not open fully at a destination floor, the doors close and the car automatically moves to the next or nearest floor where the doors will open. The complete lifts including testing, commissioning and safety provisions shall be confirming to relevant IS codes.
Design, Supply, installation, testing and commissioning of 17 passengers Gearless lifts with machine less room to serve G+2 upper floors with AC variable voltage & variable frequency (VVVF) Gearless drive, PMSM Motor Belt/ rope, complete with all standard accessories, full collective simplex controlled operation, centre opening power doors with door drive (Electric motor driven mechanism) sliding stainless steel doors, Automatic Rescue device system and built in intercom system without hand set & infra red curtain along with related civil and electrical works, all as specified herein under:- Note: 1. The Lifts shall be installed by the original eqpt manufacturer only.2. The Lifts shall be tested by IEM at the time of installation in the attendance of manufacturer.3.The contractor will carry out telephone wiring from all the lifts to the control room as suggested by the Engr-in-charge and installed telephone with any additional exchange/communication equipment if required. This control room should be able to communicate with all the lifts through telephone 24 hrs uninterrupted necessary UPS (Exide, Amaron make)etc will be provided by the contractor without any additional cost to the department along with BMS Compatibility and preferably NXL facility i.e. when door do not open fully at a destination floor, the doors close and the car automatically moves to the next or nearest floor where the doors will open. The complete lifts including testing, commissioning and safety provisions shall be confirming to relevant IS codes.
Design, Supply, installation, testing and commissioning of 8 passengers Gearless lifts with machine less room to serve G+2 upper floors with AC variable voltage & variable frequency (VVVF) Gearless drive, PMSM Motor Belt/ rope, complete with all standard accessories, full collective simplex controlled operation, centre opening power doors with door drive (Electric motor driven mechanism) sliding stainless steel doors, Automatic Rescue device system and built in intercom system without hand set & infra red curtain along with related civil and electrical works, all as specified herein under:- Note: 1. The Lifts shall be installed by the original eqpt manufacturer only.2. The Lifts shall be tested by IEM at the time of installation in the attendance of manufacturer.3.The contractor will carry out telephone wiring from all the lifts to the control room as suggested by the Engr-in-charge and installed telephone with any additional exchange/communication equipment if required. This control room should be able to communicate with all the lifts through telephone 24 hrs uninterrupted necessary UPS etc will be provided by the contractor without any additional cost to the department along with BMS Compatibility and preferably NXL facility i.e. when door do not open fully at a destination floor, the doors close and the car automatically moves to the next or nearest floor where the doors will open
Design, Supply, installation, testing and commissioning of 8 passengers Gearless lifts with machine less room to serve G+2 upper floors with AC variable voltage & variable frequency (VVVF) Gearless drive, PMSM Motor Belt/ rope, complete with all standard accessories, full collective simplex controlled operation, centre opening power doors with door drive (Electric motor driven mechanism) sliding stainless steel doors, Automatic Rescue device system and built in intercom system without hand set & infra red curtain along with related civil and electrical works, all as specified herein under:- Note: 1. The Lifts shall be installed by the original eqpt manufacturer only.2. The Lifts shall be tested by IEM at the time of installation in the attendance of manufacturer.3.The contractor will carry out telephone wiring from all the lifts to the control room as suggested by the Engr-in-charge and installed telephone with any additional exchange/communication equipment if required. This control room should be able to communicate with all the lifts through telephone 24 hrs uninterrupted necessary UPS (Exide, Amaron make)etc will be provided by the contractor without any additional cost to the department along with BMS Compatibility and preferably NXL facility i.e. when door do not open fully at a destination floor, the doors close and the car automatically moves to the next or nearest floor where the doors will open. The complete lifts including testing, commissioning and safety provisions shall be confirming to relevant IS codes.
First class burnt brick work laid in cement sand mortar 1:4 in first storey up to 4 mtr above plinth level.
Extra for work done in additional storey up to 4 mtr above the top of structural roof of lower storey for Brick work/ concrete work.
Reinforced cement concrete M-30 and vibrated by needle vibrator but excluding steel reinforcement centering and shuttering in superstructure.
Cold twisted deformed (Ribbed/ Tor steel) Bars (Fe 550 grade as per IS 1786-2008) , for R.C.C works, where not including in the complete rate of RCC including binding, bending and placing in position complete
20mm thick cement plaster 1:4 in two coat work
Centering and shuttering for sides and soffits of beam, beams, launching girders, bressumers, lintels.
Matching Coloured Granite stone 15mm to 20mm thick in skirting, risers of steps, dado walls and pillars laid in 12.5mm thick cement mortar 1:3 (1 cement 3 coarse sand) and jointed with neat cement slurry mixed with pigment to match the shade of stone, including rubbing and polishing including labour for fixing dowel pins and cramps complete in all respect as per EIC.
White washing (Three coat)
M/S LIFTSQUARE
Dessons Autotech Private Limited
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .