| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.9 CrAccepted-AOC | ₹24.9 Cr | L1 | Accepted-AOC Awarded being L1 bidder and duly approved. |
| 2 | L2₹26.1 CrRejected-Finance | ₹26.1 Cr | L2 | Rejected-Finance Rejected not being L1 bidder and duly approved. |
| 3 | L3₹26.3 CrRejected-Finance | ₹26.3 Cr | L3 | Rejected-Finance Rejected not being L1 bidder and duly approved. |
| 4 | L4₹26.4 CrRejected-Finance Q NO A 49 10 VINDHYA COLONY PINORA NOWROZABAD MADHYA PRADESH 484555 | UMARIA | MADHYA PRADESH | 484555 | ₹26.4 Cr | L4 | Rejected-Finance Rejected not being L1 bidder and duly approved. |
| 5 | L5₹26.9 CrRejected-Finance GURUDWARA ROAD BISHRAMPUR BISHRAMPUR BISHRAMPUR SURGUJA CHHATTISGARH 497001 | SURGUJA | CHHATTISGARH | 497001 | ₹26.9 Cr | L5 | Rejected-Finance Rejected not being L1 bidder and duly approved. |
| Sl No | Description | Qty | Unit | SURGUJA BRICKS INDUSTRIES L5 | AADITYA CONSTRUCTION L2 | K D SINGH L3 | ASHOK KUMAR AGRAWAL L4 | Baghel Infrastructures (P) Ltd L8 | SHREE RAM CONSTRUCTION COMPANY L1 | BHAAVINI RCPL JV L6 | SG VKJ JV L7 | MOHAN PODDAR L9 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00ROAD | ||||||||||||
| 1.01 | Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 metres. Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location with all lifts and lead upto 1000m as per relevent clauses of section-300 of specification. | 22,755 | cum | 40 ₹9.1 L | 60 ₹13.7 L | 70 ₹15.9 L | 42 ₹9.6 L | 70 ₹15.9 L | 30 ₹6.8 L | 90 ₹20.5 L | 115.7 ₹26.3 L | 60 ₹13.7 L |
| 1.02 | Embankment Construction with Material Obtained from Borrow Pits Construction of embankment with approved material having CBR>7 obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-1, 300-2 and as per relevent clauses of section-300. | 22,755 | cum | 125 ₹28.4 L | 150 ₹34.1 L | 100 ₹22.8 L | 110 ₹25.0 L | 70 ₹15.9 L | 290 ₹66.0 L | 140 ₹31.9 L | 80.99 ₹18.4 L | 120 ₹27.3 L |
| 1.03 | Supply of following material including all lead and stacking etc. complete. Crusher stone dust | 10,545 | cum | 800 ₹84.4 L | 1,000 ₹1.1 Cr | 1,000 ₹1.1 Cr | 610 ₹64.3 L | 600 ₹63.3 L | 500 ₹52.7 L | 900 ₹94.9 L | 347.1 ₹36.6 L | 600 ₹63.3 L |
| 1.04 | Laying & spreading of stone dust complete. | 10,545 | cum | 50 ₹5.3 L | 150 ₹15.8 L | 700 ₹73.8 L | 60 ₹6.3 L | 100 ₹10.5 L | 50 ₹5.3 L | 200 ₹21.1 L | 57.85 ₹6.1 L | 50 ₹5.3 L |
| 1.05 | Granular Sub-base with Well Graded Material (CBR>30 or more) (Table:- 400-1 & Table 400-2) Construction of granular sub-base by providing well graded material like natural sand crushed gravel or crushed stone having CBR >30, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator or plant mix method at OMC, and compacting with vibratory rollers of 80 to 100 kN static weight to achieve the desired density, complete as per Clause 401 of Specification. (GR-II) | 21,090 | cum | 1,000 ₹2.1 Cr | 1,150 ₹2.4 Cr | 900 ₹1.9 Cr | 925 ₹2.0 Cr | 1,600 ₹3.4 Cr | 800 ₹1.7 Cr | 1,400 ₹3.0 Cr | 1,388.4 ₹2.9 Cr | 1,200 ₹2.5 Cr |
| 1.06 | Granular Sub-base with Well Graded Material (CBR>30 or more) (Table:- 400-1 & Table 400-2) Construction of granular sub-base by providing well graded material like natural sand crushed gravel or crushed stone having CBR >30, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator or plant mix method at OMC, and compacting with vibratory rollers of 80 to 100 kN static weight to achieve the desired density, complete as per Clause 401 of Specification. (GR-III) | 21,090 | cum | 1,000 ₹2.1 Cr | 1,150 ₹2.4 Cr | 900 ₹1.9 Cr | 925 ₹2.0 Cr | 1,600 ₹3.4 Cr | 1,800 ₹3.8 Cr | 1,450 ₹3.1 Cr | 1,272.7 ₹2.7 Cr | 1,200 ₹2.5 Cr |
| 1.07 | Dry Lean Cement Concrete Sub- base Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8- 10 tonnes vibratory roller, finishing and curing as per clause 601 of specification complete in all respect. | 10,545 | cum | 2,600 ₹2.7 Cr | 2,050 ₹2.2 Cr | 2,200 ₹2.3 Cr | 2,650 ₹2.8 Cr | 3,000 ₹3.2 Cr | 3,500 ₹3.7 Cr | 2,300 ₹2.4 Cr | 2,545.4 ₹2.7 Cr | 2,900 ₹3.1 Cr |
| 1.08 | Cement Concrete Pavement Construction of un-reinforced, dowel jointed, plain cement concrete pavement M-40 grade concrete over a prepared sub base with cement , coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, admixtures as approved, curing compound, finishing to lines and grades as per drawing as per IRC 15 2011 and as per relevant clauses of section 602 of specifications complete but excluding cost of steel in dowel bar and tie rods etc. | 12,210 | cum | 5,300 ₹6.5 Cr | 4,210 ₹5.1 Cr | 5,500 ₹6.7 Cr | 4,700 ₹5.7 Cr | 4,950 ₹6.0 Cr | 7,500 ₹9.2 Cr | 4,500 ₹5.5 Cr | 4,975.1 ₹6.1 Cr | 5,100 ₹6.2 Cr |
| 1.09 | Add extra for the cost of steel in dowel bar and tie rod including craddle, laps etc complete required as per design. Mild steel | 109.89 | MT | 50,000 ₹54.9 L | 45,000 ₹49.5 L | 65,000 ₹71.4 L | 59,000 ₹64.8 L | 65,000 ₹71.4 L | 10,000 ₹11.0 L | 50,000 ₹54.9 L | 63,635 ₹69.9 L | 65,000 ₹71.4 L |
Tender Value
₹35.1 Cr
EMD Value
₹43.9 L
Closing Date
3 May 2025, 5:00 pmClosed
General Manager (Civil)/HoD, SECL
Office of G.M. (Civil)/HOD, SECL Bhawan, Seepat Road, Bilaspur, CG, PIN-495006. Contact No. 09422293565/09425531210/07880128817 email-gmcivilhod.secl(at)gmail.com and/or gmcivil.secl (at) coalindia.in
Construction of concrete approach road with median divider, toe wall, box culvert bridge and display board for Jhiria west OCP of Hasdeo Area including 5 (Five) years Comprehensive Maintenance (2nd Call).
2025_SECL_334165_1
GM(C)/SECL/BSP/e-T/HSD-CC Road/2025-26/02 dated 15.04.2025
Open Tender
Civil Works - Roads
2005 days
Jhiria west OCP, Hasdeo Area, C.G.
As Per NIT.
5 documents required · 5 mandatory
₹43.9 L
8 Dec 2025
16 Apr 2025
5 May 2025
16 Apr 2025
3 May 2025
17 Apr 2025
16 Apr 2025 - 26 Apr 2025
Amount
Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 metres. Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location with all lifts and lead upto 1000m as per relevent clauses of section-300 of specification.
Embankment Construction with Material Obtained from Borrow Pits Construction of embankment with approved material having CBR>7 obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-1, 300-2 and as per relevent clauses of section-300.
Supply of following material including all lead and stacking etc. complete. Crusher stone dust
Laying & spreading of stone dust complete.
Granular Sub-base with Well Graded Material (CBR>30 or more) (Table:- 400-1 & Table 400-2) Construction of granular sub-base by providing well graded material like natural sand crushed gravel or crushed stone having CBR >30, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator or plant mix method at OMC, and compacting with vibratory rollers of 80 to 100 kN static weight to achieve the desired density, complete as per Clause 401 of Specification. (GR-II)
Granular Sub-base with Well Graded Material (CBR>30 or more) (Table:- 400-1 & Table 400-2) Construction of granular sub-base by providing well graded material like natural sand crushed gravel or crushed stone having CBR >30, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator or plant mix method at OMC, and compacting with vibratory rollers of 80 to 100 kN static weight to achieve the desired density, complete as per Clause 401 of Specification. (GR-III)
Dry Lean Cement Concrete Sub- base Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8- 10 tonnes vibratory roller, finishing and curing as per clause 601 of specification complete in all respect.
Cement Concrete Pavement Construction of un-reinforced, dowel jointed, plain cement concrete pavement M-40 grade concrete over a prepared sub base with cement , coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, admixtures as approved, curing compound, finishing to lines and grades as per drawing as per IRC 15 2011 and as per relevant clauses of section 602 of specifications complete but excluding cost of steel in dowel bar and tie rods etc.
Add extra for the cost of steel in dowel bar and tie rod including craddle, laps etc complete required as per design. Mild steel
Add extra for the cost of steel in dowel bar and tie rod including craddle, laps etc complete required as per design. TOR steel
Median (Divider), Toe Wall, Box Culvert, Bridge, Display Board
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources)
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fllets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement:1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Reinforced cement concrete work in beams, suspended foors, roofs having slope up to 15* landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to foor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources).
Centering and shuttering including strutting, propping etc. and removal of form forFoundations, footings, bases of columns, etc. for mass concrete.
Centering and shuttering including strutting, propping etc. and removal of form forWalls any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Centering and shuttering including strutting, propping etc. and removal of form forSuspended floors, roofs, landings, balconies and access platform
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Cold twisted bars
Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
12 mm cement plaster of mix :1:4 (1 cement: 4 fine sand)
Finishing walls with textured exterior paint of required shade :New work (Two or more coats applied @ 3.28 ltr/10 sqm) over and including priming coat of exterior primer applied @ 2.20kg/10 sqm
Painting and letter writing, slogans on boards including cost of all materials and labour etc. All complete as per instruction of Engineer-in-charge.
Painting of structual steel works two or more coats over and in/c one coat of ready mixed red oxide zink chromate primer with approved brand synthetic enamel paint as per instruction of the Engg. In charge.
Total impact of GST for the purpose of CTC
AADITYA CONSTRUCTION (BID ID -1150897)
K D SINGH (BID ID -1151371)
ASHOK KUMAR AGRAWAL (BID ID -1150047)
SURGUJA BRICKS INDUSTRIES (BID ID -1150778)
BHAAVINI RCPL JV (BID ID -1151576)
SG VKJ JV (BID ID -1151220)
Baghel Infrastructures (P) Ltd (BID ID -1150982)
MOHAN PODDAR (BID ID -1151502)
stage.html
html • 0.07 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid