Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAdmitted-Finance J 38 ASHIANA SHRI RAJ BHAWAN KANPUR ROAD ASHIANA LUCKNOW UTTAR PRADESH 226012 | LUCKNOW | UTTAR PRADESH | 226012 | ₹1.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.2 Cr+₹9.9 L (8.74%)Admitted-Finance | ₹1.2 Cr+₹9.9 L (8.74%) | L2 | Admitted-Finance |
| 3 | L3₹1.3 Cr+₹16.1 L (14.2%)Admitted-Finance 0 RAGHAVPUR ORHA TIKAMGARH DISTRICT TIKAMGARH MADHYA PRADESH | TIKAMGARH | TIKAMGARH | MADHYA PRADESH | ₹1.3 Cr+₹16.1 L (14.2%) | L3 | Admitted-Finance |
| 4 | L4₹1.5 Cr+₹36.6 L (32.2%)Admitted-Finance C 6 177 BARG BARIAR SINGH CHHETGUNJ VARANSI VARANSI VARANSI VARANASI UTTAR PRADESH 221101 | VARANASI | UTTAR PRADESH | 221101 | ₹1.5 Cr+₹36.6 L (32.2%) | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | ROHINI TRANSPORT CORPORATION L4 | DeviMaaShakti Constructions and Consultancy Services Pvt Ltd L1 | M/S CHAMPALAL JAIN L2 | M/s Suresh Chand Gupta L3 |
|---|---|---|---|---|---|---|---|
| 1.00Maintenance of Railway track and other related capital works in private siding & Rail Yard of Coal Handling Plant as per Rly./ RDSO recommendation and uprooting and cutting of unwanted grass, bushes, vegetation, trees and cleaning of drains lying in Jawaharpur TPS railway yard and its disposal in low lying area. | |||||||
| 1.01 | Daily, weekly,monthly routine/ breakdown maintenance of Railway Track Private Siding and shunting yard rail track of JTPS, Malawan, Etah. This will include the works mentioned as per scope of work | 1,056 | Per Km/ Month | 12,160 ₹1,28,40,960 | 9,875 ₹1,04,28,000 Lowest | 9,900 ₹1,04,54,400 | 10,800 ₹1,14,04,800 |
| 2.00 | Reconditioning of Tongue rail | 18 | Nos | 3,500 ₹63,000 | 2,500 ₹45,000 Lowest | 5,000 ₹90,000 | 6,600 ₹1,18,800 |
| 3.00 | Reconditioning of Points and Crossing | 18 | Nos | 7,000 ₹1,26,000 | 2,500 ₹45,000 Lowest | 5,000 ₹90,000 | 6,800 ₹1,22,400 |
| 4.00Schedule up keepingof track and other civil works. | |||||||
| 4.01 | Cleaning of grass/rank vegetation/tree and saplings along the length of railway track, on either side of railway track ,upto a distance of 5mtr and specially where curve and crossing exist 5.0 mtr on outer side and upto 5.0 mtr on inner side of railway track the area shall be thoroughly cleared of all grass/plants/shrubs/vegetation growth etc.
[44000mx10m(5mtr each side)]=440000 sqm | 44,000 | M² | 15 ₹6,60,000 | 3 ₹1,32,000 | 4 ₹1,76,000 | 2 ₹88,000 Lowest |
| 4.02 | Cleaning of track from mud’s, landslides, fallen tree and disposal of earth/rubbish outside the track area as directed by the Engineer-in-charge up to a lead of 2 km including all leads & lifts of 10 M by mechanical transport including dressing the disposed earth neatly. | 2,500 | M³ | 120 ₹3,00,000 | 3 ₹7,500 Lowest | 100 ₹2,50,000 | 85 ₹2,12,500 |
| 4.03 | Earth work in excavation over areas (excluding 30 cm in depth, 1.5 m in width as well as 10 sq.m on plan including transportation of excavated earth and filling in rain cuts fissures cess repair on formation level in layers not exceeding 20 cm. In depth, consoli - dation each layer by remaining and watering including all leads & lifts (payment shall be made by measurement of borrow pits). | 5,000 | M³ | 75 ₹3,75,000 Lowest | 75 ₹3,75,000 Lowest | 100 ₹5,00,000 | 170 ₹8,50,000 |
| 4.04 | Painting of the caution marks and the boards with synthetic enamel paint of first quality including a coat of primer on new work (DSR code 13.62.1). | 75 | M² | 50 ₹3,750 Lowest | 150 ₹11,250 | 1,000 ₹75,000 | 65 ₹4,875 |
| 4.05 | Lettering with black Japan paint of approved brand &manufacturer (DSR code 13.71). | 500 | Letter/cm Hight | 25 ₹12,500 | 150 ₹75,000 | 250 ₹1,25,000 | 2 ₹1,000 Lowest |
Tender Value
₹1.4 Cr
EMD Value
₹2.9 L
Closing Date
1 Jul 2023, 2:00 pmClosed
Superintending Engineer
E and MCC-VIII, JTPS, Malawan Etah
Work of routine, preventive, breakdown maintenance and cleaning work of Rail Track at JTPS Etah.
2023_RVUNL_806258_1
T-01/EMCC-8/EMCD-21/JTPS/23-24
Open Tender
Repair and Maintenance Works
Fixed-rate
730 days
E and MCC-VIII, JTPS Malawan Etah
As per Tender Specification
3 documents required · 3 mandatory
₹11,800
Dy. C.A.O.,CFA and BO
₹2.9 L
E and MCC-VIII, JTPS, Malawan Etah
19 Jul 2023
26 May 2023
4 Jul 2023
26 May 2023
1 Jul 2023
26 May 2023
26 May 2023 - 1 Jul 2023
14 Jun 2023
Amount
Maintenance of Railway track and other related capital works in private siding & Rail Yard of Coal Handling Plant as per Rly./ RDSO recommendation and uprooting and cutting of unwanted grass, bushes, vegetation, trees and cleaning of drains lying in Jawaharpur TPS railway yard and its disposal in low lying area.
Daily, weekly,monthly routine/ breakdown maintenance of Railway Track Private Siding and shunting yard rail track of JTPS, Malawan, Etah. This will include the works mentioned as per scope of work
Reconditioning of Tongue rail
Reconditioning of Points and Crossing
Schedule up keepingof track and other civil works.
Cleaning of grass/rank vegetation/tree and saplings along the length of railway track, on either side of railway track ,upto a distance of 5mtr and specially where curve and crossing exist 5.0 mtr on outer side and upto 5.0 mtr on inner side of railway track the area shall be thoroughly cleared of all grass/plants/shrubs/vegetation growth etc. [44000mx10m(5mtr each side)]=440000 sqm
Cleaning of track from mud’s, landslides, fallen tree and disposal of earth/rubbish outside the track area as directed by the Engineer-in-charge up to a lead of 2 km including all leads & lifts of 10 M by mechanical transport including dressing the disposed earth neatly.
Earth work in excavation over areas (excluding 30 cm in depth, 1.5 m in width as well as 10 sq.m on plan including transportation of excavated earth and filling in rain cuts fissures cess repair on formation level in layers not exceeding 20 cm. In depth, consoli - dation each layer by remaining and watering including all leads & lifts (payment shall be made by measurement of borrow pits).
Painting of the caution marks and the boards with synthetic enamel paint of first quality including a coat of primer on new work (DSR code 13.62.1).
Lettering with black Japan paint of approved brand &manufacturer (DSR code 13.71).
Quarterly Cleaning of drainage trenches lying along the rail track in CHP area and disposal of garbage in low lying area.
Cartage of Ash/Malwa/Silt/sludge etc. By tractor trolley up to a distance of 2 – 3 KM, including loading on tractor – trolley with lead of 100M and lift up to 1.5M, cartage, unloading, including cost of all labour, T&P tractor trolley driver etc.
M/S CHAMPALAL JAIN
M/s Suresh Chand Gupta
ROHINI TRANSPORT CORPORATION
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
TENDERSPECIFICATIONTRACMAINTENANCET-01.pdf
Tender Documents • 1.26 MB
BOQ_1349991.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .