Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.2 LAccepted-AOC | L1 | Accepted-AOC AGG WITH L1 | |
| 2 | L2₹21.3 L+₹1.1 L (5.30%)Rejected-AOC | L2 | Rejected-AOC AGG WITH L1 | |
| 3 | L3₹21.6 L+₹1.3 L (6.53%)Rejected-AOC | L3 | Rejected-AOC AGG WITH L1 | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | Mudit Lal Goel Contractor L2 | BALAJI TRADERS L3 | AASHTA CONSTRUCTION L1 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in foundation in dry ordinary soil including lift upto 1.5m and lead up to 30m and including filling, watering and ramming excavated earth into the trenches or into the space between the structure and the sides of foundation trenches or into the plinth with removal and disposal of surplus earth as directed by the Engineer In Charge up to distance of 30m from the foundation trenches. | 534.8 | cum | 92 ₹49,201.6 | 80 ₹42,784 Lowest | 80 ₹42,784 Lowest |
| 2.00 | Providing & Laying C.C. 1:3:6 in foundation with crushed aggregate & coarse sand with all cost of material, T&P and labour complete. | 40.03 | cum | 4,800 ₹1,92,144 | 4,390 ₹1,75,731.7 | 3,600 ₹1,44,108 Lowest |
| 3.00 | Brick (M-150) work in 1:4 cement and coarse sand mortar with cost of material including T&P, labour, etc. as per directed by Engineer in charge. | 1.9 | cum | 5,200 ₹9,880 | 5,000 ₹9,500 | 4,500 ₹8,550 Lowest |
| 4.00 | Providing & Fixing Centering and shuttering for R.C.C. work including placing in position & removing complete. | 313.44 | sqm | 680.8 ₹2,13,393.36 | 600 ₹1,88,067 | 575 ₹1,80,230.88 Lowest |
| 5.00 | S/Fixing reinforcement for R.C.C. including bending, binding and placing in position with all cost of material, T&P and labour complete. | 10.57 | M.T. | 67,000 ₹7,08,472.89 Lowest | 70,000 ₹7,40,195.55 | 70,000 ₹7,40,195.55 |
| 6.00 | Providing & Laying R.C.C. 1:1:2 in slab with crushed stone ballast and coarse sand including cost of material, T&P and labour complete. | 120.36 | cum | 6,240 ₹7,51,046.4 | 6,599.05 ₹7,94,261.66 | 4,850 ₹5,83,746 Lowest |
| 7.00 | Providing & Laying C.C. 1:2:4 in slab wearing coatwith all cost of material, T&P and labour complete. | 19.24 | cum | 5,269.76 ₹1,01,390.18 | 5,500 ₹1,05,820 | 3,500 ₹67,340 Lowest |
| 8.00 | S/Fixing wheel guard of size 100x150x80 mm with all cost of material, T&P and labour complete. | 4 | Nos. | 1,426 ₹5,704 | 1,100 ₹4,400 | 200 ₹800 Lowest |
| 9.00 | S/Fixing marble year plate of size 300x250x20 mmwith all cost of material, T&P and labour complete. | 1 | No. | 920 ₹920 | 246 ₹246 Lowest | 250 ₹250 |
| 10.00 | Supplying & fixing of P.V.C. Pipe 75 mm dia and 0.50 mtr. longwith all cost of material, T&P and labour complete. | 12 | Nos. | 64.4 ₹772.8 | 53 ₹636 Lowest | 500 ₹6,000 |
Tender Value
₹23 L
EMD Value
₹2.3 L
Closing Date
6 Feb 2026, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE MDGC MUZAFFARNAGAR
EE MDGC MUZAFFARNAGAR
Construction of VRB at Km 3.300 of Bastam Dy
2026_UPIDC_1106465_6
TN-10/EE/2025-26
Open Tender
Civil Works
Item Wise
15 days
as per tender notice
as per tender notice
2 documents required · 2 mandatory
₹854
₹2.3 L
20 Feb 2026
31 Jan 2026
6 Feb 2026
31 Jan 2026
6 Feb 2026
31 Jan 2026
Earth work in foundation in dry ordinary soil including lift upto 1.5m and lead up to 30m and including filling, watering and ramming excavated earth into the trenches or into the space between the structure and the sides of foundation trenches or into the plinth with removal and disposal of surplus earth as directed by the Engineer In Charge up to distance of 30m from the foundation trenches.
Providing & Laying C.C. 1:3:6 in foundation with crushed aggregate & coarse sand with all cost of material, T&P and labour complete.
Brick (M-150) work in 1:4 cement and coarse sand mortar with cost of material including T&P, labour, etc. as per directed by Engineer in charge.
Providing & Fixing Centering and shuttering for R.C.C. work including placing in position & removing complete.
S/Fixing reinforcement for R.C.C. including bending, binding and placing in position with all cost of material, T&P and labour complete.
Providing & Laying R.C.C. 1:1:2 in slab with crushed stone ballast and coarse sand including cost of material, T&P and labour complete.
Providing & Laying C.C. 1:2:4 in slab wearing coatwith all cost of material, T&P and labour complete.
S/Fixing wheel guard of size 100x150x80 mm with all cost of material, T&P and labour complete.
S/Fixing marble year plate of size 300x250x20 mmwith all cost of material, T&P and labour complete.
Supplying & fixing of P.V.C. Pipe 75 mm dia and 0.50 mtr. longwith all cost of material, T&P and labour complete.
Supplying & laying dry brick on edge soling on floor.with all cost of material, T&P and labour complete.
Painting with Synthetic Enamel paint of approved brand and manufacture of required colour to give an even shade.
Painting letters upto 8cm with approved brand Enamel paint of superior quality i/c cost of material including T&P, labour, etc. as per directed by Engineer in charge.
Note : The Quantities written above may increase or decrease as per requirement & site condition
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.55 MB
Tendernotice_2.pdf
PDF • 1.94 MB
BOQ_2052148.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .