Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.5 LAdmitted-Finance | -1.00% | ₹1.5 L | L1 | Admitted-Finance |
| 2 | L2₹1.5 L+₹1,503.75 (1.01%)Admitted-Finance | +0.00% | ₹1.5 L+₹1,503.75 (1.01%) | L2 | Admitted-Finance |
| 3 | L3₹1.5 L+₹3,007.50 (2.02%)Admitted-Finance | +1.00% | ₹1.5 L+₹3,007.50 (2.02%) | L3 | Admitted-Finance |
Tender Value
₹1.5 L
EMD Value
₹3,000
Closing Date
11 Sept 2026, 4:30 pmClosed
Er. fayaz Ahmed
Executive engineer REW Ramban
AS PER NIT
2026_RDPR_323475_25
e-Nit 45 of REW Ramban(CD PYT)
Open Tender
Civil Works
Percentage
ramban
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Executive engineer REW Ramban
₹3,000
Yes
14 Sept 2026
5 Sept 2026
12 Sept 2026
5 Sept 2026
11 Sept 2026
5 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earh work in excavation by manual means over areas ( exceeding 30 cm and up to 1.5 mtr in width and 1.5 mtr in depth as well as 10 sqm on plan ) incl. disposal of excavated earth up to 1 mtr from cutting edge, disposed earth to be levelled and neatly dressed in AKS=80% OR=20% | 11.04 | cum | 662.38 | ₹7,312.68 |
| 2 | Dry stone pitching(any thickness) incl.cost of stones | 6.03 | cum | 1,472.1 | ₹8,876.76 |
| 3 | provinding and laying in position cement concrete 1:3:6 miX including curing but excluding cost of shuttering in foundation and plinth using 20mm Nallah stone aggregate | 16.14 | cum | 5,733.6 | ₹92,540.3 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form work for:walls etc | 25.4 | sqm | 286.35 | ₹7,273.29 |
| 5 | Carriage of Cement | 3.55 | MT | 527.72 | ₹1,873.41 |
| 6 | Carriage of Sand | 3.49 | cum | 1,788.71 | ₹6,242.6 |
| 7 | Carriage of Aggregates | 14.36 | cum | 1,349.91 | ₹19,384.71 |
| 8 | Carriage of Stones | 6.03 | cum | 642.01 | ₹3,871.32 |
| 9 | P/F of CIB | 1 | no | 3,000 | ₹3,000 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.15 MB
BOQ_1088878.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .