Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.4 LAccepted-AOC | ₹17.4 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹17.6 LRejected-AOC | ₹17.6 L | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | SHYN CONSTRUCTION L1 | SA Constructions L2 |
|---|---|---|---|---|---|
| 1.001. Providing CC Pavement at Pambukarankottai Anjaneyar koil road H/o. Billanakuppam. Estimate Amount: Rs. 17.60 lakhs. | |||||
| 2.00Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation. | |||||
| 3.00 | 1. Corewall | 67.5 | Cum | 131.85 ₹8,899.88 Lowest | 133.26 ₹8,995.05 |
| 4.00 | 2. R.Wall | 6.74 | Cum | 263.7 ₹1,777.34 Lowest | 266.52 ₹1,796.34 |
| 5.00 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation inmcluding watering wherever necessary and laid in layers of not more than 15cm thick., | 16.69 | Cum | 5,370.42 ₹89,632.31 Lowest | 5,427.9 ₹90,591.65 |
| 6.00 | Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc | 365.31 | Sqm | 547.34 ₹1,99,948.78 Lowest | 553.19 ₹2,02,085.84 |
| 7.00 | Plain Cement Concrete 1:3:6 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers. | 37.95 | Cum | 6,121.24 ₹2,32,301.06 Lowest | 6,186.76 ₹2,34,787.54 |
| 8.00 | Cement Concrete 1:3:6 (One Cement, Three M.Sand and Six broken stone jelly) using 40mm size hard broken stone jelly for dummy columns, excluding cost of centering shuttering reinforcement grills and fabrication charges but including curing etc. complete. (Reinforced Cement Concrete 1:2:4 for slab to be extended upto top of splashing with pressed tiles and future extension rods to be embedded in CC 1:3:6 (One Cement, Three M.Sand and Six hard broken stone jelly). Dummy columns should be at least 1 metre height) | 11.92 | Cum | 5,640.34 ₹67,232.85 Lowest | 5,700.71 ₹67,952.46 |
| 9.00 | Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) . | 76.25 | Cum | 1,772.53 ₹1,35,155.41 Lowest | 1,791.5 ₹1,36,601.88 |
| 10.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 95.31 | Cum | 2,196.99 ₹2,09,395.12 Lowest | 2,220.51 ₹2,11,636.81 |
Tender Value
₹17.6 L
EMD Value
₹18,000
Closing Date
16 Feb 2026, 3:00 pmClosed
The Block Development Officer, Veppanapalli
The Block Development Officer, Veppanapalli
Krishnagiri District, Veppanapalli block, MPLADS-2025-2026 Providing CC Road at Pambukaran Kottai Anjaneyar koil road H/o. Billanakuppam. Pkg.No. 2025-2026 VNPI 31
2026_RDTN_656095_1
ROC_NO_2091_2025_R7_16_01_2026
Open Tender
Civil Works
Item Rate
90 days
Veppanapalli
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹18,000
The Block Development Office, Veppanapalli
21 Aug 2026
12 Feb 2026
17 Feb 2026
12 Feb 2026
16 Feb 2026
12 Feb 2026
13 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 1. Providing CC Pavement at Pambukarankottai Anjaneyar koil road H/o. Billanakuppam. Estimate Amount: Rs. 17.60 lakhs. | - | - | - | - |
| 2 | Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation. | - | - | - | - |
| 3 | 1. Corewall | 67.5 | Cum | - | - |
| 4 | 2. R.Wall | 6.74 | Cum | - | - |
| 5 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation inmcluding watering wherever necessary and laid in layers of not more than 15cm thick., | 16.69 | Cum | - | - |
| 6 | Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc | 365.31 | Sqm | - | - |
| 7 | Plain Cement Concrete 1:3:6 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers. | 37.95 | Cum | - | - |
| 8 | Cement Concrete 1:3:6 (One Cement, Three M.Sand and Six broken stone jelly) using 40mm size hard broken stone jelly for dummy columns, excluding cost of centering shuttering reinforcement grills and fabrication charges but including curing etc. complete. (Reinforced Cement Concrete 1:2:4 for slab to be extended upto top of splashing with pressed tiles and future extension rods to be embedded in CC 1:3:6 (One Cement, Three M.Sand and Six hard broken stone jelly). Dummy columns should be at least 1 metre height) | - | Cum | - | - |
| 9 | Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) . | 76.25 | Cum | - | - |
| 10 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 95.31 | Cum | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.64 MB
pb31.pdf
Tender Documents • 0.19 MB
tb31.pdf
Tender Documents • 0.35 MB
BOQ_786741.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].