Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.3 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹5.6 L+₹30,463.22 (5.72%)Rejected-AOC | L2 | Rejected-AOC Accepted | |
| 3 | L3₹5.9 L+₹60,339.17 (11.3%)Rejected-AOC | L3 | Rejected-AOC Accepted | |
| 4 | L4₹5.9 L+₹60,583.44 (11.4%)Rejected-AOC | L4 | Rejected-AOC Accepted | |
| 5 | L5₹6.0 L+₹67,206.22 (12.6%)Rejected-AOC | L5 | Rejected-AOC Accepted |
| Sl No | Description | Qty | Unit | AKASH L6 | V.Sekaran L4 | DHANASEKARAN J L1 | J.MURUGANANDHAM L2 | PRATHEESH L5 | THIRUMALAI AGENCIES L3 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00VELLORE DISTRICT Gudiyatham Block Construction of New Drainage at Mullai Nagar Bhagavat Sigh Street in Nellorepet Panchayat Package No.8 | |||||||||
| 2.00 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20A | 85.4 | Cu.M | 265 ₹22,631 | 255.87 ₹21,851.3 | 229.5 ₹19,599.3 | 242.68 ₹20,724.87 | 258.5 ₹22,075.9 | 85.4 ₹7,293.16 Lowest |
| 3.00 | Cement concrete in 1:4:8 mix using 40mm ISS HBG metal including all Cost and conveyance of labour charges etc.,Complete., | 12.2 | Cu.M | 5,350 ₹65,270 | 5,174.8 ₹63,132.56 | 4,641.33 ₹56,624.23 | 4,908.07 ₹59,878.45 | 5,228.16 ₹63,783.55 | 800 ₹9,760 Lowest |
| 4.00 | Supplying & Erecting Centering for sides & soffits including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings complete complying for etc Complete (Below Gr. Level) | 292.8 | Sq.M | 555 ₹1,62,504 | 531 ₹1,55,476.8 | 476.33 ₹1,39,469.42 Lowest | 503.7 ₹1,47,483.36 | 536.55 ₹1,57,101.84 | 920 ₹2,69,376 |
| 5.00 | Supplying & Erecting Centering for sides & soffits including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings complete complying for etc Complete (Above Gr. Level) | 4.16 | Sq.M | 1,095 ₹4,555.2 | 1,062.15 ₹4,418.54 | 952.65 ₹3,963.02 Lowest | 1,007.4 ₹4,190.78 | 1,073.1 ₹4,464.1 | 3,679 ₹15,304.64 |
| 6.00 | Cement concrete in 1:2:4 mix using 20mm ISS HBG metal including all Cost and conveyance of labour charges etc.,Complete., | 33.67 | Cu.M | 6,640 ₹2,23,568.8 | 6,432.9 ₹2,16,595.74 | 5,769.73 ₹1,94,266.81 | 6,101.32 ₹2,05,431.44 | 6,499.23 ₹2,18,829.07 | 3,359 ₹1,13,097.53 Lowest |
| 7.00 | Supplying and fabrication of Steel to site and all labour charges for straightening, cutting to length, including all Cost and conveyance of labour charges etc.,Complete., | 0.04 | MTs. | 91,900 ₹4,135.5 | 89,138.44 ₹4,011.23 | 79,948.91 ₹3,597.7 | 84,543.68 ₹3,804.47 | 90,057.39 ₹4,052.58 | 1,045 ₹47.03 Lowest |
| 8.00 | Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | 0.75 | Cu.M | 9,066 ₹6,799.5 | 8,794.46 ₹6,595.85 | 7,888 ₹5,916 | 8,341.13 ₹6,255.85 | 8,885.12 ₹6,663.84 | 1,075 ₹806.25 Lowest |
| 9.00 | Plastering with Cement Mortar 1:5 (One cement and Five P.Sand), 20mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers. | 54.9 | Sq.M | 570 ₹31,293 | 552 ₹30,304.8 | 495.6 ₹27,208.44 Lowest | 524.08 ₹28,771.99 | 558.26 ₹30,648.47 | 1,550 ₹85,095 |
| 10.00 | Provision for Name Board Charges | 1 | No. | 1,000 ₹1,000 | 600 ₹600 Lowest | 1,000 ₹1,000 | 920 ₹920 | 980 ₹980 | 2,000.2 ₹2,000.2 |
Tender Value
Refer Docs
EMD Value
₹12,360
Closing Date
25 Feb 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
BLOCK DEVELOPEMETN OFFICER (VP)
PANCHAYAT UNION, GUDIYATHAM BLOCK
VELLORE DISTRICT GUDIYATHAM BLOCK Construction of New Drainage at Mullai Nagar Bhagavat Sigh Street in Nellorepet Panchayat Package No.8
2026_RDTN_661385_1
B1/504/2026
Open Tender
Civil Works
Item Rate
Gudiyatham
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹12,360
11 Mar 2026
19 Feb 2026
25 Feb 2026
19 Feb 2026
25 Feb 2026
19 Feb 2026
19 Feb 2026 - 25 Feb 2026
VELLORE DISTRICT Gudiyatham Block Construction of New Drainage at Mullai Nagar Bhagavat Sigh Street in Nellorepet Panchayat Package No.8
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20A
Cement concrete in 1:4:8 mix using 40mm ISS HBG metal including all Cost and conveyance of labour charges etc.,Complete.,
Supplying & Erecting Centering for sides & soffits including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings complete complying for etc Complete (Below Gr. Level)
Supplying & Erecting Centering for sides & soffits including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings complete complying for etc Complete (Above Gr. Level)
Cement concrete in 1:2:4 mix using 20mm ISS HBG metal including all Cost and conveyance of labour charges etc.,Complete.,
Supplying and fabrication of Steel to site and all labour charges for straightening, cutting to length, including all Cost and conveyance of labour charges etc.,Complete.,
Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers
Plastering with Cement Mortar 1:5 (One cement and Five P.Sand), 20mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Provision for Name Board Charges
GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column "BB" for all works in this package}
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_793832.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.64 MB
Tendernotice_2.pdf
PDF • 0.80 MB
BOQ_793832.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .